6349-43-001 |
BELL |
WACO |
$150,982 |
IH0035 |
RMC - 634943001 |
11/06/2019 |
11/15/2023 |
LIFT STATION REPL |
AAD CONTRACTING INC.($699,999) |
|
6469-37-001 |
BELL |
WACO |
$183,480 |
FM1670 |
RMC - 646937001 |
07/23/2024 |
06/07/2024 |
TREE TRIM AND BRUSH RMVL |
ALLIES LAND CLEARING($148,202) |
|
6314-14-001 |
BELL |
WACO |
$367,270 |
US0190 |
RMC - 631414001 |
06/07/2017 |
11/15/2023 |
DISTRICT WIDE MAINT OF SIGNAL SYS |
AMERICAN LIGHTING AND SIGNALIZATION, INC.($371,099) |
|
6381-55-001 |
BELL |
WACO |
$362,195 |
SH0317 |
RMC - 638155001 |
06/03/2021 |
11/15/2023 |
ILLUM MAINT |
AMERICAN LIGHTING AND SIGNALIZATION, LLC($329,682) |
|
6341-68-001 |
BELL |
WACO |
$1,198,299 |
US0190 |
RMC - 634168001 |
08/07/2019 |
11/15/2023 |
BASE FAILURE PAYMENT REPAIR |
AUSTIN MATERIALS, LLC($1,314,219) |
|
6356-91-001 |
BELL |
WACO |
$2,421,390 |
US0190 |
MMC - 635691001 |
04/09/2020 |
11/15/2023 |
HOT MIX - MATERIAL ONLY |
AUSTIN MATERIALS, LLC($2,275,500) |
|
0231-07-009 |
BELL |
WACO |
$648,035 |
SS 172 |
STP 2023(975)HES |
06/27/2023 |
11/15/2023 |
INSTL ILLUM |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($625,499) |
|
6375-32-001 |
BELL |
WACO |
$363,836 |
US0190 |
RMC - 637532001 |
02/04/2021 |
11/15/2023 |
TRAF SIGNAL MAINT |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($429,668) |
|
0909-36-182 |
BELL |
WACO |
$335,014 |
CS |
STP 2023(049)HESG |
10/07/2022 |
11/15/2023 |
INSTL TRAF SIGNAL, SAFETY LIGHTING |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($461,859) |
|
6326-48-001 |
BELL |
WACO |
$334,475 |
US0190 |
RMC - 632648001 |
03/05/2019 |
11/15/2023 |
D/W MAINTENCE OF SIGNAL SYS |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($381,915) |
|
0015-05-050 |
BELL |
WACO |
$424,477 |
SH 317 |
STP 2019(837)HES |
05/07/2019 |
11/15/2023 |
IMPROVE TRAF SIG |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($521,881) |
|
0836-02-075 |
BELL |
WACO |
$317,716 |
SH 195 |
STP 2019(406)HES |
01/09/2019 |
11/15/2023 |
INSTLL SGNLS AND SGNS |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.($288,045) |
|
6444-34-001 |
BELL |
WACO |
$119,708 |
FM0817 |
RMC - 644434001 |
06/27/2023 |
11/15/2023 |
TREE TRIM |
BA NEWTON'S ENTERPRISES LLC($79,870) |
|
6338-73-001 |
BELL |
WACO |
$1,284,325 |
SH0317 |
RMC - 633873001 |
11/07/2018 |
11/15/2023 |
DISTRICT WIDE PAVMT MRK |
BATTERSON, LLP($1,169,617) |
|
0231-03-160 |
BELL |
WACO |
$1,995,966 |
IH 14 |
F 2B24(459) |
08/01/2024 |
06/20/2024 |
REPLACE MAINLANE STRIPING |
BATTERSON, LLP($1,467,609) |
|
0231-04-056 |
BELL |
WACO |
$1,064,589 |
US 190 |
STP 2018(251)HES |
11/03/2017 |
11/15/2023 |
SAFETY TREAT FIXED OBJECTS |
BEAR CREEK CONTRACTING, LLC($1,063,872) |
