0924-00-119 |
EL PASO |
EL PASO |
$4,523,278 |
VA, ETC |
F 2025(291), ETC |
12/04/2024 |
11/10/2024 |
TRAF CONTROL DEVICES |
|
|
0924-06-601 |
EL PASO |
EL PASO |
$2,896,650 |
VA |
C 924-6-601 |
05/07/2020 |
11/15/2023 |
FY 2020 BRIDGE MAINT (EL PASO COUNTY) |
J.D. ABRAMS, L.P.($2,570,503) |
|
0924-06-603 |
EL PASO |
EL PASO |
$1,876,431 |
VA |
NH 2020(773) |
04/09/2020 |
11/15/2023 |
FY 2020 SIGNING PROJECT |
TRI STATE ELECTRIC, LTD.($1,766,831) |
|
0924-00-100 |
EL PASO |
EL PASO |
$2,057,697 |
VA |
STP 2019(575) |
02/05/2019 |
11/15/2023 |
FY 2019 STRIPING PROJECT |
MIJELUM($1,965,160) |
|
0924-06-635 |
EL PASO |
EL PASO |
$744,422 |
VA |
C 924-6-635 |
07/01/2021 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
MARTINEZ BROS. CONTRACTORS, LLC($797,516) |
|
0924-06-533 |
EL PASO |
EL PASO |
$1,454,157 |
VA |
NH 1702(500) |
07/12/2017 |
11/15/2023 |
VEGETATION LANDSCAPE |
ALLIED PAVING CO.($1,330,984) |
|
0924-00-109 |
EL PASO |
EL PASO |
$1,431,813 |
VA |
C 924-00-109 |
03/08/2023 |
08/21/2024 |
BRIDGE MAINT |
DAN WILLIAMS COMPANY($2,271,558) |
|
0924-00-110 |
EL PASO |
EL PASO |
$4,071,954 |
VA |
F 2023(474) |
02/01/2023 |
11/15/2023 |
PREVENT MAINT |
PMI PAVEMENT MARKING, LLC($3,850,596) |
|
0924-00-147 |
EL PASO |
EL PASO |
$3,811,438 |
VA |
F 2021(909) |
08/05/2021 |
11/15/2023 |
ADVANCED TRAF MGT SYSTEM CONNECTION |
TRI STATE ELECTRIC, LTD.($3,567,302) |
|
0924-00-143 |
EL PASO |
EL PASO |
$584,867 |
VA |
C 924-00-143 |
02/04/2021 |
11/15/2023 |
REPLACE GUARDRAIL |
E. G. L. CONSTRUCTION, INC.($469,044) |
|
0924-00-142 |
EL PASO |
EL PASO |
$2,965,381 |
VA |
STP 2020(535) |
02/07/2020 |
11/15/2023 |
FY 2020 STRIPING PROJECT |
CENTERLINE TECHNOLOGIES, LLC($2,744,921) |
|
0924-00-114 |
EL PASO |
EL PASO |
$4,558,404 |
VA |
C 924-00-114 |
12/06/2023 |
11/15/2023 |
PREVENT MAINT |
PMI PAVEMENT MARKING, LLC($4,800,000) |
|
0924-00-106 |
EL PASO |
EL PASO |
$3,425,853 |
VA |
C 924-00-106 |
02/04/2022 |
11/15/2023 |
PREVENT MAINT |
CENTERLINE TECHNOLOGIES, LLC($3,068,481) |
|
0924-00-168 |
EL PASO |
EL PASO |
$2,125,590 |
VA |
F 2B24(396) |
08/02/2024 |
06/21/2024 |
ADVANCED TRAF MGT SYSTEM |
TRI STATE ELECTRIC, LTD.($2,231,207) |
|
0924-00-105 |
EL PASO |
EL PASO |
$968,876 |
VA |
C 924-00-105 |
04/07/2022 |
09/24/2024 |
BRIDGE MAINT |
MIJELUM, L.L.C.($1,053,915) |
|
0924-00-098 |
EL PASO |
EL PASO |
$1,029,667 |
VA |
STP 2018(525) |
02/01/2018 |
11/15/2023 |
FY 2018 STRIPING PROJECT |
PMI PAVEMENT MARKING, INC.($783,671) |
|
0924-00-149 |
EL PASO |
EL PASO |
$677,150 |
VA |
C 924-00-149 |
02/02/2024 |
12/22/2023 |
PREVENT MAINT |
TRI STATE ELECTRIC, LTD.($793,768) |
|
0924-06-578 |
EL PASO |
EL PASO |
$503,337 |
