|
0902-50-143 |
JOHNSON |
FORT WORTH |
$797,966 |
VA |
STP 2024(633)VRU |
01/05/2024 |
11/24/2023 |
INTERS IMPRV |
FLORIDA TRAFFIC CONTROL DEVICES, INC.($730,198) |
|
0919-00-085 |
CASS |
ATLANTA |
$2,154,877 |
VA |
C 919-00-85 |
01/04/2024 |
11/23/2023 |
HWY IMPRV |
STRIPE-A-ZONE, LLC($2,925,770) |
|
0925-00-093 |
CHILDRESS |
CHILDRESS |
$1,804,310 |
VA |
C 925-00-93 |
01/05/2024 |
11/24/2023 |
BRIDGE MAINT |
SCR CIVIL CONSTRUCTION, LLC($1,520,758) |
|
0925-00-080 |
CHILDRESS |
CHILDRESS |
$1,495,902 |
VA |
C 925-00-80 |
01/04/2024 |
11/23/2023 |
STRIPING |
TEXAS PANHANDLE CONSTRUCTION, INC.($1,414,600) |
|
0910-00-137 |
SMITH |
TYLER |
$1,774,650 |
VA |
STP 2024(629)VRU |
01/05/2024 |
11/24/2023 |
HAZARD ELIM & SAFETY |
TEXAS TRAFFIC CONTROL SYSTEMS, INC.($1,755,175) |
|
0912-00-698 |
HARRIS |
HOUSTON |
$1,556,932 |
VA |
F 2024(618) |
01/05/2024 |
11/24/2023 |
EMISSIONS REDUCTION |
SELECT MAINTENANCE, L.L.C.($3,246,728) |
|
0912-37-252 |
MONTGOMERY |
HOUSTON |
$1,260,866 |
VA |
C 912-37-252 |
01/05/2024 |
11/24/2023 |
SURF/ROADWAY RESTOR |
PROFESSIONAL TRAFFIC CONTROL LLC($956,941) |
|
0912-72-749 |
HARRIS |
HOUSTON |
$2,643,457 |
VA |
C 912-72-749 |
01/05/2024 |
11/24/2023 |
REHAB BRIDGE |
ISI CONTRACTING, INC.($2,695,935) |
|
0912-73-232 |
GALVESTON |
HOUSTON |
$1,286,162 |
VA |
C 912-73-232 |
01/05/2024 |
11/24/2023 |
REHAB BRIDGE |
ISI CONTRACTING, INC.($1,093,188) |
|
0914-00-459 |
TRAVIS |
AUSTIN |
$1,297,801 |
VA |
STP 2024(597)VRU |
01/05/2024 |
11/24/2023 |
TRAF SIGNAL IMPRVS |
THE LEVY COMPANY, INC.($1,147,055) |
|
0028-02-099 |
HARRIS |
HOUSTON |
$10,981,998 |
US 90 |
C 28-2-99 |
01/04/2024 |
11/23/2023 |
SURF/ROADWAY RESTOR |
TEXAS MATERIALS GROUP, INC.($10,229,817) |
|
0070-02-099 |
TOM GREEN |
SAN ANGELO |
$5,033,300 |
US 87 |
STP 2024(659)HES |
01/04/2024 |
11/23/2023 |
HAZARD ELIM & SAFETY |
SCOUT 5 CONSTRUCTION LLC($4,084,306) |
|
0069-07-111 |
TOM GREEN |
SAN ANGELO |
$731,705 |
US 87 |
STP 2024(725)HES |
01/05/2024 |
11/30/2023 |
TRAF SIGNAL IMPRVS |
3LW CIVIL LLC($987,487) |
|
0054-08-027 |
MILLS |
BROWNWOOD |
$13,905,808 |
US 84 |
C 54-8-27 |
01/05/2024 |
11/24/2023 |
RESURF ROADWAY |
BIG CREEK CONSTRUCTION, LTD.($11,688,750) |
|
0054-03-027 |
COLEMAN |
BROWNWOOD |
$16,227,563 |
US 84 |
C 54-3-27 |
01/04/2024 |
11/23/2023 |
RESURF ROADWAY |
ALLEN KELLER COMPANY($14,784,352) |
|
0038-07-078 |
STARR |
PHARR |
$7,616,090 |
US 83 |
F 2024(695) |
01/04/2024 |
11/23/2023 |
OVERLAY |
IOC COMPANY LLC($7,818,780) |
|
0206-07-059 |
RUSK |
TYLER |
$4,458,301 |
US 79 |
C 206-7-59 |
01/04/2024 |
11/23/2023 |
PVMNT REPAIR, PLANING, OCST, PFC SURF, MBGF, PV MK |
MADDEN CONTRACTING COMPANY, LLC.($3,202,957) |
|
0049-07-069 |
ROBERTSON |
BRYAN |
$930,937 |
US 79 |
STP 2024(610)VRU |
01/04/2024 |
11/23/2023 |
TRAF SIGNAL IMPRVS |
ELECNOR BELCO ELECTRIC, INC.($903,067) |
|
0371-01-090 |
VICTORIA |
YOAKUM |
$10,129,259 |
US 77 |
F 2024(643) |
01/04/2024 |
