6461-35-001 |
FAYETTE |
YOAKUM |
$374,000 |
US0077 |
MMC - 646135001 |
03/06/2024 |
01/24/2024 |
EMULSION |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($370,150) |
|
6433-08-001 |
FAYETTE |
YOAKUM |
$382,500 |
US0077 |
MMC - 643308001 |
03/08/2023 |
11/15/2023 |
EMULSION |
WRIGHT ASPHALT PRODUCTS COMPANY LLC($357,100) |
|
6399-33-001 |
FAYETTE |
YOAKUM |
$292,000 |
IH0010 |
MMC - 639933001 |
06/15/2022 |
11/15/2023 |
ASPHIC PATCHING MATERIAL |
WALLER COUNTY ASPHALT INC.($255,738) |
|
6433-04-001 |
FAYETTE |
YOAKUM |
$146,875 |
US0077 |
MMC - 643304001 |
02/22/2023 |
11/15/2023 |
ASPHIC PATCHING MATERIAL |
WALLER COUNTY ASPHALT INC.($150,763) |
|
6402-89-001 |
FAYETTE |
YOAKUM |
$248,000 |
US0077 |
MMC - 640289001 |
02/22/2023 |
11/15/2023 |
LIMESTONE ROCK ASPH |
VULCAN CONSTRUCTION MATERIALS, LLC($252,500) |
|
6381-67-001 |
FAYETTE |
YOAKUM |
$296,400 |
IH0010 |
MMC - 638167001 |
11/30/2021 |
11/15/2023 |
LRA |
VULCAN CONSTRUCTION MATERIALS, LLC($365,228) |
|
6461-33-001 |
FAYETTE |
YOAKUM |
$43,050 |
US0077 |
MMC - 646133001 |
03/20/2024 |
02/07/2024 |
HYDRAULIC CEMENT |
TUFFTEX MATERIALS($42,525) |
|
0913-28-083 |
FAYETTE |
YOAKUM |
$2,563,920 |
CR |
BR 2021(903) |
03/08/2023 |
08/21/2024 |
BRIDGE REPL |
TREVWAY, INC.($2,596,559) |
|
0266-01-074 |
FAYETTE |
YOAKUM |
$281,050 |
SH 71 |
STP 2017(256)HES |
11/03/2016 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
TREVWAY, INC.($276,120) |
|
0026-02-037 |
FAYETTE |
YOAKUM |
$3,014,262 |
US 90 |
F 2021(544) |
12/02/2021 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
TREVWAY, INC.($2,774,625) |
|
0913-28-075 |
FAYETTE |
YOAKUM |
$753,398 |
CR |
BR 2020(821) |
07/02/2021 |
11/15/2023 |
BRIDGE REPL |
TREVWAY, INC.($805,991) |
|
6305-91-001 |
FAYETTE |
YOAKUM |
$357,115 |
SH0071 |
RMC - 630591001 |
11/03/2016 |
11/15/2023 |
EROSION REPAIRS |
TREVWAY, INC.($352,304) |
|
0913-28-066 |
FAYETTE |
YOAKUM |
$412,052 |
CR |
BR 2014(600) |
08/06/2019 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
TREVWAY, INC.($479,284) |
|
0913-28-067 |
FAYETTE |
YOAKUM |
$852,144 |
CR |
BR 1502(636) |
06/04/2019 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
TREVWAY, INC.($872,850) |
|
6316-34-001 |
FAYETTE |
YOAKUM |
$273,264 |
SH0159 |
RMC - 631634001 |
04/26/2017 |
11/15/2023 |
STRUCT IMPRVS |
TREVWAY, INC.($293,197) |
|
0334-08-037 |
FAYETTE |
YOAKUM |
$2,167,131 |
FM 154 |
BR 2023(900) |
06/02/2023 |
11/28/2023 |
BRIDGE REPL |
TREVWAY, INC.($1,628,762) |
|
0267-02-042 |
FAYETTE |
YOAKUM |
$606,441 |
SH 159 |
STP 2B23(027)HES |
08/02/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
TRAF-TEX, INC.($495,756) |
|
6433-02-001 |
FAYETTE |
YOAKUM |
