0911-00-107 |
ANGELINA |
LUFKIN |
$3,770,973 |
VA |
STP 2B20(053)HES |
08/05/2020 |
11/15/2023 |
HAZARD ELIM & SAFETY |
3LW CIVIL LLC($3,456,090) |
|
6474-78-001 |
ANGELINA |
LUFKIN |
$830,603 |
US0059 |
RMC - 647478001 |
11/13/2024 |
10/18/2024 |
DEBRIS RMVL |
AAD CONTRACTING INC.($740,808) |
|
6467-25-001 |
ANGELINA |
LUFKIN |
$181,425 |
US0059 |
RMC - 646725001 |
08/14/2024 |
07/16/2024 |
METAL BEAM GUARD FENCE REPAIR |
ABOVE ALL CONTRACTING LLC($191,034) |
|
6429-90-001 |
ANGELINA |
LUFKIN |
$344,696 |
US0059 |
RMC - 642990001 |
02/01/2023 |
11/15/2023 |
MOW HWY RIGHT OF WAY |
ACE CONTRACTORS, INC.($445,235) |
|
6318-76-001 |
ANGELINA |
LUFKIN |
$195,875 |
US0059 |
RMC - 631876001 |
09/27/2017 |
11/15/2023 |
HIGH EDGE RMVL |
ACE CONTRACTORS, INC.($197,500) |
|
6411-51-001 |
ANGELINA |
LUFKIN |
$319,280 |
US0059 |
RMC - 641151001 |
08/03/2022 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR |
ACE CONTRACTORS, INC.($341,053) |
|
6351-48-001 |
ANGELINA |
LUFKIN |
$276,384 |
US0059 |
RMC - 635148001 |
11/13/2019 |
11/15/2023 |
REPAIR AND MAINT OF METAL BEAM GUARD FENCE |
ACE CONTRACTORS, INC.($328,612) |
|
6327-68-001 |
ANGELINA |
LUFKIN |
$203,904 |
US0059 |
RMC - 632768001 |
02/28/2018 |
11/15/2023 |
MOW RIGHT-OF-WAY AND LITTER RMVL |
ACE CONTRACTORS, INC.($280,012) |
|
6445-47-001 |
ANGELINA |
LUFKIN |
$29,700 |
BU0069J |
MMC - 644547001 |
06/08/2023 |
11/15/2023 |
HYDRAULIC CEMENT |
AKA-MATERIALS($31,050) |
|
6470-40-001 |
ANGELINA |
LUFKIN |
$64,512 |
BU0069J |
MMC - 647040001 |
07/23/2024 |
06/13/2024 |
HYDRAULIC CEMENT/BAG/ANGELINA (HOUSTON & SABINE) |
AKA-MATERIALS($61,098) |
|
1157-01-018 |
ANGELINA |
LUFKIN |
$5,172,350 |
FM 841 |
STP 2021(345)HES |
02/04/2021 |
11/15/2023 |
REPLACE GUARDRAIL |
A. L. HELMCAMP, INC.($5,264,677) |
|
0911-00-109 |
ANGELINA |
LUFKIN |
$4,952,509 |
VA |
F 2021(697) |
07/01/2021 |
11/15/2023 |
HWY IMPRV |
A. L. HELMCAMP, INC.($4,639,697) |
|
2589-01-023 |
ANGELINA |
LUFKIN |
$5,973,730 |
FM 2497 |
BR 2021(559) |
05/05/2021 |
11/15/2023 |
BRIDGE REPL |
A. L. HELMCAMP, INC.($5,264,189) |
|
0576-02-068 |
ANGELINA |
LUFKIN |
$7,487,234 |
FM 58 |
F 2023(668) |
05/05/2023 |
11/15/2023 |
HWY IMPRV |
A. L. HELMCAMP, INC.($9,734,198) |
|
0911-00-124 |
ANGELINA |
LUFKIN |
$886,598 |
VA |
F 2022(896) |
08/03/2022 |
11/15/2023 |
INTERS IMPRV |
ALLSTATE SIGNAL & CONSTRUCTION, LLC($899,492) |
|
6424-90-001 |
ANGELINA |
LUFKIN |
