6308-17-001 |
BEXAR |
SAN ANTONIO |
$202,650 |
IH0010 |
RMC - 630817001 |
09/14/2016 |
11/15/2023 |
CLEANING AND CRACK SEALING ROADWAYS |
M & M STRIPING & POWER WASHING, LLC($196,860) |
|
6313-44-001 |
BEXAR |
SAN ANTONIO |
$289,264 |
IH0035 |
RMC - 631344001 |
05/24/2017 |
11/15/2023 |
INSTL CONC RIPRAP AND GABIONS |
TMES LLC($260,354) |
|
6315-50-001 |
BEXAR |
SAN ANTONIO |
$269,831 |
IH0010 |
RMC - 631550001 |
05/24/2017 |
11/15/2023 |
TRAF SIGNAL MAINT AND REPAIR |
E-Z BEL CONSTRUCTION, LLC($288,960) |
|
6322-32-001 |
BEXAR |
SAN ANTONIO |
$273,560 |
IH0010 |
RMC - 632232001 |
09/27/2017 |
11/15/2023 |
CRACK SEAL |
FYL ENTERPRISES, LLC($297,008) |
|
6326-59-001 |
BEXAR |
SAN ANTONIO |
$72,262 |
IH0010 |
RMC - 632659001 |
03/14/2018 |
11/15/2023 |
CONC RAIL AND RETAINING WALL REPAIR |
TREVWAY, INC.($86,469) |
|
6315-40-001 |
BEXAR |
SAN ANTONIO |
$135,070 |
IH0410 |
RMC - 631540001 |
04/18/2018 |
11/15/2023 |
CHANNEL MAINT |
NEW BRAUNFELS CONTRACTING, LLC($104,500) |
|
6327-64-001 |
BEXAR |
SAN ANTONIO |
$129,236 |
FM1957 |
RMC - 632764001 |
05/24/2018 |
11/15/2023 |
INSTL LOOM TURNAROUND |
CURRAN CONTRACTING COMPANY($191,352) |
|
6331-54-001 |
BEXAR |
SAN ANTONIO |
$282,137 |
IH0035 |
RMC - 633154001 |
09/12/2018 |
11/15/2023 |
CLEANING AND SEALING CRACKS |
TEXCON GENERAL CONTRACTORS($259,046) |
|
6348-35-001 |
BEXAR |
SAN ANTONIO |
$129,578 |
US0281 |
RMC - 634835001 |
11/13/2019 |
11/15/2023 |
STORM SEWER SYSTEM UPGRADE |
MPB, INC.($163,900) |
|
6352-81-001 |
BEXAR |
SAN ANTONIO |
$284,489 |
FM1560 |
RMC - 635281001 |
03/17/2020 |
11/15/2023 |
RETAINING WALL RAIL RETROFIT |
DAN WILLIAMS COMPANY($370,997) |
|
6359-26-001 |
BEXAR |
SAN ANTONIO |
$295,000 |
IH0410 |
MMC - 635926001 |
04/14/2020 |
11/15/2023 |
MATERIAL ONLY DELIVERY OF HMA |
CENTURY ASPHALT, LTD.($271,550) |
|
6359-81-001 |
BEXAR |
SAN ANTONIO |
$295,000 |
IH0410 |
MMC - 635981001 |
04/14/2020 |
11/15/2023 |
MATERIAL ONLY DELIVERY OF HMA |
CENTURY ASPHALT, LTD.($270,600) |
|
6349-75-001 |
BEXAR |
SAN ANTONIO |
$292,181 |
MR0681 |
RMC - 634975001 |
04/15/2020 |
11/15/2023 |
ROUTINE MAINT CONTRACT |
LONE STAR PAVING COMPANY($195,505) |
|
6369-05-001 |
BEXAR |
SAN ANTONIO |
$159,995 |
MR0681 |
RMC - 636905001 |
03/17/2021 |
11/15/2023 |
OVERLAY. |
TEXAS MATERIALS GROUP, INC.($104,732) |
|
6382-84-001 |
BEXAR |
SAN ANTONIO |
$264,510 |
IH0410 |
RMC - 638284001 |
06/16/2021 |
11/15/2023 |
CRACK SEAL |
TALBRAN ENTERPRISES LLC($261,303) |