$27,300 |
US0077 |
MMC - 643302001 |
02/22/2023 |
11/15/2023 |
LIME |
TOUCHSTONE RESOURCES, LLC($25,200) |
|
6461-27-001 |
FAYETTE |
YOAKUM |
$126,000 |
US0077 |
MMC - 646127001 |
03/20/2024 |
02/07/2024 |
ROCK/RIPRAP |
TOUCHSTONE RESOURCES, LLC($126,000) |
|
6356-24-001 |
FAYETTE |
YOAKUM |
$299,800 |
IH0010 |
MMC - 635624001 |
09/13/2022 |
09/24/2024 |
HYDRAULIC CEMENT (MATERIAL ONLY) YKM AO |
TOUCHSTONE RESOURCES, LLC($328,000) |
|
6433-00-001 |
FAYETTE |
YOAKUM |
$26,250 |
US0077 |
MMC - 643300001 |
02/22/2023 |
11/15/2023 |
HYDRAULIC CEMENT |
TOUCHSTONE RESOURCES, LLC($25,200) |
|
6402-77-001 |
FAYETTE |
YOAKUM |
$287,125 |
IH0010 |
MMC - 640277001 |
05/31/2022 |
11/15/2023 |
LIME |
TOUCHSTONE RESOURCES, LLC($330,500) |
|
6402-85-001 |
FAYETTE |
YOAKUM |
$260,000 |
IH0010 |
MMC - 640285001 |
09/06/2022 |
09/24/2024 |
ROCK/RIPRAP |
TOUCHSTONE RESOURCES, LLC($310,000) |
|
6393-66-001 |
FAYETTE |
YOAKUM |
$31,200 |
IH0010 |
MMC - 639366001 |
02/22/2022 |
11/15/2023 |
SNOW AND ICE CONTROL |
TOUCHSTONE RESOURCES, LLC($35,800) |
|
6461-34-001 |
FAYETTE |
YOAKUM |
$26,250 |
US0077 |
MMC - 646134001 |
03/20/2024 |
02/07/2024 |
LIME |
TOUCHSTONE RESOURCES, LLC($27,300) |
|
0026-02-037 |
FAYETTE |
YOAKUM |
$3,012,747 |
US 90 |
F 2021(544) |
05/06/2021 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
TI-ZACK CONCRETE, INC.($2,637,333) |
|
6356-16-001 |
FAYETTE |
YOAKUM |
$253,000 |
IH0010 |
MMC - 635616001 |
04/20/2020 |
11/15/2023 |
ASPHIC PATCHING MATERIAL (MATERIAL ONLY) |
TEXAS MATERIALS GROUP, INC.($235,475) |
|
6356-27-001 |
FAYETTE |
YOAKUM |
$204,950 |
IH0010 |
MMC - 635627001 |
10/19/2020 |
11/15/2023 |
LIME (MATERIAL ONLY) |
TEXAS LIME COMPANY($220,890) |
|
6334-50-001 |
FAYETTE |
YOAKUM |
$742,850 |
IH0010 |
BPM - 633450001 |
02/07/2020 |
11/15/2023 |
EROSION REPAIRS |
TALBRAN ENTERPRISES LLC($650,377) |
|
6359-86-001 |
FAYETTE |
YOAKUM |
$31,794 |
SH0071 |
RMC - 635986001 |
04/20/2020 |
11/15/2023 |
ADDING RUMBLE STRIPS |
STRIPE-A-ZONE, INC.($30,994) |
|
6369-61-001 |
FAYETTE |
YOAKUM |
$1,234,640 |
IH0010 |
RMC - 636961001 |
07/01/2021 |
11/15/2023 |
METAL BEAM GF UPGRADE/CONC REPAIRS |
SOUTHEAST HIGHWAY GUARDRAIL & ATTENUATORS, LLC($622,670) |
|
6324-45-001 |
FAYETTE |
YOAKUM |
$466,550 |
IH0010 |
RMC - 632445001 |
03/06/2018 |
11/15/2023 |
METAL GUARDFENCE REPAIR (ON CALL) |
SHORT-LINE CORPORATION($425,765) |
|
1440-01-020 |
FAYETTE |
YOAKUM |
$2,333,125 |
FM 957 |
BR 1902(289) |
08/07/2019 |
11/15/2023 |
BRIDGE REPL |
SB CONTRACTORS LLC($2,138,476) |
|
0913-28-078 |
FAYETTE |
YOAKUM |
$2,342,960 |
CR |
BR 2B20(277) |
06/01/2022 |
09/03/2024 |
BRIDGE REPL |
SB CONTRACTORS LLC($2,799,229) |