$460,640 |
US0059 |
RMC - 642490001 |
11/02/2022 |
11/15/2023 |
DEBRIS RMVL |
AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC($282,328) |
|
0176-08-024 |
ANGELINA |
LUFKIN |
$563,358 |
FM 324 |
STP 1802(328)HES |
07/10/2018 |
11/15/2023 |
IMPROVE GUARDRAIL AND SAFETY TREAT |
A R BROTHERS CONSTRUCTION SERVICES, INC.($533,772) |
|
0336-03-072 |
ANGELINA |
LUFKIN |
$5,218,381 |
SH 103 |
STP 2022(445)HES |
06/01/2022 |
09/03/2024 |
HAZARD ELIM & SAFETY |
A R BROTHERS CONSTRUCTION SERVICES, INC.($4,895,151) |
|
6432-84-001 |
ANGELINA |
LUFKIN |
$219,600 |
SL0287 |
MMC - 643284001 |
02/07/2023 |
11/15/2023 |
AGGREGATE GRADE 4 & 5 |
ARCOSA LWS, LLC($238,650) |
|
6362-39-001 |
ANGELINA |
LUFKIN |
$118,350 |
FM0819 |
MMC - 636239001 |
08/11/2020 |
11/15/2023 |
AGGREGATE, GRADE 4 & 5 (MATERIALS ONLY) |
ARCOSA LWS, LLC($120,300) |
|
6328-45-001 |
ANGELINA |
LUFKIN |
$1,100,250 |
US0059 |
RMC - 632845001 |
04/04/2018 |
11/15/2023 |
ON-CALL TRAF CONTROL SERVICES |
AREA WIDE PROTECTIVE, INC.($1,082,969) |
|
6442-72-001 |
ANGELINA |
LUFKIN |
$198,733 |
US0059 |
RMC - 644272001 |
08/16/2023 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR - ANGELINA |
AUSTIN BARRICADE COMPANY, L.L.C.($154,770) |
|
6448-05-001 |
ANGELINA |
LUFKIN |
$216,900 |
US0059 |
RMC - 644805001 |
08/16/2023 |
11/15/2023 |
TREE TRIM AND BRUSH RMVL - ANGELINA |
BA NEWTON'S ENTERPRISES LLC($168,850) |
|
6329-73-001 |
ANGELINA |
LUFKIN |
$285,530 |
US0059 |
RMC - 632973001 |
04/25/2018 |
11/15/2023 |
INSTL OF THERMOPLASTIC STRIPING |
BATTERSON, LLP($278,390) |
|
6451-37-001 |
ANGELINA |
LUFKIN |
$523,800 |
US0059 |
RMC - 645137001 |
09/07/2023 |
11/15/2023 |
REFL PAVMT MRK (LONG LINE) |
BATTERSON, LLP($399,400) |
|
6310-18-001 |
ANGELINA |
LUFKIN |
$181,810 |
US0059 |
RMC - 631018001 |
11/30/2016 |
11/15/2023 |
DISTRICT WIDE SPECIALTY PAVMT MRK |
BATTERSON, LLP($179,448) |
|
0911-00-079 |
ANGELINA |
LUFKIN |
$1,971,278 |
VA |
C 911-00-79 |
09/02/2021 |
11/15/2023 |
HWY IMPRV |
BATTERSON, LLP($1,710,272) |
|
6407-98-001 |
ANGELINA |
LUFKIN |
$262,350 |
US0059 |
RMC - 640798001 |
07/06/2022 |
11/15/2023 |
TRAF SIGNAL MAINT |
BAY CITY TRAFFIC($242,777) |
|
6384-31-001 |
ANGELINA |
LUFKIN |
$253,035 |
US0059 |
RMC - 638431001 |
09/21/2021 |
09/24/2024 |
TRAF ILLUM MAINT |
BAY CITY TRAFFIC($235,770) |
|
6356-74-001 |
ANGELINA |
LUFKIN |
$263,450 |
US0059 |
RMC - 635674001 |
04/22/2020 |