|
6319-40-001 |
BELL |
WACO |
$146,795 |
FM0817 |
RMC - 631940001 |
07/18/2017 |
11/15/2023 |
TREE TRIMMIMG AND TREE RMVL |
BEAVER BOYS SERVICES LLC($136,909) |
|
6414-05-001 |
BELL |
WACO |
$1,850,475 |
SH0317 |
RMC - 641405001 |
09/08/2022 |
11/15/2023 |
MISCELLANEOUS CONC REPAIR |
BECK-REIT & SONS, LTD.($1,608,702) |
|
6346-23-001 |
BELL |
WACO |
$758,697 |
FM2086 |
BPM - 634623001 |
12/04/2019 |
11/15/2023 |
BRIDGE PREVENT MAINT |
BECK-REIT & SONS, LTD.($943,122) |
|
0320-02-036 |
BELL |
WACO |
$7,449,956 |
SH 95 |
STP 2017(900) |
10/03/2017 |
11/15/2023 |
WDN, GR, SURF, ADD PASS LNS |
BIG CREEK CONSTRUCTION, LTD.($6,123,478) |
|
0231-03-143 |
BELL |
WACO |
$7,986,415 |
US 190 |
NH 2018(347) |
12/06/2017 |
11/15/2023 |
WDN, BS, STR, SURF |
BIG CREEK CONSTRUCTION, LTD.($7,287,694) |
|
6425-60-001 |
BELL |
WACO |
$842,500 |
SH0095 |
MMC - 642560001 |
12/01/2022 |
11/15/2023 |
HOT MIX |
BIG CREEK CONSTRUCTION, LTD.($779,000) |
|
0398-04-059 |
BELL |
WACO |
$16,930,873 |
SH 317 |
C 398-4-59 |
05/03/2016 |
11/15/2023 |
RECON & WIDEN TO 4 LANES W/RAISED MEDIAN |
BIG CREEK CONSTRUCTION, LTD.($16,887,377) |
|
0320-05-015 |
BELL |
WACO |
$3,072,993 |
SL 363 |
C 320-5-15 |
07/11/2018 |
11/15/2023 |
MILL/SEAL/OVLY |
BIG CREEK CONSTRUCTION, LTD.($2,938,131) |
|
6431-30-001 |
BELL |
WACO |
$822,500 |
US0190 |
MMC - 643130001 |
02/02/2023 |
11/15/2023 |
HOT MIX |
BIG CREEK CONSTRUCTION, LTD.($820,000) |
|
1835-02-054 |
BELL |
WACO |
$1,039,695 |
FM 1741 |
STP 1702(304) |
06/07/2017 |
11/15/2023 |
MILL/INLAY |
BIG CREEK CONSTRUCTION, LTD.($897,190) |
|
6443-84-001 |
BELL |
WACO |
$1,510,250 |
US0190 |
MMC - 644384001 |
02/01/2024 |
12/21/2023 |
HOT MIX |
BIG CREEK CONSTRUCTION, LTD.($1,467,750) |
|
6330-19-001 |
BELL |
WACO |
$384,329 |
US0190 |
RMC - 633019001 |
07/11/2018 |
11/15/2023 |
RAISED PAVMT MARKER MAINT |
BRYDL CONTRACTING, INC.($298,470) |
|
6359-41-001 |
BELL |
WACO |
$520,944 |
US0190 |
RMC - 635941001 |
04/09/2020 |
11/15/2023 |
RAISED PAVMT MARKER MAINT |
BRYDL CONTRACTING, INC.($318,759) |
|
6303-05-001 |
BELL |
WACO |
$229,108 |
US0190 |
RMC - 630305001 |
11/15/2016 |
11/15/2023 |
RAISED PAVMT MARKERS - DISTRICTWIDE |
BRYDL CONTRACTING, INC.($191,536) |
|
6396-65-001 |
BELL |
WACO |
$478,852 |
SH0317 |
RMC - 639665001 |
03/03/2022 |
11/15/2023 |
RAISED PAVMT MARKERS |
BRYDL CONTRACTING, LLC($383,594) |
|
6408-32-001 |
BELL |
WACO |
$612,894 |
SL0363 |
RMC - 640832001 |
01/05/2023 |
11/15/2023 |
BRIDGE PREVENT MAINT |
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC($578,275) |
|
2136-01-015 |
BELL |
WACO |
$4,194,503 |
FM 2268 |
BR 2019(313) |
02/06/2019 |
11/15/2023 |
REPL BR & APPRS |
CAPITAL EXCAVATION COMPANY($5,238,854) |