|
1498-01-008 |
FAYETTE |
YOAKUM |
$1,089,257 |
FM 1579 |
BR 1902(021) |
06/05/2019 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
SB CONTRACTORS LLC($1,026,049) |
|
6455-53-001 |
FAYETTE |
YOAKUM |
$10,300 |
SH0071 |
RMC - 645553001 |
10/10/2023 |
11/15/2023 |
JANITORIAL MAINT |
RWCS JANITORIAL LLC($9,030) |
|
0026-02-039 |
FAYETTE |
YOAKUM |
$22,403,766 |
US 90 |
F 2024(332) |
11/02/2023 |
11/15/2023 |
SEAL COAT |
RONALD R. WAGNER & CO., LP($19,785,796) |
|
0026-02-036 |
FAYETTE |
YOAKUM |
$16,065,124 |
US 90 |
STP 2021(113) |
11/05/2020 |
11/15/2023 |
SEAL COAT |
RONALD R. WAGNER & CO., LP($14,992,946) |
|
6356-36-001 |
FAYETTE |
YOAKUM |
$130,000 |
IH0010 |
MMC - 635636001 |
05/06/2020 |
09/26/2024 |
ROCK/RIPRAP (MATERIAL ONLY) |
RELMCO, INC.($105,000) |
|
0535-06-046 |
FAYETTE |
YOAKUM |
$1,391,920 |
IH 10 |
BR 2022(011) |
09/01/2021 |
11/15/2023 |
BRIDGE MAINT |
RAGLE CONSTRUCTION, INC.($1,588,807) |
|
6356-57-001 |
FAYETTE |
YOAKUM |
$294,800 |
IH0010 |
MMC - 635657001 |
03/25/2020 |
11/15/2023 |
HOT-MIX COLD-LAID (MATERIAL ONLY) |
QUALITY HOT MIX, INC.($286,000) |
|
6402-57-001 |
FAYETTE |
YOAKUM |
$296,000 |
IH0010 |
MMC - 640257001 |
05/06/2022 |
11/15/2023 |
HOT-MIX COLD-LAID |
QUALITY HOT MIX, INC.($355,200) |
|
6381-70-001 |
FAYETTE |
YOAKUM |
$156,000 |
IH0010 |
MMC - 638170001 |
11/09/2021 |
11/15/2023 |
FLEXIBLE BASE |
QUALITY HOT MIX, INC.($123,525) |
|
6381-92-001 |
FAYETTE |
YOAKUM |
$294,800 |
IH0010 |
MMC - 638192001 |
06/08/2021 |
11/15/2023 |
HOT-MIX COLD-LAID |
QUALITY HOT MIX, INC.($290,400) |
|
6410-82-001 |
FAYETTE |
YOAKUM |
$497,124 |
SH0071 |
RMC - 641082001 |
02/01/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
P-VILLE, INCORPORATED($727,274) |
|
0026-02-037 |
FAYETTE |
YOAKUM |
$3,012,747 |
US 90 |
F 2021(544) |
07/01/2021 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
PROJECT ALLIED RESOURCES, LLC($2,466,461) |
|
0114-08-036 |
FAYETTE |
YOAKUM |
$5,894,121 |
US 290 |
STP 2023(978)HES |
06/27/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MASSANA CONSTRUCTION INC.($5,309,909) |
|
6356-35-001 |
FAYETTE |
YOAKUM |
$274,900 |
IH0010 |
MMC - 635635001 |
05/06/2020 |
09/26/2024 |
ASPHS, OILS, AND EMULSIONS (MATERIAL ONLY) |
MARTIN RESOURCE MANAGEMENT CORPORATION($277,194) |
|
6398-20-001 |
FAYETTE |
YOAKUM |
$292,280 |
IH0010 |
MMC - 639820001 |
03/29/2022 |
11/15/2023 |
EMULSION |
MARTIN RESOURCE MANAGEMENT CORPORATION($312,357) |
|
6461-28-001 |
FAYETTE |
YOAKUM |
$254,000 |
US0077 |
MMC - 646128001 |
03/20/2024 |
02/07/2024 |
LIMESTONE ROCK ASPH |
MARTIN MARIETTA MATERIALS, INC.($245,460) |
|
0265-07-049 |
FAYETTE |
YOAKUM |
$2,626,050 |
SH 71 |