11/15/2023 |
DISTRICT WIDE TRAF SIGNAL MAINT |
BAY CITY TRAFFIC($261,700) |
|
6313-75-001 |
ANGELINA |
LUFKIN |
$298,930 |
US0059 |
RMC - 631375001 |
03/09/2017 |
11/15/2023 |
DISTRICT WIDE TRAF SIGNAL MAINT |
BAY CITY TRAFFIC($327,765) |
|
0176-03-131 |
ANGELINA |
LUFKIN |
$1,671,568 |
US 59 |
STP 1802(326)HES |
07/11/2018 |
11/15/2023 |
IMPROVE GUARDRAIL TO DES STANDARDS |
B & E CONSTRUCTION INC($1,620,249) |
|
6330-51-001 |
ANGELINA |
LUFKIN |
$278,000 |
US0059 |
RMC - 633051001 |
05/30/2018 |
11/15/2023 |
INSTL OF RAISED PAVMT MARKERS |
BRYDL CONTRACTING, INC.($262,316) |
|
6374-48-001 |
ANGELINA |
LUFKIN |
$251,848 |
US0059 |
RMC - 637448001 |
12/16/2020 |
11/15/2023 |
INSTL OF RAISED REFL PVMNT MRKNGS |
BRYDL CONTRACTING, INC.($219,640) |
|
6409-07-001 |
ANGELINA |
LUFKIN |
$281,000 |
US0059 |
RMC - 640907001 |
07/06/2022 |
11/15/2023 |
RAISED PAVMT MARKERS |
BRYDL CONTRACTING, LLC($285,344) |
|
6456-99-001 |
ANGELINA |
LUFKIN |
$283,125 |
US0059 |
RMC - 645699001 |
10/25/2023 |
11/15/2023 |
RAISED PAVMT MARKERS |
BRYDL CONTRACTING, LLC($288,179) |
|
0911-00-095 |
ANGELINA |
LUFKIN |
$3,604,870 |
VA |
C 911-00-95 |
02/01/2023 |
11/15/2023 |
HWY IMPRV |
CENTERLINE TECHNOLOGIES, LLC($3,368,123) |
|
6335-25-001 |
ANGELINA |
LUFKIN |
$279,500 |
US0059 |
RMC - 633525001 |
08/28/2018 |
11/15/2023 |
TREE RMVL AND TREE AND BRUSH TRIM |
C.E.S. CONTRACTOR($247,536) |
|
6309-64-001 |
ANGELINA |
LUFKIN |
$355,023 |
US0059 |
BPM - 630964001 |
02/03/2017 |
11/15/2023 |
BRIDGE PREVENT MAINT |
CHAMPION INFRASTRUCTURE, LLC($329,924) |
|
6332-13-001 |
ANGELINA |
LUFKIN |
$203,106 |
FM2109 |
RMC - 633213001 |
01/10/2019 |
11/15/2023 |
CULVERT REPAIR |
CHAMPION INFRASTRUCTURE, LLC($224,810) |
|
6311-96-001 |
ANGELINA |
LUFKIN |
$346,309 |
US0059 |
BPM - 631196001 |
02/03/2017 |
11/15/2023 |
BRIDGE AND SCOUR REPAIRS |
CHAMPION INFRASTRUCTURE, LLC($286,936) |
|
6324-31-001 |
ANGELINA |
LUFKIN |
$403,099 |
US0059 |
BPM - 632431001 |
12/05/2017 |
11/15/2023 |
BRIDGE PREVENT MAINT |
CHAMPION INFRASTRUCTURE, LLC($464,563) |
|
6366-09-001 |
ANGELINA |
LUFKIN |
$47,124 |
BU0069J |
MMC - 636609001 |
10/23/2020 |
11/15/2023 |
DELIVER BRINE TO 9 COUNTIES IN LFK DIST |
CLEMENTS FLUIDS HENDERSON, LTD.($27,258) |
|
6415-60-001 |
ANGELINA |
LUFKIN |
$46,200 |
US0059 |
MMC - 641560001 |
08/25/2022 |
11/15/2023 |
WINTER WEATHER MATERIAL |
CLEMENTS FLUIDS HENDERSON, LTD.($60,778) |
|
6471-30-001 |