|
6377-93-001 |
BEXAR |
SAN ANTONIO |
$282,750 |
IH0010 |
MMC - 637793001 |
06/16/2021 |
11/15/2023 |
LIMESTONE ROCK AND ASPH |
VULCAN CONSTRUCTION MATERIALS, LLC($293,955) |
|
6378-02-001 |
BEXAR |
SAN ANTONIO |
$284,000 |
IH0010 |
MMC - 637802001 |
10/20/2021 |
11/15/2023 |
WINTER WEATHER MATERIAL |
TOUCHSTONE RESOURCES, LLC($250,300) |
|
6378-03-001 |
BEXAR |
SAN ANTONIO |
$178,650 |
IH0010 |
MMC - 637803001 |
10/20/2021 |
11/15/2023 |
WINTER WEATHER MATERIALS |
SOUTHWEST ENVIROTX PARTNERS, LLC($153,654) |
|
6378-04-001 |
BEXAR |
SAN ANTONIO |
$232,000 |
IH0010 |
MMC - 637804001 |
10/20/2021 |
11/15/2023 |
WINTER WEATHER MATERIALS |
VULCAN CONSTRUCTION MATERIALS, LLC($66,474) |
|
6391-04-001 |
BEXAR |
SAN ANTONIO |
$283,250 |
IH0010 |
MMC - 639104001 |
10/20/2021 |
11/15/2023 |
DENSE GRADED HOT MIX |
TEXAS MATERIALS GROUP, INC.($261,800) |
|
6391-80-001 |
BEXAR |
SAN ANTONIO |
$268,000 |
IH0035 |
MMC - 639180001 |
11/23/2021 |
11/15/2023 |
HOT-MIX COLD-LAID |
TEXAS MATERIALS GROUP, INC.($298,000) |
|
6391-81-001 |
BEXAR |
SAN ANTONIO |
$244,500 |
IH0035 |
MMC - 639181001 |
11/23/2021 |
11/15/2023 |
HYDRAULIC CEMENT |
TOUCHSTONE RESOURCES, LLC($136,500) |
|
6391-82-001 |
BEXAR |
SAN ANTONIO |
$199,200 |
IH0035 |
MMC - 639182001 |
03/16/2022 |
11/15/2023 |
FLOWABLE FILL |
TOUCHSTONE RESOURCES, LLC($171,000) |
|
6397-46-001 |
BEXAR |
SAN ANTONIO |
$266,000 |
IH0010 |
MMC - 639746001 |
03/16/2022 |
11/15/2023 |
DENSE GRADED HOT MIX |
VULCAN CONSTRUCTION MATERIALS, LLC($332,800) |
|
6392-28-001 |
BEXAR |
SAN ANTONIO |
$262,600 |
IH0410 |
MMC - 639228001 |
03/17/2022 |
11/15/2023 |
AGGREGATE |
VULCAN CONSTRUCTION MATERIALS, LLC($334,857) |
|
6398-39-001 |
BEXAR |
SAN ANTONIO |
$268,850 |
IH0010 |
MMC - 639839001 |
03/17/2022 |
11/15/2023 |
HOT-MIX COLD-LAID |
BRAUNTEX MATERIALS, INC.($272,400) |
|
6392-27-001 |
BEXAR |
SAN ANTONIO |
$242,840 |
IH0010 |
MMC - 639227001 |
04/20/2022 |
11/15/2023 |
EMULSION |
ERGON ASPHALT & EMULSIONS, INC.($251,090) |
|
6403-64-001 |
BEXAR |
SAN ANTONIO |
$211,540 |
IH0410 |
RMC - 640364001 |
06/15/2022 |
11/15/2023 |
CRACK SEAL |
NATIONAL INDUSTRIAL MAINTENANCE, INC.($179,136) |
|
6406-38-001 |
BEXAR |
SAN ANTONIO |
$272,400 |
IH0035 |
MMC - 640638001 |
07/21/2022 |
11/15/2023 |
HOT-MIX COLD-LAID |
VULCAN CONSTRUCTION MATERIALS, LLC($281,834) |
|
6406-81-001 |
BEXAR |
SAN ANTONIO |
$50,000 |
US0281 |
RMC - 640681001 |
12/14/2022 |
11/15/2023 |
CULVERT REPAIR |