VA |
NH 1802(477) |
07/10/2018 |
11/15/2023 |
VEGETATION LANDSCAPE |
ZTEX CONSTRUCTION, INC.($585,214) |
|
0924-00-130 |
EL PASO |
EL PASO |
$1,112,544 |
VA |
BR 2023(519) |
03/07/2023 |
08/21/2024 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($1,135,875) |
|
0924-06-689 |
EL PASO |
EL PASO |
$673,042 |
VA |
C 924-6-689 |
06/28/2023 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
INTERNATIONAL EAGLE ENTERPRISES, INC.($832,138) |
|
0924-06-620 |
EL PASO |
EL PASO |
$7,890,150 |
VA |
F 2022(823) |
09/07/2022 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
TRI STATE ELECTRIC, LTD.($8,297,286) |
|
0924-06-627 |
EL PASO |
EL PASO |
$509,882 |
VA |
C 924-6-627 |
03/05/2021 |
11/15/2023 |
BRIDGE MAINT |
SCR CIVIL CONSTRUCTION, LLC($431,802) |
|
0924-06-712 |
EL PASO |
EL PASO |
$1,076,196 |
VA |
C 924-6-712 |
06/05/2024 |
04/24/2024 |
PREVENT MAINT |
ROADWORX, INC. OF ILLINOIS($1,050,191) |
|
0924-06-450 |
EL PASO |
EL PASO |
$1,918,350 |
VA |
STP 2018(265) |
11/02/2017 |
11/15/2023 |
CONSTRUCT CURB RAMPS |
INTERNATIONAL EAGLE ENTERPRISES, INC.($1,766,127) |
|
0924-00-144 |
EL PASO |
EL PASO |
$1,574,143 |
VA |
C 924-00-144 |
02/05/2021 |
11/15/2023 |
PREVENT MAINT |
BATTERSON, LLP($1,343,420) |
|
0924-00-145 |
EL PASO |
EL PASO |
$328,416 |
VA |
C 924-00-145 |
06/01/2023 |
11/27/2023 |
PREVENT MAINT |
INTERNATIONAL EAGLE ENTERPRISES, INC.($338,675) |
|
0924-00-099 |
EL PASO |
EL PASO |
$2,076,392 |
VA |
STP 2018(932) |
06/05/2018 |
11/15/2023 |
FY 2018 BRIDGE MAINT |
DAN WILLIAMS COMPANY($2,093,680) |
|
0924-06-649 |
EL PASO |
EL PASO |
$499,042 |
VA |
C 924-6-649 |
03/04/2022 |
11/15/2023 |
PREVENT MAINT |
MIJELUM, L.L.C.($485,120) |
|
0924-06-700 |
EL PASO |
EL PASO |
$413,160 |
VA |
C 924-6-700 |
02/01/2024 |
12/21/2023 |
PREVENT MAINT |
HJC FARMS, INC.($458,260) |
|
0924-06-663 |
EL PASO |
EL PASO |
$849,610 |
VA |
C 924-6-663 |
06/30/2022 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
HORIZONE CONSTRUCTION I, LTD($995,591) |
|
0001-04-099 |
EL PASO |
EL PASO |
$5,745,766 |
US 85 |
BR 2024(837) |
04/04/2024 |
02/22/2024 |
BRIDGE REPL |
DAN WILLIAMS COMPANY($4,910,196) |
|
0002-12-023 |
EL PASO |
EL PASO |
$3,541,670 |
US 62 |
STP 2017(574)HES |
04/04/2017 |
11/15/2023 |
IMPROVE TRAF SIGNAL, ETC. |
TRI STATE ELECTRIC, LTD.($3,537,953) |
|
0374-02-107 |
EL PASO |
EL PASO |
$850,074 |
US 62 |
CM 2019(991) |
06/05/2019 |
11/15/2023 |
OPERATIONAL IMPRVS |
INTERNATIONAL EAGLE ENTERPRISES, INC.($1,033,028) |
|
0001-04-102 |
EL PASO |
EL PASO |
$1,675,807 |
US 62 |
F 2B24(190) |
06/05/2024 |
04/24/2024 |
HAZARD ELIM & SAFETY |
MARTINEZ BROS. CONTRACTORS, LLC($1,541,373) |
|
0374-02-097 |
EL PASO |
EL PASO |