ANGELINA |
LUFKIN |
$62,160 |
BU0069J |
MMC - 647130001 |
08/13/2024 |
07/10/2024 |
WINTER WEATHER MATERIAL/DISTRICTWIDE |
CLEMENTS FLUIDS HENDERSON, LTD.($52,723) |
|
6446-02-001 |
ANGELINA |
LUFKIN |
$27,600 |
BU0069J |
MMC - 644602001 |
06/13/2023 |
11/15/2023 |
EMULSION CRS2P |
CLEVELAND ASPHALT PRODUCTS, INC.($30,500) |
|
6361-24-001 |
ANGELINA |
LUFKIN |
$51,000 |
US0069 |
MMC - 636124001 |
07/14/2020 |
09/26/2024 |
EMULSIONS, CRS-2P (MATERIAL ONLY) |
CLEVELAND ASPHALT PRODUCTS, INC.($45,400) |
|
6400-86-001 |
ANGELINA |
LUFKIN |
$254,320 |
FM1194 |
MMC - 640086001 |
04/28/2022 |
11/15/2023 |
EMULSION |
CLEVELAND ASPHALT PRODUCTS, INC.($291,720) |
|
6445-80-001 |
ANGELINA |
LUFKIN |
$50,400 |
SL0287 |
MMC - 644580001 |
06/13/2023 |
11/15/2023 |
CUTBACK ASPH RC250 |
CLEVELAND ASPHALT PRODUCTS, INC.($48,840) |
|
0911-38-071 |
ANGELINA |
LUFKIN |
$159,261 |
VA |
STP 2019(183) |
09/06/2019 |
11/15/2023 |
LANDSCAPING_IN VARIOUS LOCATIONS |
COX CONCRETE CONTRACTORS, INCORPORATED($324,634) |
|
6302-61-001 |
ANGELINA |
LUFKIN |
$236,648 |
US0069 |
RMC - 630261001 |
09/28/2016 |
11/15/2023 |
PARKING LOT CONSTRUCTION |
CROCKETT CONSTRUCTION INC.($229,592) |
|
0176-02-124 |
ANGELINA |
LUFKIN |
$979,564 |
BU 59-G |
F 2021(825) |
08/04/2021 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
DBI SERVICES, LLC($934,763) |
|
0911-00-110 |
ANGELINA |
LUFKIN |
$629,575 |
VA |
C 911-00-110 |
03/05/2021 |
11/15/2023 |
BRIDGE MAINT |
DBI SERVICES, LLC($615,934) |
|
6409-29-001 |
ANGELINA |
LUFKIN |
$221,250 |
US0059 |
RMC - 640929001 |
08/10/2022 |
11/15/2023 |
MAINT OF LARGE SIGNS |
DCC CONSTRUCTION AND SERVICES, L.L.C.($251,830) |
|
6366-09-001 |
ANGELINA |
LUFKIN |
$44,268 |
BU0069J |
MMC - 636609001 |
09/08/2020 |
11/15/2023 |
DELIVER BRINE TO 9 COUNTIES IN LFK DIST |
DIGG COMMERCIAL, LLC($214,200) |
|
2750-01-005 |
ANGELINA |
LUFKIN |
$1,932,663 |
FM 2680 |
STP 2023(393)HES |
03/08/2023 |
08/21/2024 |
HAZARD ELIM & SAFETY |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($2,660,027) |
|
6412-03-001 |
ANGELINA |
LUFKIN |
$315,690 |
US0069 |
RMC - 641203001 |
01/05/2023 |
11/15/2023 |
REHAB OF EXIST ROADWAY |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($511,628) |
|
0200-03-021 |
ANGELINA |
LUFKIN |
$32,534,931 |
US 69 |
NH 2014(444) |
06/05/2019 |
11/15/2023 |
GRADING, STRUCTS, BASE & SURF |
DREWERY CONSTRUCTION COMPANY, INCORPORATED($37,447,955) |