CROSS PLUS CONSTRUCTION, LLC($58,196) |
|
6428-50-001 |
BEXAR |
SAN ANTONIO |
$63,592 |
IH0010 |
MMC - 642850001 |
12/14/2022 |
11/15/2023 |
HOT-MIX COLD-LAID |
BRAUNTEX MATERIALS, INC.($65,700) |
|
6427-41-001 |
BEXAR |
SAN ANTONIO |
$284,798 |
IH0035 |
RMC - 642741001 |
01/18/2023 |
11/15/2023 |
TRAF SIGNAL MAINT |
E-Z BEL CONSTRUCTION, LLC($259,900) |
|
6445-70-001 |
BEXAR |
SAN ANTONIO |
$286,790 |
IH0010 |
RMC - 644570001 |
07/19/2023 |
11/15/2023 |
TRAF SIGNAL MAINT |
E-Z BEL CONSTRUCTION, LLC($332,180) |
|
6452-57-001 |
BEXAR |
SAN ANTONIO |
$181,800 |
IH0010 |
MMC - 645257001 |
09/13/2023 |
11/15/2023 |
WINTER WEATHER MATERIAL |
NSG LOGISTICS, LLC($179,050) |
|
2230-01-016 |
BEXAR |
SAN ANTONIO |
$1,544,303 |
FM 1560 |
STP 2017(477) |
01/05/2017 |
11/15/2023 |
REPLACE EXIST CULVERT WITH BRIDGE |
DAN WILLIAMS COMPANY($1,447,520) |
|
0253-04-146 |
BEXAR |
SAN ANTONIO |
$197,306,766 |
US 281 |
NH 2017(592) |
02/02/2017 |
11/15/2023 |
GR, STRS, BASE, SIGN, DELIN & PAVE MRKRS |
WEBBER, LLC($192,301,343) |
|
0072-12-197 |
BEXAR |
SAN ANTONIO |
$1,429,099 |
IH 10 |
NH 2017(560) |
02/02/2017 |
11/15/2023 |
OVERLAY & PAVMT MRK ON EB FRONTAGE ROAD |
LONE STAR PAVING COMPANY($1,177,188) |
|
0915-00-180 |
BEXAR |
SAN ANTONIO |
$1,456,113 |
VA |
STP 2017(565) |
02/03/2017 |
11/15/2023 |
DISTRICTWIDE TRAF CONTROL DEVICE |
E-Z BEL CONSTRUCTION, LLC($1,383,518) |
|
0073-08-184 |
BEXAR |
SAN ANTONIO |
$3,949,961 |
US 281 |
NH 2017(561) |
02/03/2017 |
11/15/2023 |
OVERLAY & PAVMT MRK ON NB & SB FRONTAGE RD |
AUSTIN MATERIALS, LLC($3,248,621) |
|
0915-00-194 |
BEXAR |
SAN ANTONIO |
$1,489,351 |
VA |
NH 2017(558) |
02/03/2017 |
11/15/2023 |
INSTL DMS |
THE LEVY COMPANY, L.P.($1,756,584) |
|
1477-01-040 |
BEXAR |
SAN ANTONIO |
$7,956,899 |
FM 1516 |
STP 2017(798)MM |
03/08/2017 |
11/15/2023 |
EXPAND 2 TO 4 LNS W/ LTL, SW, BK LN & EXTEND RDWY |
CAPITAL EXCAVATION COMPANY($7,388,906) |
|
0915-00-204 |
BEXAR |
SAN ANTONIO |
$1,458,810 |
VA |
STP 2017(894) |
04/04/2017 |
11/15/2023 |
DISTRICTWIDE TRAF CONTROL DEVICE |
D&G ENERGY CORPORATION($1,349,187) |
|
2230-01-018 |
BEXAR |
SAN ANTONIO |
$3,577,844 |
FM 1560 |
STP 2016(752)MM |
04/05/2017 |
11/15/2023 |
CONSTRUCT 2 LANE ROADWAY ON NEW LOCATION |
DAN WILLIAMS COMPANY($3,419,685) |
|
2452-01-064 |
BEXAR |
SAN ANTONIO |
$7,100,853 |
SL 1604 |
NH 1702(335) |
06/07/2017 |
11/15/2023 |
INTERS OPERATIONAL IMPRVS |
HARPER BROTHERS CONSTRUCTION LLC($8,000,083) |