|
0231-03-146 |
BELL |
WACO |
$4,323,326 |
US 190 |
NH 1802(211) |
06/05/2018 |
11/15/2023 |
RDWY RECONFIG |
CAPITAL EXCAVATION COMPANY($4,549,398) |
|
1308-01-025 |
BELL |
WACO |
$6,260,469 |
FM 1123 |
BR 2024(990) |
05/02/2024 |
03/21/2024 |
REPLACE BRIDGE AND APPROACHES |
C. E. BARKER, LTD.($5,183,802) |
|
2304-03-012 |
BELL |
WACO |
$613,049 |
FM 2484 |
STP 2017(600)HES |
02/03/2017 |
11/15/2023 |
MILLED CL RUMBLE STRIP |
CHAMPION INFRASTRUCTURE, LLC($824,245) |
|
6326-86-001 |
BELL |
WACO |
$144,419 |
US0190 |
RMC - 632686001 |
02/13/2018 |
11/15/2023 |
BRIDGE AND CULVERT REPAIRS |
CROSS PLUS CONSTRUCTION, LLC($162,978) |
|
6435-02-001 |
BELL |
WACO |
$38,599,454 |
IH0035 |
RMC - 643502001 |
06/01/2023 |
11/28/2023 |
TOTAL MAINT |
CROSS PLUS CONSTRUCTION, LLC($39,982,738) |
|
6389-07-001 |
BELL |
WACO |
$516,750 |
SH0095 |
RMC - 638907001 |
12/02/2021 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
CROSS PLUS CONSTRUCTION, LLC($600,101) |
|
0909-36-181 |
BELL |
WACO |
$463,329 |
CS |
STP 2023(048)HES |
10/06/2022 |
11/15/2023 |
INSTL PEDESTRIAN CROSSWALK, INSTL SIDEWALKS |
CROSS PLUS CONSTRUCTION, LLC($451,322) |
|
0909-36-189 |
BELL |
WACO |
$74,607 |
CS |
STP 2023(464)HESG |
02/01/2023 |
11/15/2023 |
INSTL/REPLACE SIGNS |
CROSS PLUS CONSTRUCTION, LLC($81,987) |
|
6326-50-001 |
BELL |
WACO |
$304,700 |
US0190 |
RMC - 632650001 |
05/08/2019 |
11/15/2023 |
LARGE SIGN MAINT |
CROSS PLUS CONSTRUCTION, LLC($285,750) |
|
6352-99-001 |
BELL |
WACO |
$476,907 |
US0190 |
RMC - 635299001 |
12/04/2019 |
11/15/2023 |
URBAN AND RURAL MOW |
CROSS PLUS CONSTRUCTION, LLC($552,738) |
|
6473-12-001 |
BELL |
WACO |
$663,698 |
US0190 |
RMC - 647312001 |
11/13/2024 |
10/03/2024 |
MOW HWY RIGHT OF WAY |
CROSS PLUS CONSTRUCTION, LLC($567,082) |
|
6420-85-001 |
BELL |
WACO |
$586,989 |
SH0317 |
RMC - 642085001 |
12/01/2022 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
CROSS PLUS CONSTRUCTION, LLC($690,969) |
|
6364-95-001 |
BELL |
WACO |
$336,742 |
US0190 |
RMC - 636495001 |
10/02/2020 |
11/15/2023 |
LARGE SIGN MAINT-DISTRICTWIDE |
CROSS PLUS CONSTRUCTION, LLC($274,900) |
|
0320-01-078 |
BELL |
WACO |
$384,701 |
SS 290 |
STP 2022(891)HES |
08/03/2022 |
11/15/2023 |
INSTL PEDESTRIAN CROSSWALK, INSTL SIDEWALKS |
CROSS PLUS CONSTRUCTION, LLC($384,376) |
|
6352-37-001 |
BELL |
WACO |
$29,782 |
SH0317 |
RMC - 635237001 |
01/21/2020 |
11/15/2023 |
NON SITE SPEC MEAS OF RETROREFLECTIVITY |
D. I. J. CONSTRUCTION, INC.($27,462) |
|
6470-41-001 |
BELL |
WACO |
$1,145,632 |
FM0438 |
RMC - 647041001 |
08/02/2024 |
06/26/2024 |
CRACK SEAL |
D & M CONTRACTORS, LLC($1,167,326) |
|
6388-98-001 |
BELL |
WACO |
$932,828 |
SH0317 |