|
6361-21-001 |
ANGELINA |
LUFKIN |
$675,005 |
US0059 |
MMC - 636121001 |
06/05/2020 |
11/15/2023 |
HOT MIX ASPH C & D (MATERIAL ONLY) |
EAST TEXAS ASPHALT CO., LTD.($645,500) |
|
6362-44-001 |
ANGELINA |
LUFKIN |
$170,000 |
US0059 |
MMC - 636244001 |
07/07/2020 |
09/26/2024 |
FLEXIBLE BASE (MATERIAL ONLY) |
EAST TEXAS ASPHALT CO., LTD.($171,400) |
|
6400-72-001 |
ANGELINA |
LUFKIN |
$265,995 |
FM0324 |
MMC - 640072001 |
05/12/2022 |
11/15/2023 |
HOT MIX |
EAST TEXAS ASPHALT CO., LTD.($299,635) |
|
6378-30-001 |
ANGELINA |
LUFKIN |
$283,000 |
SL0287 |
MMC - 637830001 |
04/15/2021 |
11/15/2023 |
HOT MIX |
EAST TEXAS ASPHALT CO., LTD.($319,000) |
|
0911-00-075 |
ANGELINA |
LUFKIN |
$2,622,024 |
VA |
STP 2018(936) |
06/06/2018 |
11/15/2023 |
CONSTRUCT CURB RAMPS |
ENCINO LANDSCAPE, INC.($2,105,750) |
|
0176-02-125 |
ANGELINA |
LUFKIN |
$1,116,133 |
BU 59-G |
F 2022(895) |
08/04/2022 |
11/15/2023 |
BICYCLE AND PEDESTRIAN IMPRVS |
ENCINO LANDSCAPE, INC.($1,363,054) |
|
0911-00-076 |
ANGELINA |
LUFKIN |
$4,274,919 |
VA |
STP 1902(159) |
07/09/2019 |
09/27/2024 |
PEDESTRIAN, SIDEWALKS & CURB RAMPS |
ENCINO LANDSCAPE, INC.($5,294,836) |
|
0911-00-117 |
ANGELINA |
LUFKIN |
$639,798 |
VA |
C 911-00-117 |
11/03/2021 |
11/15/2023 |
BRIDGE MAINT |
FNH CONSTRUCTION, LLC($505,300) |
|
0911-00-123 |
ANGELINA |
LUFKIN |
$1,916,704 |
VA |
F 2024(103) |
07/09/2024 |
05/28/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
GARRET SHIELDS INFRASTRUCTURE($1,672,687) |
|
6403-03-001 |
ANGELINA |
LUFKIN |
$539,620 |
US0059 |
BPM - 640303001 |
09/08/2022 |
11/15/2023 |
BRIDGE PREVENT MAINT |
GARRET SHIELDS INFRASTRUCTURE($428,990) |
|
6456-17-001 |
ANGELINA |
LUFKIN |
$727,945 |
US0059 |
BPM - 645617001 |
11/01/2023 |
11/15/2023 |
BRIDGE PREVENT MAINT |
GARRET SHIELDS INFRASTRUCTURE($583,220) |
|
0911-00-116 |
ANGELINA |
LUFKIN |
$744,361 |
VA |
BR 2B23(192) |
09/07/2023 |
11/15/2023 |
BRIDGE MAINT |
GARRET SHIELDS INFRASTRUCTURE($644,360) |
|
6295-05-001 |
ANGELINA |
LUFKIN |
$246,350 |
US0059 |
RMC - 629505001 |
09/28/2016 |
11/15/2023 |
DISTRICT WIDE CRACK SEAL |
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY($190,733) |
|
6460-19-001 |
ANGELINA |
LUFKIN |
$254,013 |
US0059 |
RMC - 646019001 |
11/15/2023 |
11/15/2023 |
CRACK SEAL |
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY($316,120) |
|
6404-26-001 |
ANGELINA |
LUFKIN |
$481,175 |
US0069 |
RMC - 640426001 |