|
0915-12-591 |
BEXAR |
SAN ANTONIO |
$527,386 |
VA |
NH 1702(678) |
08/08/2017 |
11/15/2023 |
LANDSCAPE DEVELOPEMENT |
ENCINO LANDSCAPE, INC.($510,193) |
|
0915-12-592 |
BEXAR |
SAN ANTONIO |
$646,384 |
VA |
NH 1702(679) |
08/09/2017 |
11/15/2023 |
LANDSCAPE DEVELOPEMENT |
ENCINO LANDSCAPE, INC.($682,419) |
|
0017-09-098 |
BEXAR |
SAN ANTONIO |
$309,379 |
IH 35 |
STP 2018(062)HESG |
09/07/2017 |
11/15/2023 |
INSTL WARN GUIDE SIGNS |
THE LEVY COMPANY, INC.($329,687) |
|
0017-10-267 |
BEXAR |
SAN ANTONIO |
$4,775,370 |
IH 35 |
NH 2018(065) |
09/07/2017 |
11/15/2023 |
STRUCT REPAIR/REPLACE BRG EXPANSION JOINTS |
J3 COMPANY, LLC($3,550,840) |
|
0915-00-181 |
BEXAR |
SAN ANTONIO |
$1,464,396 |
VA |
STP 2018(318) |
02/02/2018 |
11/15/2023 |
DISTRICTWIDE TRAF CONTROL DEVICE |
THE LEVY COMPANY, INC.($1,424,652) |
|
0521-05-145 |
BEXAR |
SAN ANTONIO |
$3,125,053 |
IH 410 |
NH 2018(533) |
02/02/2018 |
11/15/2023 |
OVERLAY & PAVMT MRK ON FRONTAGE ROAD |
ANGEL BROTHERS HOLDINGS CORP.($2,494,814) |
|
0017-10-267 |
BEXAR |
SAN ANTONIO |
$5,557,970 |
IH 35 |
NH 2018(065) |
04/03/2018 |
11/15/2023 |
STRUCT REPAIR/REPLACE BRG EXPANSION JOINTS |
CHAMPION INFRASTRUCTURE, LLC($4,831,650) |
|
0915-00-205 |
BEXAR |
SAN ANTONIO |
$1,509,945 |
VA |
STP 2018(682) |
04/03/2018 |
11/15/2023 |
DISTRICTWIDE NON-SITE SPECIFIC TRAF SIG |
D&G ENERGY CORPORATION($1,479,469) |
|
0915-12-577 |
BEXAR |
SAN ANTONIO |
$3,167,698 |
VA |
STP 2018(598)MM |
04/03/2018 |
11/15/2023 |
INSTL ITS DYNAMIC GUIDE SIGNS/DMS MESSAGE BOARDS |
THE LEVY COMPANY, INC.($2,897,981) |
|
0915-00-182 |
BEXAR |
SAN ANTONIO |
$1,959,291 |
VA |
STP 2018(733) |
04/04/2018 |
11/15/2023 |
DISTRICTWIDE GUIDESIGNS FY18 |
THE LEVY COMPANY, INC.($1,921,529) |
|
0025-02-160 |
BEXAR |
SAN ANTONIO |
$126,653,961 |
IH 10 |
C 25-2-160 |
05/01/2018 |
11/15/2023 |
EXPAND FROM 4 TO 6 LANE EXPRESSWAY |
WEBBER, LLC($119,776,274) |
|
0017-10-280 |
BEXAR |
SAN ANTONIO |
$5,046,511 |
IH 35 |
STP 2018(860)MM |
05/01/2018 |
11/15/2023 |
CONSTRUCT SIDEWALKS ALONG FRONTAGE ROADS |
J3 COMPANY, LLC($4,561,841) |
|
0072-12-198 |
BEXAR |
SAN ANTONIO |
$1,453,745 |
IH 10 |
NH 2018(862) |
05/01/2018 |
11/15/2023 |
INTERS AND OPERATIONAL IMPRVS |
DAN WILLIAMS COMPANY($1,598,613) |
|
0915-00-179 |
BEXAR |
SAN ANTONIO |
$1,496,265 |
VA |
STP 2018(866) |
05/02/2018 |
11/15/2023 |
CONSTRUCT CURB RAMPS |
F. D. CONCRETE, LLC($1,236,777) |
|
0521-06-144 |
BEXAR |
SAN ANTONIO |
$1,424,747 |