RMC - 638898001 |
11/04/2021 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR |
ELITE CASTLE RESOURCES LLC($776,042) |
|
6354-18-001 |
BELL |
WACO |
$550,598 |
US0190 |
RMC - 635418001 |
02/06/2020 |
11/15/2023 |
CLEANING AND SWEEPING |
EXPERT MAINTENANCE & CONSTRUCTION SERVICES LLC($411,184) |
|
6331-03-001 |
BELL |
WACO |
$470,077 |
US0190 |
RMC - 633103001 |
07/10/2018 |
11/15/2023 |
CLEANING AND SWEEPING HWYS |
EXPERT MAINTENANCE & CONSTRUCTION SERVICES LLC($439,828) |
|
6303-06-001 |
BELL |
WACO |
$3,657,602 |
FM2184 |
RMC - 630306001 |
11/03/2016 |
11/15/2023 |
SEAL COAT (DISTRICTWIDE) |
F. N. PLOCH CONSTRUCTION COMPANY, INC.($2,877,967) |
|
6381-60-001 |
BELL |
WACO |
$114,345 |
FM0817 |
RMC - 638160001 |
07/29/2021 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
FOWLER CONSTRUCTION($99,989) |
|
6319-13-001 |
BELL |
WACO |
$160,825 |
FM0438 |
RMC - 631913001 |
08/15/2017 |
11/15/2023 |
CRACK SEAL - COLD APPLICATION |
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY($139,695) |
|
6401-02-001 |
BELL |
WACO |
$80,707 |
FM0436 |
RMC - 640102001 |
06/28/2022 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL |
GV LANDSCAPE AND CONSTRUCTION LLC($89,675) |
|
6320-89-001 |
BELL |
WACO |
$327,300 |
US0190 |
RMC - 632089001 |
10/03/2017 |
11/15/2023 |
LARGE SIGN MAINT |
IIPL USA LLC($336,750) |
|
0015-05-049 |
BELL |
WACO |
$1,409,036 |
FM 817 |
BR 2017(899) |
11/03/2017 |
11/15/2023 |
TRUSS CLEANING AND PAINTING |
JAMES CONSTRUCTION GROUP, L.L.C.($1,599,938) |
|
0231-04-060 |
BELL |
WACO |
$40,212,907 |
IH 14 |
C 231-4-60 |
06/04/2020 |
11/15/2023 |
WIDEN FROM FOUR TO SIX LANES AND RESURF |
JAMES CONSTRUCTION GROUP, L.L.C.($39,466,124) |
|
0320-06-008 |
BELL |
WACO |
$65,858,239 |
SL 363 |
F 2024(849) |
02/02/2024 |
12/22/2023 |
CONSTRUCT NEW ROAD |
JAMES CONSTRUCTION GROUP, LLC($53,775,775) |
|
0185-05-003 |
BELL |
WACO |
$4,361,714 |
US 190 |
STP 2023(717)HES |
05/04/2023 |
11/15/2023 |
INSTL MEDIAN BARRIER |
JAMES CONSTRUCTION GROUP, LLC($4,600,000) |
|
0320-02-039 |
BELL |
WACO |
$10,936,141 |
SH 95 |
BR 2023(463) |
02/02/2023 |
11/15/2023 |
BRIDGE REPL |
JAMES CONSTRUCTION GROUP, LLC($11,989,344) |
|
0836-02-077 |
BELL |
WACO |
$6,205,434 |
SH 195 |
STP 2024(988)HES |
05/03/2024 |
03/22/2024 |
HAZARD ELIM & SAFETY |
JAMES CONSTRUCTION GROUP, LLC($5,775,775) |
|
2502-01-021 |
BELL |
WACO |
$29,978,534 |
SL 121 |
F 2021(093) |
08/05/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
JAMES CONSTRUCTION GROUP, LLC($29,180,209) |
|
0231-03-145 |
BELL |
WACO |
$42,581,073 |
US 190 |
NH 2019(651) |
06/04/2019 |
11/15/2023 |
WDN, BS, STR, SURF |
J.D. ABRAMS, L.P.($44,733,666) |
|
0231-03-147 |
BELL |
WACO |