$129,137,745 |
US 62 |
NH 2019(063) |
10/03/2018 |
11/15/2023 |
BUILD FRONTAGE ROADS AND MAINLANES |
JORDAN FOSTER CONSTRUCTION, LLC($144,207,911) |
|
0374-02-122 |
EL PASO |
EL PASO |
$100,498 |
US 62 |
STP 2023(536)HES |
03/07/2023 |
08/21/2024 |
HAZARD ELIM & SAFETY |
ZTEX CONSTRUCTION, INC.($103,530) |
|
0002-12-025 |
EL PASO |
EL PASO |
$631,066 |
US 62 |
CM 1702(498) |
07/11/2017 |
11/15/2023 |
OPERATIONAL IMPRVS |
TRI STATE ELECTRIC, LTD.($724,709) |
|
0374-02-120 |
EL PASO |
EL PASO |
$10,656,964 |
US 62 |
C 374-2-120 |
03/05/2024 |
01/23/2024 |
PREVENT MAINT |
INTERNATIONAL EAGLE ENTERPRISES, INC.($9,875,875) |
|
0374-02-115 |
EL PASO |
EL PASO |
$1,414,745 |
US 62 |
STP 2021(622)HES |
06/03/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
J. A. R. CONCRETE, INC.($1,402,626) |
|
0167-01-113 |
EL PASO |
EL PASO |
$97,716,680 |
US 54 |
NH 2019(166) |
11/06/2018 |
11/15/2023 |
INTERCHANGE IMPRVS |
SUNDT CONSTRUCTION, INC.($96,506,598) |
|
0167-01-126 |
EL PASO |
EL PASO |
$1,412,597 |
US 54 |
STP 2022(821)HES |
08/03/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
DEL MAR CONTRACTING, INC.($2,140,781) |
|
0167-01-127 |
EL PASO |
EL PASO |
$535,791 |
US 54 |
CM 2020(778) |
04/08/2020 |
11/15/2023 |
INSTL OF RVSD AND CCTVS |
TRI STATE ELECTRIC, LTD.($587,855) |
|
0167-01-120 |
EL PASO |
EL PASO |
$993,343 |
US 54 |
NH 2020(874) |
04/09/2020 |
11/15/2023 |
MILL AND INLAY (FRONTAGE ROAD) |
ALLIED PAVING CO.($719,532) |
|
0167-01-095 |
EL PASO |
EL PASO |
$35,832,998 |
US 54 |
STP 1702(687)MM |
08/08/2017 |
11/15/2023 |
WIDEN BY ADDING TWO INSIDE LANES, ETC. |
DAN WILLIAMS COMPANY($33,676,149) |
|
0167-01-128 |
EL PASO |
EL PASO |
$9,162,847 |
US 54 |
NH 2020(602) |
02/06/2020 |
11/15/2023 |
PREVENT MAINT |
J.D. ABRAMS, L.P.($7,012,064) |
|
0167-01-117 |
EL PASO |
EL PASO |
$1,458,170 |
US 54 |
STP 2B20(101)HES |
08/06/2020 |
11/15/2023 |
MODIFY EXIST RAMPS, SIGNING & PAVMT MRK |
MARTINEZ BROS. CONTRACTORS, LLC($1,639,703) |
|
0167-01-117 |
EL PASO |
EL PASO |
$1,849,005 |
US 54 |
STP 2B20(101)HES |
12/03/2020 |
11/15/2023 |
MODIFY EXIST RAMPS, SIGNING & PAVMT MRK |
SYNERGY PROJECT CONTRACTORS, INC.($1,650,011) |
|
6333-17-001 |
EL PASO |
EL PASO |
$44,230 |
US0062 |
RMC - 633317001 |
07/26/2018 |
11/15/2023 |
PICNIC MAINENANCE |
MESA D CORP.($43,298) |
|
6368-20-001 |
EL PASO |
EL PASO |
$96,425 |
US0054 |
MMC - 636820001 |
10/27/2020 |
11/15/2023 |
DE-ICING/ANTI-ICING (MATERIAL ONLY) |
THE BARGAIN SOURCE($65,800) |
|
6443-94-001 |
EL PASO |
EL PASO |
$217,475 |
US0054 |
MMC - 644394001 |
06/15/2023 |
11/15/2023 |
ASPHIC PATCHING MATERIAL |
TOUCHSTONE RESOURCES, LLC($235,500) |
|
6365-78-001 |
EL PASO |