IH 410 |
C 521-6-144 |
05/02/2018 |
11/15/2023 |
HIGH MAST AND CONTINUOUS ILLUM |
MICA CORPORATION($1,310,013) |
|
0073-08-193 |
BEXAR |
SAN ANTONIO |
$98,054 |
IH 37 |
NH 1802(204) |
06/05/2018 |
11/15/2023 |
LANDSCAPE PLANTING AND IRRIGATION |
YELLOWSTONE LANDSCAPE - CENTRAL, INC.($107,738) |
|
2452-02-119 |
BEXAR |
SAN ANTONIO |
$7,205,067 |
SL 1604 |
NH 2018(870) |
06/05/2018 |
11/15/2023 |
INTERS OP IMPROV - CONST 4 TURNAROUNDS |
CAPITAL EXCAVATION COMPANY($6,253,995) |
|
2452-03-118 |
BEXAR |
SAN ANTONIO |
$15,286,855 |
SL 1604 |
STP 2018(871) |
06/05/2018 |
11/15/2023 |
RECONFIG RAMPS, CONSTR TA AT BULVERDE RD & OP IMPR |
CURRAN CONTRACTING COMPANY($10,847,613) |
|
1479-01-024 |
BEXAR |
SAN ANTONIO |
$38,335,030 |
SL 1604 |
STP 2018(972) |
06/06/2018 |
11/15/2023 |
EXPAND FROM 2 LANES TO 4 LANES DIVIDED |
HARPER BROTHERS CONSTRUCTION LLC($40,398,632) |
|
2452-02-118 |
BEXAR |
SAN ANTONIO |
$804,649 |
SL 1604 |
NH 2018(868) |
06/06/2018 |
11/15/2023 |
INTERSEC OPERATION IMPROVE-EB TO WB TURNAROUND |
CAPITAL EXCAVATION COMPANY($806,297) |
|
0253-04-138 |
BEXAR |
SAN ANTONIO |
$187,123,687 |
US 281 |
NH 1802(390) |
07/10/2018 |
11/15/2023 |
EXPAND TO 6 LN EXPWY WITH FR RD 4 GEN - 2 HOV |
ZACHRY CONSTRUCTION CORPORATION($178,383,492) |
|
0072-07-070 |
BEXAR |
SAN ANTONIO |
$36,185,518 |
IH 10 |
NH 1802(387) |
07/10/2018 |
11/15/2023 |
GRAD, BASE, STRUCT, PAVMT MRK |
J3 COMPANY, LLC($37,255,989) |
|
0025-02-216 |
BEXAR |
SAN ANTONIO |
$6,315,723 |
IH 10 |
C 25-2-216 |
07/10/2018 |
11/15/2023 |
UPGRADE ILLUM |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.($6,167,909) |
|
0915-00-206 |
BEXAR |
SAN ANTONIO |
$428,253 |
VA |
STP 2018(899) |
07/11/2018 |
11/15/2023 |
DISTRICTWIDE NON-SITE SPECIFIC TRAF SIG-FY2018 |
THE LEVY COMPANY, INC.($391,447) |
|
2230-01-013 |
BEXAR |
SAN ANTONIO |
$16,562,969 |
FM 1560 |
STP 1802(618) |
08/08/2018 |
11/15/2023 |
GRAD, STR, BASE, SURF |
DAN WILLIAMS COMPANY($17,810,211) |
|
0025-02-217 |
BEXAR |
SAN ANTONIO |
$2,058,727 |
IH 10 |
BR 2019(035) |
09/06/2018 |
11/15/2023 |
PAINT & REPAIR BRG, SURF, PAV'T MRK |
RELMCO, INC.($1,479,046) |
|
0143-01-055 |
BEXAR |
SAN ANTONIO |
$3,422,190 |
US 87 |
NH 2019(036) |
09/07/2018 |
11/15/2023 |
RESTORE EXIST ROADWAY |
JORDAN FOSTER CONSTRUCTION, LLC($3,451,000) |
|
0073-08-195 |
BEXAR |
SAN ANTONIO |
$2,770,759 |
IH 37 |
NH 2019(109) |
10/02/2018 |
11/15/2023 |
REPAIR SLOPE FAILURE |
RELMCO, INC.($2,967,147) |