NH 1702(642) |
08/08/2017 |
11/15/2023 |
ACP OVERLAY |
LONE STAR PAVING COMPANY($2,399,995) |
|
3135-01-005 |
FAYETTE |
YOAKUM |
$1,987,084 |
FM 2714 |
C 3135-1-5 |
07/09/2019 |
09/27/2024 |
REHAB EXIST ROADWAY |
KNIFE RIVER CORPORATION - SOUTH($1,960,940) |
|
6380-64-001 |
FAYETTE |
YOAKUM |
$236,419 |
IH0010 |
MMC - 638064001 |
06/09/2021 |
11/15/2023 |
HYDRAULIC CEMENT |
KLP COMMERCIAL, L.L.C.($234,619) |
|
0913-28-066 |
FAYETTE |
YOAKUM |
$412,052 |
CR |
BR 2014(600) |
03/06/2019 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
JOHN REED AND COMPANY, LLC($385,310) |
|
6394-51-001 |
FAYETTE |
YOAKUM |
$1,234,640 |
IH0010 |
RMC - 639451001 |
02/04/2022 |
11/15/2023 |
METAL BEAM GF UPGRADE/CONC REPAIRS |
JCW CONSTRUCTION, LLC($959,885) |
|
0535-07-053 |
FAYETTE |
YOAKUM |
$10,408,947 |
IH 10 |
C 535-7-53 |
11/06/2024 |
09/25/2024 |
SURF/ROADWAY RESTOR |
HUNTER INDUSTRIES, LTD.($10,827,270) |
|
0026-03-042 |
FAYETTE |
YOAKUM |
$807,494 |
US 90 |
BR 2017(318) |
12/01/2016 |
11/15/2023 |
WIDEN BRIDGE AND APPROACHES |
HUNTER INDUSTRIES, LTD.($831,842) |
|
0535-07-050 |
FAYETTE |
YOAKUM |
$13,026,398 |
IH 10 |
NH 2021(119) |
11/04/2020 |
11/15/2023 |
ACP OVERLAY |
HUNTER INDUSTRIES, LTD.($10,399,532) |
|
0535-06-049 |
FAYETTE |
YOAKUM |
$10,245,886 |
IH 10 |
F 2B23(083) |
08/03/2023 |
11/15/2023 |
CONSTRUCT REST AREA |
HUNTER INDUSTRIES, LTD.($9,282,087) |
|
0267-03-030 |
FAYETTE |
YOAKUM |
$4,114,215 |
FM 609 |
STP 2021(348) |
02/04/2021 |
11/15/2023 |
PAVMT REPAIR AND SURF |
HUNTER INDUSTRIES, LTD.($3,404,044) |
|
0267-05-018 |
FAYETTE |
YOAKUM |
$7,562,573 |
FM 609 |
STP 2018(749) |
04/03/2018 |
11/15/2023 |
PAVMT REPAIR AND SURF |
HUNTER INDUSTRIES, LTD.($7,416,527) |
|
0211-06-059 |
FAYETTE |
YOAKUM |
$128,168,588 |
US 77 |
F 2024(576) |
01/05/2024 |
11/24/2023 |
WIDEN ROAD - ADD LANES |
HUNTER INDUSTRIES, LTD.($112,692,666) |
|
0267-02-038 |
FAYETTE |
YOAKUM |
$21,052,065 |
SH 159 |
C 267-2-38 |
12/05/2023 |
11/15/2023 |
SURF/ROADWAY RESTOR |
HUNTER INDUSTRIES, LTD.($21,356,225) |
|
0266-01-083 |
FAYETTE |
YOAKUM |
$16,067,131 |
SH 71 |
NH 2020(197) |
11/06/2019 |
11/15/2023 |
OVERLAY |
HUNTER INDUSTRIES, LTD.($15,790,738) |
|
0026-02-034 |
FAYETTE |
YOAKUM |
$2,999,043 |
US 90 |
STP 2021(586) |
06/03/2021 |
11/15/2023 |
SURF/ROADWAY RESTOR |
HUNTER INDUSTRIES, LTD.($2,724,322) |
|
0323-02-034 |
FAYETTE |
YOAKUM |
$16,938,585 |
SH 95 |
STP 1902(163) |
07/10/2019 |
09/27/2024 |
REHAB OF EXIST ROAD |
HUNTER INDUSTRIES, LTD.($15,550,417) |
|
2820-01-012 |
FAYETTE |
YOAKUM |
$6,542,148 |
FM 2762 |
C 2820-1-12 |
07/10/2019 |
09/27/2024 |
RESTORE EXIST ROADWAY |
HUNTER INDUSTRIES, LTD.($6,090,094) |
|