06/29/2022 |
11/15/2023 |
CRACK SEAL |
GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY($269,956) |
|
0911-38-071 |
ANGELINA |
LUFKIN |
$207,605 |
VA |
STP 2019(183) |
11/07/2018 |
11/15/2023 |
LANDSCAPING_IN VARIOUS LOCATIONS |
GREEN SOURCE ENVIRONMENTAL SOLUTIONS, INC.($238,595) |
|
0911-00-106 |
ANGELINA |
LUFKIN |
$3,924,945 |
VA |
C 911-00-106 |
08/05/2021 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
HIGHWAY 19 CONSTRUCTION LLC($4,121,119) |
|
0911-00-081 |
ANGELINA |
LUFKIN |
$1,315,318 |
VA |
STP 2020(175) |
01/10/2020 |
09/26/2024 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
HIGHWAY 19 CONSTRUCTION LLC($1,262,425) |
|
6470-90-001 |
ANGELINA |
LUFKIN |
$395,450 |
US0059 |
RMC - 647090001 |
09/11/2024 |
08/08/2024 |
SPOT PAVMT MRK |
INTERSTATE BARRICADES & MARKINGS, INC.($432,900) |
|
0200-02-039 |
ANGELINA |
LUFKIN |
$72,772,732 |
US 69 |
NH 2018(811) |
05/02/2018 |
11/15/2023 |
GR STRS BASE & SURF |
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY($71,614,967) |
|
6352-18-001 |
ANGELINA |
LUFKIN |
$265,850 |
US0059 |
RMC - 635218001 |
11/13/2019 |
11/15/2023 |
TREE & BRUSH REM AND TREE TRIM |
K & R CONTRACTORS($268,350) |
|
6467-23-001 |
ANGELINA |
LUFKIN |
$142,217 |
US0059 |
RMC - 646723001 |
07/24/2024 |
06/27/2024 |
TREE TRIM AND BRUSH RMVL |
K & R CONTRACTORS($166,250) |
|
6324-32-001 |
ANGELINA |
LUFKIN |
$197,169 |
US0059 |
BPM - 632432001 |
01/10/2018 |
11/15/2023 |
BRIDGE AND SCOUR REPAIRS |
L.C. JORDAN & SON($219,453) |
|
0336-03-071 |
ANGELINA |
LUFKIN |
$1,217,321 |
SH 103 |
STP 2019(635) |
03/06/2019 |
11/15/2023 |
WIDENING PAVING FOR ADDITIONAL TURNING LANES |
LONGVIEW BRIDGE AND ROAD, LTD.($1,665,263) |
|
0176-02-118 |
ANGELINA |
LUFKIN |
$48,176,388 |
US 59 |
F 2021(440) |
06/02/2022 |
09/03/2024 |
HWY IMPRV |
LONGVIEW BRIDGE AND ROAD, LTD.($63,145,676) |
|
2553-01-115 |
ANGELINA |
LUFKIN |
$15,921,009 |
US 59 |
NH 2B20(055) |
10/01/2020 |
11/15/2023 |
CONVERT TO 4 LANE FRWY W/2 LANE NB&SB FRONTAGE RD |
LONGVIEW BRIDGE AND ROAD, LTD.($19,326,241) |
|
6400-74-001 |
ANGELINA |
LUFKIN |
$40,680 |
SL0287 |
MMC - 640074001 |
04/28/2022 |
11/15/2023 |
CUTBACK |
MARTIN RESOURCE MANAGEMENT CORPORATION($43,200) |
|
6378-37-001 |
ANGELINA |
LUFKIN |
$21,300 |
SL0287 |
MMC - 637837001 |
04/12/2021 |
11/15/2023 |
CUTBACK |
MARTIN RESOURCE MANAGEMENT CORPORATION($17,700) |
|
6384-14-001 |
ANGELINA |
LUFKIN |