$3,095,819 |
IH 14 |
STP 2020(941)MM |
07/09/2020 |
11/15/2023 |
CONSTRUCT WEST TO EAST TURNAROUND @ FM 2410 |
J.D. ABRAMS, L.P.($3,098,000) |
|
0185-01-030 |
BELL |
WACO |
$79,955,513 |
US 190 |
NH 2019(599) |
11/06/2019 |
11/15/2023 |
WIDEN FROM TWO TO FOUR LANE DIVIDED HWY |
J.D. ABRAMS, L.P.($77,807,569) |
|
1308-01-024 |
BELL |
WACO |
$3,317,844 |
FM 1123 |
BR 1602(576) |
04/05/2017 |
11/15/2023 |
REPLACE BRIDGE & APPROACHES |
J.D. ABRAMS, L.P.($2,950,399) |
|
6457-05-001 |
BELL |
WACO |
$450,500 |
US0190 |
MMC - 645705001 |
12/05/2023 |
11/15/2023 |
HOT-MIX COLD-LAID |
KNIFE RIVER CORPORATION - SOUTH($539,275) |
|
6356-83-001 |
BELL |
WACO |
$751,420 |
US0190 |
MMC - 635683001 |
04/09/2020 |
11/15/2023 |
COLD MIX - MATERAL ONLY |
KNIFE RIVER CORPORATION - SOUTH($631,470) |
|
6387-67-001 |
BELL |
WACO |
$320,000 |
US0190 |
MMC - 638767001 |
09/02/2021 |
11/15/2023 |
HOT-MIX COLD-LAID |
KNIFE RIVER CORPORATION - SOUTH($323,000) |
|
6473-54-001 |
BELL |
WACO |
$620,750 |
US0190 |
MMC - 647354001 |
11/13/2024 |
10/16/2024 |
HOT-MIX COLD-LAID |
LONE STAR PAVING COMPANY($651,375) |
|
6398-54-001 |
BELL |
WACO |
$296,300 |
US0190 |
MMC - 639854001 |
03/15/2022 |
11/15/2023 |
HOT MIX |
LONE STAR PAVING COMPANY($328,375) |
|
2304-02-042 |
BELL |
WACO |
$884,323 |
FM 2410 |
STP 2018(348) |
12/05/2017 |
11/15/2023 |
SEAL/LVL UP/OVLY |
LONE STAR PAVING COMPANY($795,656) |
|
0184-04-050 |
BELL |
WACO |
$2,831,808 |
SH 36 |
C 184-4-50 |
07/10/2018 |
11/15/2023 |
MISC SPOT PAVMT REPAIRS |
LONE STAR PAVING COMPANY($2,282,822) |
|
0184-03-038 |
BELL |
WACO |
$1,194,128 |
SH 53 |
C 184-3-38 |
01/09/2019 |
11/15/2023 |
MILL/OVLY |
LONE STAR PAVING COMPANY($1,032,768) |
|
1835-02-056 |
BELL |
WACO |
$2,996,784 |
FM 1741 |
STP 1902(272) |
08/07/2019 |
11/15/2023 |
MILL/OVLY |
LONE STAR PAVING COMPANY($3,284,016) |
|
3534-01-012 |
BELL |
WACO |
$2,433,699 |
SH 201 |
F 2022(434) |
04/06/2022 |
09/24/2024 |
MILL AND INLAY |
LONE STAR PAVING COMPANY($1,874,463) |
|
6418-47-001 |
BELL |
WACO |
$425,000 |
US0190 |
MMC - 641847001 |
12/02/2022 |
11/15/2023 |
HOT-MIX COLD-LAID |
LONE STAR PAVING COMPANY($420,000) |
|
0836-02-071 |
BELL |
WACO |
$969,052 |
SH 195 |
NH 2018(411) |
03/07/2018 |
11/15/2023 |
MILL/OVLY |
LONE STAR PAVING COMPANY($796,526) |
|
2057-01-010 |
BELL |
WACO |
$1,460,915 |
FS 439 |
C 2057-1-10 |
06/05/2024 |
04/24/2024 |
SURF/ROADWAY RESTOR |
LONE STAR PAVING COMPANY($1,357,784) |
|
0909-36-190 |
BELL |
WACO |
$238,227 |
CS |
STP 2024(119)HES |
10/06/2023 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
MHB CONSTRUCTION, INC.($236,667) |
|
0231-03-152 |
BELL |
WACO |
$5,548,675 |
IH 14 |
NH 2021(228) |
01/07/2021 |
11/15/2023 |