EL PASO |
$1,000 |
US0054 |
MMC - 636578001 |
10/22/2020 |
11/15/2023 |
LIME (MATERIAL ONLY) |
E.V.G. ENTERPRISE($7,500) |
|
6474-37-001 |
EL PASO |
EL PASO |
$172,200 |
US0054 |
MMC - 647437001 |
11/26/2024 |
10/15/2024 |
ASPHIC PATCHING MATERIAL |
|
|
6339-57-001 |
EL PASO |
EL PASO |
$526,870 |
US0054 |
BPM - 633957001 |
05/08/2020 |
11/15/2023 |
BPM |
MARTINEZ BROS. CONTRACTORS, LLC($485,855) |
|
6361-52-001 |
EL PASO |
EL PASO |
$122,735 |
US0054 |
MMC - 636152001 |
07/23/2020 |
09/26/2024 |
ASPHIC CONC PATCHING MATERIAL-MATERIAL ONL |
PASO DEL NORTE MATERIALS, LLC($90,900) |
|
6388-39-001 |
EL PASO |
EL PASO |
$80,000 |
US0054 |
MMC - 638839001 |
09/28/2021 |
11/15/2023 |
ASPHIC PATCHING MATERIAL |
MESA D CORP.($110,175) |
|
6365-83-001 |
EL PASO |
EL PASO |
$44,522 |
US0054 |
MMC - 636583001 |
09/17/2020 |
11/15/2023 |
AGGREGATE (GR5) (MATERIALS ONLY) |
PASO DEL NORTE MATERIALS, LLC($41,500) |
|
6372-07-001 |
EL PASO |
EL PASO |
$722 |
US0054 |
MMC - 637207001 |
11/12/2020 |
11/15/2023 |
CONC REPAIR MATERIAL (MATERIAL ONLY) |
MESA D CORP.($8,100) |
|
6416-82-001 |
EL PASO |
EL PASO |
$156,250 |
US0054 |
MMC - 641682001 |
08/23/2022 |
11/15/2023 |
ASPHIC PATCHING MATERIAL |
TOUCHSTONE RESOURCES, LLC($214,750) |
|
3572-01-006 |
EL PASO |
EL PASO |
$838,324 |
SS 6 |
C 3572-1-6 |
07/11/2018 |
11/15/2023 |
MILL AND OVERLAY |
ALLIED PAVING CO.($735,010) |
|
0665-02-002 |
EL PASO |
EL PASO |
$20,980,783 |
SS 320 |
F 2023(613) |
04/04/2023 |
08/22/2024 |
CONSTRUCT FRONTAGE ROADS |
JORDAN FOSTER CONSTRUCTION, LLC($17,835,786) |
|
2552-02-034 |
EL PASO |
EL PASO |
$982,043 |
SL 375 |
C 2552-2-34 |
06/04/2020 |
11/15/2023 |
MILL & OVERLAY CLEANING/RESEAL BRIDGE JOINTS |
DAN WILLIAMS COMPANY($777,686) |
|
2552-03-063 |
EL PASO |
EL PASO |
$3,032,389 |
SL 375 |
C 2552-3-63 |
03/07/2018 |
11/15/2023 |
CONSTRUCT 1 NOISE WALLS |
INTERNATIONAL EAGLE ENTERPRISES, INC.($4,497,506) |
|
2552-05-002 |
EL PASO |
EL PASO |
$1,214,385 |
SL 375 |
F 2021(656) |
04/07/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
LESNA CONSTRUCTION, INC.($1,287,746) |
|
2552-01-058 |
EL PASO |
EL PASO |
$16,799,428 |
SL 375 |
STP 1902(114)HES |
07/10/2019 |
09/27/2024 |
REHAB OF EXIST ROAD |
J. A. R. CONCRETE, INC.($13,858,443) |
|
2552-03-065 |
EL PASO |
EL PASO |
$12,257,957 |
SL 375 |
C 2552-3-65 |
04/04/2024 |
02/22/2024 |
SURF/ROADWAY RESTOR |
DAN WILLIAMS COMPANY($10,150,487) |
|
2552-03-049 |
EL PASO |
EL PASO |
$72,014,802 |
SL 375 |
NH 2013(875) |
07/08/2020 |
11/15/2023 |
WIDEN FROM 4 TO 6 LANES DIVIDED |
J.D. ABRAMS, L.P.($75,428,369) |
|
2552-03-070 |
EL PASO |
EL PASO |
$831,043 |
SL 375 |
F 2022(824) |
08/04/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