0913-28-082 |
FAYETTE |
YOAKUM |
$1,244,567 |
CR |
BR 2021(266) |
11/03/2022 |
11/15/2023 |
BRIDGE REPL |
HODGES AND SON CONSTRUCTION COMPANY, INC.($1,338,297) |
|
0913-28-064 |
FAYETTE |
YOAKUM |
$380,956 |
CR |
BR 2016(325) |
10/04/2017 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
HILL COUNTRY BRIDGE, INC.($349,288) |
|
6429-12-001 |
FAYETTE |
YOAKUM |
$1,961,050 |
IH0010 |
RMC - 642912001 |
02/02/2023 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR |
GARRET SHIELDS INFRASTRUCTURE($1,382,687) |
|
0266-01-075 |
FAYETTE |
YOAKUM |
$830,225 |
SH 71 |
STP 2017(486)HES |
01/05/2017 |
11/15/2023 |
SAFETY LIGHTING AT INTERS |
F & W ELECTRICAL CONTRACTORS, INC.($681,093) |
|
0026-03-045 |
FAYETTE |
YOAKUM |
$253,446 |
US 90 |
STP 2019(416)HES |
01/08/2019 |
11/15/2023 |
INSTL SAFETY LIGHTING |
F & W ELECTRICAL CONTRACTORS, INC.($235,017) |
|
0913-28-073 |
FAYETTE |
YOAKUM |
$1,425,164 |
CR |
BR 2B20(275) |
01/07/2022 |
11/15/2023 |
BRIDGE REPL |
FUQUA CONSTRUCTION CO., INC.($1,498,743) |
|
0913-28-070 |
FAYETTE |
YOAKUM |
$1,125,823 |
CR |
BR 2018(330) |
08/04/2022 |
11/15/2023 |
BRIDGE REPL |
FUQUA CONSTRUCTION CO., INC.($1,089,897) |
|
6317-91-001 |
FAYETTE |
YOAKUM |
$4,880,000 |
FM2503 |
RMC - 631791001 |
10/03/2017 |
11/15/2023 |
DW SEAL COAT |
F. N. PLOCH CONSTRUCTION COMPANY, INC.($4,647,884) |
|
6388-64-001 |
FAYETTE |
YOAKUM |
$2,592,600 |
IH0010 |
RMC - 638864001 |
11/03/2021 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR |
ELITE CASTLE RESOURCES LLC($1,747,594) |
|
6353-58-001 |
FAYETTE |
YOAKUM |
$2,586,600 |
IH0010 |
RMC - 635358001 |
02/07/2020 |
11/15/2023 |
METAL BEAM GUARDFENCE REPAIR (ON CALL) |
ELITE CASTLE RESOURCES LLC($1,973,450) |
|
0265-07-051 |
FAYETTE |
YOAKUM |
$2,148,827 |
SH 71 |
STP 2021(272) |
01/08/2021 |
11/15/2023 |
INSTL MEDIAN BARRIER |
D&S CONCRETE CONTRACTORS LLC($1,588,832) |
|
6374-50-001 |
FAYETTE |
YOAKUM |
$155,000 |
IH0010 |
MMC - 637450001 |
06/16/2021 |
11/15/2023 |
ROCK/RIPRAP (MATERIAL ONLY) |
DALRYMPLE GRAVEL AND CONTRACTING COMPANY, INC.($100,000) |
|
6426-62-001 |
FAYETTE |
YOAKUM |
$133,000 |
US0077 |
MMC - 642662001 |
02/22/2023 |
11/15/2023 |
ROCK/RIPRAP |
DALRYMPLE GRAVEL AND CONTRACTING COMPANY, INC.($101,500) |
|
6394-45-001 |
FAYETTE |
YOAKUM |
$431,350 |
IH0010 |
RMC - 639445001 |
12/02/2022 |
11/15/2023 |
BRIDGE PREVENT MAINT |
CRACKSEAL OF TEXAS, LLC($344,752) |
|
6377-76-001 |
FAYETTE |
YOAKUM |
$805,305 |
IH0010 |
BPM - 637776001 |
02/03/2022 |
11/15/2023 |
EROSION REPAIR |
CRACKSEAL OF TEXAS, LLC($701,128) |
|
6359-48-001 |
FAYETTE |
YOAKUM |
$829,195 |
IH0010 |
BPM - 635948001 |
03/05/2021 |
11/15/2023 |
BPM PROJECT |
