All Jobs

 
All My Jobs
Clear:
Export:
My Jobs:
Results: 8
Selected:
Total: $35,406,833.95
Filtered by: CAMP county
Control County District Estimate Highway Project Date Added Type Low bidder
6361-92-001 CAMP ATLANTA $530,645 FM1975 RMC - 636192001 06/05/2020 11/15/2023 INSTL OF PAVMT MRK STRIPING TECHNOLOGY, L.P.($549,004)
0083-08-053 CAMP ATLANTA $552,628 SH 11 STP 1902(049)HES 06/04/2019 11/15/2023 IMPROVE TRAF SIGNAL STRIPING TECHNOLOGY, L.P.($583,202)
0248-02-063 CAMP ATLANTA $594,326 US 271 STP 2017(720)HES 02/02/2017 11/15/2023 IMPROVE TRAF SIG STRIPING TECHNOLOGY, L.P.($599,736)
0083-07-043 CAMP ATLANTA $1,137,474 SH 11 STP 2019(261)HES 12/06/2018 11/15/2023 LED FLASHING CHEVRONS ON CURVE STRIPE-A-ZONE, INC.($840,487)
6304-13-001 CAMP ATLANTA $665,850 FM0993 BPM - 630413001 02/02/2017 11/15/2023 BRIDGE PROTECTIVE MAINT STATELINE CONSTRUCTION, LLC($743,841)
3403-01-001 CAMP ATLANTA $7,689,048 SL 255 STP 2021(267) 01/07/2021 11/15/2023 CONSTRUCTION OF A NEW 2-LANE ROADWAY R & G CONSTRUCTION, LLC($5,634,658)
0083-07-044 CAMP ATLANTA $844,813 SH 11 STP 2019(129)HES 10/03/2018 11/15/2023 UPGRADE MBGF ODUM SERVICES, LLC($934,655)
0919-21-029 CAMP ATLANTA $324,906 CS STP 2017(200)TAPS 10/04/2017 11/15/2023 CONSTRUCT SIDEWALKS HIGHWAY 19 CONSTRUCTION LLC($309,168)