|
1890-01-046 |
BEXAR |
SAN ANTONIO |
$18,393,325 |
FM 1976 |
STP 2019(111) |
10/03/2018 |
11/15/2023 |
REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERS |
CURRAN CONTRACTING COMPANY($16,483,393) |
|
0915-00-207 |
BEXAR |
SAN ANTONIO |
$435,354 |
VA |
STP 2019(169) |
11/06/2018 |
11/15/2023 |
SIDEWALK, SIGNAL, SIGN, PAV'T MRKNG |
E-Z BEL CONSTRUCTION, LLC($533,808) |
|
0073-02-071 |
BEXAR |
SAN ANTONIO |
$2,059,166 |
US 281 |
NH 2019(273) |
12/05/2018 |
11/15/2023 |
INTERS OPERATIONAL IMPRVS |
ALL IN CONSTRUCTION, L.L.C.($1,936,000) |
|
2452-04-016 |
BEXAR |
SAN ANTONIO |
$23,174,045 |
SL 1604 |
STP 2019(510) |
02/05/2019 |
11/15/2023 |
EXPAND FROM 2 LANES TO 4 LANE DIVIDED |
MARIO SINACOLA & SONS EXCAVATING, INC.($20,172,902) |
|
0465-02-026 |
BEXAR |
SAN ANTONIO |
$2,621,772 |
FM 1518 |
C 465-2-26 |
02/05/2019 |
11/15/2023 |
SURF & PAVMT MRK |
ANGEL BROTHERS HOLDINGS CORP.($2,220,997) |
|
0024-09-024 |
BEXAR |
SAN ANTONIO |
$6,016,898 |
SS 371 |
C 24-9-24 |
02/05/2019 |
11/15/2023 |
SURF & PAVMT MRK |
ANGEL BROTHERS HOLDINGS CORP.($6,242,921) |
|
0291-10-110 |
BEXAR |
SAN ANTONIO |
$2,116,136 |
SH 16 |
NH 2019(511) |
02/06/2019 |
11/15/2023 |
RECON EXIST CULVERT |
DAN WILLIAMS COMPANY($2,107,962) |
|
0915-00-192 |
BEXAR |
SAN ANTONIO |
$1,065,217 |
VA |
STP 2019(777) |
04/02/2019 |
11/15/2023 |
SIG,SIGNS,PAV'T MRKS |
E-Z BEL CONSTRUCTION, LLC($817,876) |
|
0915-00-209 |
BEXAR |
SAN ANTONIO |
$1,628,273 |
VA |
STP 2019(902) |
05/07/2019 |
11/15/2023 |
INTERS OPERATIONAL IMPRVS-NORTH |
CURRAN CONTRACTING COMPANY($1,371,713) |
|
0915-00-210 |
BEXAR |
SAN ANTONIO |
$2,550,498 |
VA |
STP 2019(903) |
05/08/2019 |
11/15/2023 |
INTERS OPERATIONAL IMPRVS |
RELMCO, INC.($2,758,844) |
|
0915-12-566 |
BEXAR |
SAN ANTONIO |
$2,005,524 |
CS |
STP 2019(899)HES |
05/08/2019 |
11/15/2023 |
SIG & ILLUM, ETC. |
E-Z BEL CONSTRUCTION, LLC($1,774,683) |
|
0915-00-222 |
BEXAR |
SAN ANTONIO |
$1,499,137 |
VA |
STP 2019(904) |
05/08/2019 |
11/15/2023 |
DISTRICTWIDE PAVMT MRK - FY 2019 |
TRP CONSTRUCTION GROUP, LLC($1,519,049) |
|
6350-95-001 |
BEXAR |
SAN ANTONIO |
$398,350 |
IH0035 |
RMC - 635095001 |
03/04/2020 |
11/15/2023 |
INSTL OSB |
MICA CORPORATION($659,594) |
|
0915-00-211 |
BEXAR |
SAN ANTONIO |
$466,337 |
VA |
STP 2019(796)MM |
06/05/2019 |
11/15/2023 |
SIGNAL UPGRADES |
THE LEVY COMPANY, INC.($409,939) |
|
0915-00-226 |
BEXAR |
SAN ANTONIO |
$278,088 |
3045 015 |
NH 1902(352) |
08/06/2019 |