CRACKSEAL OF TEXAS, LLC($629,250) |
|
0114-08-035 |
FAYETTE |
YOAKUM |
$2,020,953 |
US 290 |
STP 1802(396)HES |
07/11/2018 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.($2,098,141) |
|
6433-06-001 |
FAYETTE |
YOAKUM |
$318,000 |
US0077 |
MMC - 643306001 |
03/07/2023 |
11/15/2023 |
AGGREGATE |
COLORADO MATERIALS, LTD.($312,300) |
|
6402-47-001 |
FAYETTE |
YOAKUM |
$196,500 |
IH0010 |
MMC - 640247001 |
02/22/2023 |
11/15/2023 |
FLEXIBLE BASE |
COLORADO MATERIALS, LTD.($166,530) |
|
6461-30-001 |
FAYETTE |
YOAKUM |
$180,000 |
US0077 |
MMC - 646130001 |
03/20/2024 |
02/07/2024 |
FLEXIBLE BASE |
COLORADO MATERIALS, LTD.($163,500) |
|
6357-62-001 |
FAYETTE |
YOAKUM |
$10,000 |
IH0010 |
MMC - 635762001 |
03/25/2020 |
11/15/2023 |
FLEXIBLE BASE (MATERIAL ONLY) |
COLORADO MATERIALS, LTD.($7,068) |
|
6356-20-001 |
FAYETTE |
YOAKUM |
$294,000 |
IH0010 |
MMC - 635620001 |
03/25/2020 |
11/15/2023 |
AGGREGATES FOR SURF TREATMENTS (MATERIAL ONLY) |
COLORADO MATERIALS, LTD.($252,915) |
|
6391-57-001 |
FAYETTE |
YOAKUM |
$295,400 |
IH0010 |
MMC - 639157001 |
08/23/2022 |
11/15/2023 |
AGGREGATE |
COLORADO MATERIALS, LTD.($322,400) |
|
6380-84-001 |
FAYETTE |
YOAKUM |
$283,000 |
IH0010 |
MMC - 638084001 |
06/07/2021 |
11/15/2023 |
EMULSION |
CLEVELAND ASPHALT PRODUCTS, INC.($303,240) |
|
0026-03-049 |
FAYETTE |
YOAKUM |
$23,742,983 |
US 90 |
C 26-3-49 |
11/07/2024 |
09/26/2024 |
SEAL COAT |
CLARK CONSTRUCTION OF TEXAS, INC.($20,248,016) |
|
6358-84-001 |
FAYETTE |
YOAKUM |
$174,439 |
SH0071 |
RMC - 635884001 |
04/13/2020 |
11/15/2023 |
FRICTIONAL ASPHIC SURF PRESERVATION TRTMT |
CLARK CONSTRUCTION OF TEXAS, INC.($193,132) |
|
6382-00-001 |
FAYETTE |
YOAKUM |
$252,915 |
IH0010 |
MMC - 638200001 |
06/08/2021 |
11/15/2023 |
AGGREGATE |
CENTURY ASPHALT, LTD.($279,000) |
|
0265-14-012 |
FAYETTE |
YOAKUM |
$6,746,673 |
BS 71-E |
BR 2024(013) |
09/07/2023 |
11/15/2023 |
BRIDGE MAINT |
CEKRA INC.($8,209,128) |
|
1266-01-008 |
FAYETTE |
YOAKUM |
$868,706 |
FM 956 |
C 1266-1-8 |
10/02/2024 |
08/21/2024 |
BRIDGE REPL |
C. E. BARKER, LTD.($955,255) |
|
0913-28-092 |
FAYETTE |
YOAKUM |
$974,126 |
CR |
BR 2023(031) |
04/04/2024 |
02/22/2024 |
BRIDGE REPL |
C. E. BARKER, LTD.($954,925) |
|
6461-32-001 |
FAYETTE |
YOAKUM |
$331,800 |
US0077 |
MMC - 646132001 |
03/05/2024 |
01/23/2024 |
AGGREGATE |
BRAUNTEX MATERIALS, INC.($299,500) |
|
6461-22-001 |
FAYETTE |
YOAKUM |
$285,000 |
US0077 |
MMC - 646122001 |
03/20/2024 |
02/07/2024 |
HOT-MIX COLD-LAID |
BRAUNTEX MATERIALS, INC.($261,000) |
|
6432-94-001 |
FAYETTE |
YOAKUM |
$291,000 |
US0077 |
MMC - 643294001 |
02/22/2023 |
11/15/2023 |
HOT-MIX COLD-LAID |
BRAUNTEX MATERIALS, INC.($270,000) |