INTERNATIONAL EAGLE ENTERPRISES, INC.($678,787) |
|
2552-03-059 |
EL PASO |
EL PASO |
$2,635,073 |
SL 375 |
F 2021(800) |
08/05/2021 |
11/15/2023 |
SURF/ROADWAY RESTOR |
J.D. ABRAMS, L.P.($1,991,402) |
|
2552-02-035 |
EL PASO |
EL PASO |
$4,730,247 |
SL 375 |
C 2552-2-35 |
08/04/2021 |
11/15/2023 |
INTERCHANGE IMPRV |
INTERNATIONAL EAGLE ENTERPRISES, INC.($3,808,795) |
|
2552-04-046 |
EL PASO |
EL PASO |
$5,239,157 |
SL 375 |
C 2552-4-46 |
07/02/2021 |
11/15/2023 |
SURF/ROADWAY RESTOR |
J. A. R. CONCRETE, INC.($3,878,272) |
|
2552-02-028 |
EL PASO |
EL PASO |
$102,649,005 |
SL 375 |
NH 2019(168) |
05/04/2022 |
08/31/2024 |
CONSTRUCT NEW ROAD |
JORDAN FOSTER CONSTRUCTION, LLC($137,955,531) |
|
2552-03-058 |
EL PASO |
EL PASO |
$30,216,719 |
SL 375 |
NH 1802(575) |
10/03/2018 |
11/15/2023 |
LP 375 RAMPS & FRONTAGE ROADS |
JORDAN FOSTER CONSTRUCTION, LLC($32,640,631) |
|
6315-91-001 |
EL PASO |
EL PASO |
$205,208 |
SL0478 |
RMC - 631591001 |
04/20/2017 |
11/15/2023 |
TRAMWAY PARK REHAB |
ALLIED PAVING CO.($178,718) |
|
6331-08-001 |
EL PASO |
EL PASO |
$238,786 |
SL0375 |
RMC - 633108001 |
05/30/2018 |
11/15/2023 |
CHAINLINK FENCE REPAIR |
E. G. L. CONSTRUCTION, INC.($253,280) |
|
6475-32-001 |
EL PASO |
EL PASO |
$311,000 |
SL0375 |
MMC - 647532001 |
11/08/2024 |
10/17/2024 |
WINTER WEATHER MATERIAL |
NSG LOGISTICS, LLC($278,887) |
|
6443-62-001 |
EL PASO |
EL PASO |
$69,800 |
SL0375 |
MMC - 644362001 |
08/01/2023 |
11/15/2023 |
FLEXIBLE BASE |
JOBE MATERIALS, L.P.($46,400) |
|
6417-73-001 |
EL PASO |
EL PASO |
$66,800 |
SL0375 |
MMC - 641773001 |
08/25/2022 |
11/15/2023 |
FLEXIBLE BASE |
JOBE MATERIALS, L.P.($77,150) |
|
6365-77-001 |
EL PASO |
EL PASO |
$279,870 |
SL0375 |
MMC - 636577001 |
09/17/2020 |
11/15/2023 |
DE-ICING/ANTI-ICING (MATERIAL ONLY) |
DIGG COMMERCIAL, LLC($327,750) |
|
6401-28-001 |
EL PASO |
EL PASO |
$149,000 |
SL0375 |
MMC - 640128001 |
05/10/2022 |
11/15/2023 |
AGGREGATE |
TOUCHSTONE RESOURCES, LLC($142,500) |
|
6361-50-001 |
EL PASO |
EL PASO |
$79,044 |
SL0375 |
MMC - 636150001 |
07/23/2020 |
09/26/2024 |
FLEXIBLE BASE (MATERIAL ONLY) |
PASO DEL NORTE MATERIALS, LLC($77,850) |
|
6331-07-001 |
EL PASO |
EL PASO |
$29,200 |
SL0375 |
RMC - 633107001 |
05/30/2018 |
11/15/2023 |
TRANSMOUNTAIN PICNIC AREA MAINT |
MESA D CORP.($36,000) |
|
6396-17-001 |
EL PASO |
EL PASO |
$48,000 |
SL0375 |
RMC - 639617001 |
02/15/2022 |
11/15/2023 |
PICNIC AREA MAINT |
C&C SOSA COMPANY, LLC($43,200) |
|
6320-44-001 |
EL PASO |
EL PASO |
$28,800 |
SL0375 |
RMC - 632044001 |
08/10/2017 |
11/15/2023 |
PICNIC AREA MAINT |
MESA D CORP.($30,000) |
|
6346-00-001 |
EL PASO |
EL PASO |
$34,900 |