11/15/2023 |
WILDFLOWER PLANTING DISTRICTWIDE |
K-BAR SERVICES, INC.($238,000) |
|
0025-02-223 |
BEXAR |
SAN ANTONIO |
$1,218,003 |
IH 10 |
STP 1902(318) |
08/07/2019 |
11/15/2023 |
LANDSCAPE & SCENIC ENHAN |
TIGHT LINE CONSTRUCTION, LLC($1,049,982) |
|
0017-03-066 |
BEXAR |
SAN ANTONIO |
$372,428 |
IH 35 |
NH 2020(401) |
12/04/2019 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
TIGHT LINE CONSTRUCTION, LLC($319,940) |
|
0915-00-198 |
BEXAR |
SAN ANTONIO |
$1,489,765 |
VA |
STP 2020(558) |
02/06/2020 |
11/15/2023 |
DISTRICTWIDE NON-SITE SPECIFIC TRAF SIG-FY |
THE LEVY COMPANY, INC.($1,588,565) |
|
0658-01-044 |
BEXAR |
SAN ANTONIO |
$5,732,853 |
FM 1535 |
STP 2020(557)MM |
02/07/2020 |
11/15/2023 |
EXPAND 2 TO 4 LN WITH MEDIAN, TURN LN, BIKE LN, SW |
J3 COMPANY, LLC($5,683,754) |
|
0024-08-135 |
BEXAR |
SAN ANTONIO |
$5,061,247 |
US 90 |
NH 2020(676) |
03/05/2020 |
11/15/2023 |
BASE REPAIR, MILL, INLAY & PV MRKS ON FRONTAGE RDS |
ANGEL BROTHERS HOLDINGS CORP.($4,775,401) |
|
0915-00-230 |
BEXAR |
SAN ANTONIO |
$3,159,866 |
VA |
C 915-00-230 |
05/07/2020 |
11/15/2023 |
INTERS OPERATIONAL IMPRVS |
ACME BRIDGE COMPANY, INC.($3,053,201) |
|
7774-01-001 |
BEXAR |
SAN ANTONIO |
$7,468,133 |
PA 1502 |
STP 2020(789)MM |
05/08/2020 |
11/15/2023 |
EXPAND 4 TO 6 LNS DIVIDED & INTERSECT OPERATIONS |
AUSTIN BRIDGE & ROAD SERVICES, LP($7,947,752) |
|
0915-12-689 |
BEXAR |
SAN ANTONIO |
$6,638,102 |
VA |
STP 2020(899) |
06/04/2020 |
11/15/2023 |
CONST CURB RAMPS, SIDEWALKS, PED FY 20 PROJ2 |
J3 COMPANY, LLC($5,943,162) |
|
0025-02-215 |
BEXAR |
SAN ANTONIO |
$158,203,252 |
IH 10 |
C 25-2-215 |
07/09/2020 |
11/15/2023 |
EXPAND 4 TO 6 LN EXPRESSWAY & FROM 4 TO 4 LN FR |
ZACHRY CONSTRUCTION CORPORATION($149,200,124) |
|
0915-12-657 |
BEXAR |
SAN ANTONIO |
$3,840,003 |
CR |
STP 2B20(065)HES |
08/05/2020 |
11/15/2023 |
CONSTRUCT INTERCHANGE |
DAN WILLIAMS COMPANY($4,289,597) |
|
6359-15-001 |
BEXAR |
SAN ANTONIO |
$2,895,554 |
IH0035 |
RMC - 635915001 |
04/08/2020 |
11/15/2023 |
PAV MRK & MRKRS CENTERLINE TEXTURE |
TRP CONSTRUCTION GROUP, LLC($2,792,098) |
|
0915-00-199 |
BEXAR |
SAN ANTONIO |
$291,350 |
VA |
STP 1809(759) |
12/03/2020 |
11/15/2023 |
TRAF SIGNAL COMMUNICATION UPGRADES |
THE LEVY COMPANY, INC.($282,661) |
|
0658-01-045 |
BEXAR |
SAN ANTONIO |
$13,370,908 |
FM 1535 |
STP 2021(227)MM |
01/07/2021 |
11/15/2023 |
CONSTRUCT 2 WAY LT TURN LN, BIKE LNS & SDWKS |
DAN WILLIAMS COMPANY($15,523,367) |