ADVANCED TRAF MGT SYSTEM CONNECTION |
MICA CORPORATION($4,573,813) |
|
6467-55-001 |
BELL |
WACO |
$537,675 |
US0190 |
MMC - 646755001 |
08/02/2024 |
06/26/2024 |
DE-ICING SALT |
NSG LOGISTICS, LLC($529,033) |
|
6446-38-001 |
BELL |
WACO |
$757,494 |
US0190 |
MMC - 644638001 |
08/02/2023 |
11/15/2023 |
DE-ICING SALT |
NSG LOGISTICS, LLC($793,341) |
|
3534-01-011 |
BELL |
WACO |
$3,468,716 |
FM 3470 |
STP 2017(398) |
12/01/2016 |
11/15/2023 |
MILL/SEAL/INLY |
OLDCASTLE MATERIALS TEXAS, INC.($3,489,226) |
|
0232-05-016 |
BELL |
WACO |
$839,513 |
FM 2305 |
C 232-5-16 |
05/02/2018 |
11/15/2023 |
SEAL/OVLY |
OLDCASTLE MATERIALS TEXAS, INC.($888,222) |
|
6315-78-001 |
BELL |
WACO |
$1,249,812 |
US0190 |
RMC - 631578001 |
06/06/2017 |
11/15/2023 |
BASE FAILURE PAVMT REPAIR |
OLDCASTLE MATERIALS TEXAS, INC.($940,401) |
|
6355-19-001 |
BELL |
WACO |
$1,538,048 |
SH0317 |
RMC - 635519001 |
03/04/2020 |
11/15/2023 |
DISTRICT WIDE PAVMT MRK |
PAVEMENT MARKINGS INC.($1,529,355) |
|
6381-22-001 |
BELL |
WACO |
$3,698,182 |
SH0317 |
RMC - 638122001 |
10/07/2021 |
11/15/2023 |
PAVMT MRK |
PAVEMENT MARKINGS INC.($3,150,885) |
|
6398-50-001 |
BELL |
WACO |
$3,366,151 |
SH0317 |
RMC - 639850001 |
09/08/2022 |
11/15/2023 |
PAVMT MRK |
PAVEMENT MARKINGS INC.($4,082,624) |
|
6364-94-001 |
BELL |
WACO |
$1,576,031 |
SH0317 |
RMC - 636494001 |
12/02/2020 |
11/15/2023 |
DISTRICT WIDE PAVMT MRK |
PAVEMENT MARKINGS INC.($1,435,500) |
|
0231-16-035 |
BELL |
WACO |
$1,891,533 |
FM 436 |
STP 2022(890)HES |
08/03/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
PIERCE R & B LLC($2,084,782) |
|
6459-07-001 |
BELL |
WACO |
$466,017 |
SL0363 |
RMC - 645907001 |
01/04/2024 |
11/22/2023 |
CLEANING AND SWEEPING HWYS |
PROFESSIONAL TRAFFIC CONTROL LLC($316,346) |
|
0184-04-053 |
BELL |
WACO |
$487,589 |
SH 36 |
STP 2022(479)HES |
05/05/2022 |
08/31/2024 |
HAZARD ELIM & SAFETY |
ROADWAY SPECIALTIES, INC.($586,558) |
|
6450-13-001 |
BELL |
WACO |
$38,574,454 |
IH0035 |
RMC - 645013001 |
08/03/2023 |
11/15/2023 |
TOTAL MAINT |
ROY JORGENSEN ASSOCIATES, INC.($37,852,917) |
|
6393-26-001 |
BELL |
WACO |
$181,991 |
SH0036 |
RMC - 639326001 |
02/08/2022 |
11/15/2023 |
SWEEPING AND DEBRIS RMVL |
S6 INTERSTATE SERVICES($178,100) |
|
6441-84-001 |
BELL |
WACO |
$288,800 |
FM2268 |
RMC - 644184001 |
05/31/2023 |
11/15/2023 |
ILLUM MAINT |
SCOUT 5 CONSTRUCTION LLC($240,005) |
|
0398-04-077 |
BELL |
WACO |
$257,155 |
SH 317 |
BR 2022(433) |
04/07/2022 |
09/24/2024 |
BRIDGE MAINT |
SCR CIVIL CONSTRUCTION, LLC($355,836) |
|
0909-36-165 |
BELL |
WACO |
$705,810 |
CS |
BR 1802(814) |
08/03/2023 |
11/15/2023 |
REHAB BRIDGE AND APPROACHES |
SCR CIVIL CONSTRUCTION, LLC($881,150) |