SL0375 |
RMC - 634600001 |
08/31/2020 |
11/15/2023 |
PICNIC AREA MAINT |
SYNERGY PROJECT CONTRACTORS, INC.($38,736) |
|
6389-41-001 |
EL PASO |
EL PASO |
$60,000 |
SL0375 |
MMC - 638941001 |
11/09/2021 |
11/15/2023 |
SAND (MATERIAL ONLY) |
JOBE MATERIALS, L.P.($69,401) |
|
6441-33-001 |
EL PASO |
EL PASO |
$141,500 |
SL0375 |
MMC - 644133001 |
05/18/2023 |
11/15/2023 |
AGGREGATE |
JOBE MATERIALS, L.P.($145,450) |
|
6466-83-001 |
EL PASO |
EL PASO |
$103,600 |
SL0375 |
MMC - 646683001 |
06/13/2024 |
05/02/2024 |
AGGREGATE |
JOBE MATERIALS, L.P.($126,300) |
|
6392-92-001 |
EL PASO |
EL PASO |
$107,600 |
SL0375 |
MMC - 639292001 |
12/07/2021 |
11/15/2023 |
FLEXIBLE BASE (MATERIAL ONLY) |
JOBE MATERIALS, L.P.($107,050) |
|
6317-05-001 |
EL PASO |
EL PASO |
$168,450 |
SL0375 |
RMC - 631705001 |
08/10/2017 |
11/15/2023 |
CHAIN LINK FENCE REPAIR |
KEGLEY, INC.($187,345) |
|
6385-08-001 |
EL PASO |
EL PASO |
$114,000 |
SL0375 |
MMC - 638508001 |
08/26/2021 |
11/15/2023 |
AGGREGATE |
JOBE MATERIALS, L.P.($63,465) |
|
6443-60-001 |
EL PASO |
EL PASO |
$354,840 |
SL0375 |
MMC - 644360001 |
08/02/2023 |
11/15/2023 |
DE-ICING SALT |
NSG LOGISTICS, LLC($299,056) |
|
6388-14-001 |
EL PASO |
EL PASO |
$1,848,217 |
SL0375 |
RMC - 638814001 |
11/03/2021 |
11/15/2023 |
RMVL AND PROPOSED CHAIN LINK FENCE REPAIR |
DAN WILLIAMS COMPANY($1,884,369) |
|
6457-83-001 |
EL PASO |
EL PASO |
$49,680 |
SL0375 |
RMC - 645783001 |
03/07/2024 |
01/25/2024 |
PICNIC AREA MAINT |
C&C SOSA COMPANY, LLC($38,400) |
|
6365-88-001 |
EL PASO |
EL PASO |
$5,420 |
SL0375 |
MMC - 636588001 |
10/27/2020 |
11/15/2023 |
HYDRAULIC CEMENT (MATERIALS ONLY) |
TOUCHSTONE RESOURCES, LLC($10,960) |
|
6359-28-001 |
EL PASO |
EL PASO |
$2,828,049 |
SL0375 |
RMC - 635928001 |
05/08/2020 |
11/15/2023 |
REHAB OF ROADWAY |
J. A. R. CONCRETE, INC.($2,225,975) |
|
6342-32-001 |
EL PASO |
EL PASO |
$583,310 |
SL0375 |
RMC - 634232001 |
09/06/2019 |
11/15/2023 |
CRACK SEAL |
CHAMPION INFRASTRUCTURE, LLC($469,664) |
|
6372-89-001 |
EL PASO |
EL PASO |
$1,368,917 |
SL0375 |
RMC - 637289001 |
12/02/2020 |
11/15/2023 |
RMVL AND PROPOSED CHAIN LINK FENCE |
INTERNATIONAL EAGLE ENTERPRISES, INC.($1,077,631) |
|
0001-02-076 |
EL PASO |
EL PASO |
$3,219,859 |
SH 20 |
C 1-2-76 |
06/27/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
MARTINEZ BROS. CONTRACTORS, LLC($3,070,094) |
|
0001-02-055 |
EL PASO |
EL PASO |
$12,898,155 |
SH 20 |
NH 2019(781) |
11/06/2019 |
11/15/2023 |
REHAB OF EXIST ROAD |
J. A. R. CONCRETE, INC.($11,457,248) |
|
0001-02-060 |
EL PASO |
EL PASO |
$965,164 |
SH 20 |
STP 2019(705)HES |
08/07/2019 |
11/15/2023 |
HAZARD ELIM & SAFETY |
TRI STATE ELECTRIC, LTD.($1,060,041) |