$216,100 |
FM1194 |
MMC - 638414001 |
08/10/2021 |
11/15/2023 |
EMULSIONS CRS2P |
MARTIN RESOURCE MANAGEMENT CORPORATION($214,760) |
|
6362-32-001 |
ANGELINA |
LUFKIN |
$138,875 |
US0059 |
MMC - 636232001 |
06/09/2020 |
11/15/2023 |
ASPH CUTBACK RC250 (MATERIAL ONLY) |
MARTIN RESOURCE MANAGEMENT CORPORATION($179,230) |
|
0200-01-083 |
ANGELINA |
LUFKIN |
$1,593,129 |
US 69 |
NH 2016(424) |
12/06/2017 |
11/15/2023 |
RESURF WITH THIN OVERLAY MIXTURE |
MOORE BROTHERS CONSTRUCTION COMPANY($1,576,982) |
|
6320-98-001 |
ANGELINA |
LUFKIN |
$1,114,557 |
US0059 |
RMC - 632098001 |
08/08/2017 |
11/15/2023 |
MILL AND INLAY |
MOORE BROTHERS CONSTRUCTION COMPANY($988,331) |
|
6407-22-001 |
ANGELINA |
LUFKIN |
$1,619,821 |
US0059 |
RMC - 640722001 |
08/04/2022 |
11/15/2023 |
MILL AND INLAY |
MOORE BROTHERS CONSTRUCTION COMPANY($1,793,511) |
|
6353-47-001 |
ANGELINA |
LUFKIN |
$951,045 |
US0059 |
RMC - 635347001 |
07/08/2020 |
11/15/2023 |
MILL AND INLAY |
MOORE BROTHERS CONSTRUCTION COMPANY($939,518) |
|
0176-02-120 |
ANGELINA |
LUFKIN |
$3,117,155 |
US 59 |
NH 2017(826) |
03/08/2017 |
11/15/2023 |
HMA LEVEL UP, OCST AND PFC SURF |
MOORE BROTHERS CONSTRUCTION COMPANY($2,865,624) |
|
3264-01-010 |
ANGELINA |
LUFKIN |
$2,186,830 |
FM 326 |
F 2023(012) |
09/07/2022 |
11/15/2023 |
ROADWAY REHAB/RECON |
MOORE BROTHERS CONSTRUCTION COMPANY($2,637,474) |
|
0336-05-061 |
ANGELINA |
LUFKIN |
$1,287,979 |
SH 103 |
C 336-5-61 |
12/05/2018 |
11/15/2023 |
RESURF WITH THIN OVERLAY MIXTURE |
MOORE BROTHERS CONSTRUCTION COMPANY($1,098,660) |
|
0176-03-135 |
ANGELINA |
LUFKIN |
$8,387,938 |
US 59 |
NH 2018(772) |
04/04/2018 |
11/15/2023 |
PLANE, HMA LEVEL-UP, OCST, PFC |
MOORE BROTHERS CONSTRUCTION COMPANY($8,332,375) |
|
6473-92-001 |
ANGELINA |
LUFKIN |
$318,550 |
US0059 |
RMC - 647392001 |
10/22/2024 |
09/25/2024 |
MAINT OF LARGE SIGNS |
ODUM SERVICES, LLC($347,200) |
|
2960-01-012 |
ANGELINA |
LUFKIN |
$449,924 |
FM 1194 |
STP 2018(254)HES |
11/02/2017 |
11/15/2023 |
PROVIDE ADDITIONAL PAVED SURF WIDTH |
PINTO CONSTRUCTION CO., INC.($459,201) |
|
0576-02-069 |
ANGELINA |
LUFKIN |
$11,694,246 |
FM 58 |
F 2B24(082) |
05/03/2024 |
03/22/2024 |
ROADWAY REHAB/RECON WITH NO ADDE |
PINTO CONSTRUCTION CO., INC.($11,095,200) |
|
2507-01-020 |
ANGELINA |
LUFKIN |
$3,873,890 |
FM 326 |
STP 1902(160) |
07/09/2019 |
09/27/2024 |
REHAB OF EXIST ROAD |
PINTO CONSTRUCTION CO., INC.($3,646,857) |