11/23/2023 |
SURF/ROADWAY RESTOR |
HUNTER INDUSTRIES, LTD.($11,515,798) |
|
0211-06-059 |
FAYETTE |
YOAKUM |
$128,168,588 |
US 77 |
F 2024(576) |
01/05/2024 |
11/24/2023 |
WIDEN ROAD - ADD LANES |
HUNTER INDUSTRIES, LTD.($112,692,666) |
|
0047-14-053 |
COLLIN |
DALLAS |
$106,215,458 |
US 75 |
F 2024(691) |
01/04/2024 |
11/23/2023 |
WIDEN TO 6 LANE DIVIDED FREEWAY |
MARIO SINACOLA & SONS EXCAVATING, INC.($88,035,840) |
|
0203-05-047 |
WOOD |
TYLER |
$9,303,468 |
US 69 |
C 203-5-47 |
01/05/2024 |
11/24/2023 |
REHAB EXIST ROADWAY |
TRUE ROADS CONSTRUCTION, LLC($6,350,678) |
|
0010-08-060 |
MORRIS |
ATLANTA |
$3,311,205 |
US 67 |
STP 2024(632)HES |
01/04/2024 |
08/25/2024 |
INSTL ILLUM |
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC($5,087,951) |
|
0010-08-060 |
MORRIS |
ATLANTA |
$956,206 |
US 67 |
STP 2024(632)HES |
05/02/2024 |
11/23/2023 |
INSTL ILLUM |
VACA UNDERGROUND UTILITIES INC($948,822) |
|
0259-03-061 |
SOMERVELL |
FORT WORTH |
$478,952 |
US 67 |
STP 2024(345)HES |
01/04/2024 |
11/23/2023 |
INTERS IMPRV |
WG ENGINEERING & CONSTRUCTION, LLC($636,773) |
|
0054-07-090 |
BROWN |
BROWNWOOD |
$9,609,828 |
US 67 |
C 54-7-90 |
01/05/2024 |
11/24/2023 |
RESURF ROADWAY |
ALLEN KELLER COMPANY($8,999,250) |
|
0020-08-048 |
PRESIDIO |
EL PASO |
$13,040,978 |
US 67 |
C 20-8-48 |
01/05/2024 |
11/24/2023 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($14,287,895) |
|
0904-00-232 |
POTTER |
AMARILLO |
$1,212,543 |
US 60 |
BR 2024(520) |
01/05/2024 |
11/24/2023 |
BRIDGE MAINT |
DCC CONSTRUCTION AND SERVICES, L.L.C.($1,635,105) |
|
0168-05-043 |
DEAF SMITH |
AMARILLO |
$2,169,977 |
US 60 |
C 168-5-43 |
01/04/2024 |
11/23/2023 |
HWY IMPRV |
L A FULLER & SONS CONSTRUCTION, LTD.($1,956,451) |
|
0218-03-094 |
CASS |
ATLANTA |
$9,753,014 |
US 59 |
C 218-3-94 |
01/05/2024 |
11/24/2023 |
REHAB EXIST ROADWAY |
RK HALL, LLC($9,155,620) |
|
0088-05-110 |
VICTORIA |
YOAKUM |
$1,885,447 |
US 59 |
F 2024(584) |
01/05/2024 |
11/24/2023 |
INSTL ILLUM |
TRAF-TEX, INC.($1,666,764) |
|
0297-01-014 |
YOAKUM |
LUBBOCK |
$4,999,591 |
US 380 |
C 297-1-14 |
01/05/2024 |
11/24/2023 |
REHAB EXIST ROADWAY |
JAMES HAMILTON CONSTRUCTION CO.($6,041,330) |
|
0113-13-184 |
TRAVIS |
AUSTIN |
$2,120,772 |
US 290 |
C 113-13-184 |
01/04/2024 |
11/23/2023 |
RESURF ROADWAY |
LONE STAR PAVING COMPANY($2,026,821) |
|
0043-04-083 |
HARDEMAN |
CHILDRESS |
$9,300,051 |
US 287 |
F 2024(638) |
01/05/2024 |
11/24/2023 |
HWY IMPRV |
DUININCK, INC.($8,059,391) |
|
0392-03-053 |
GREGG |
TYLER |
$4,145,544 |
US 259 |
C 392-3-53 |
01/05/2024 |
11/24/2023 |
REHAB EXIST ROADWAY |
LONGVIEW BRIDGE AND ROAD, LTD.($3,567,935) |
|
0213-06-041 |
TYLER |
BEAUMONT |
$8,132,488 |
US 190 |
NH 2013(561) |
01/04/2024 |
11/23/2023 |
CONSTRUCT PASSING LANES |
PINTO CONSTRUCTION CO., INC.($9,062,105) |
|
0101-04-131 |
SAN PATRICIO |
CORPUS CHRISTI |
$15,565,359 |
US 181 |
F 2024(689) |
01/05/2024 |
11/24/2023 |
RESURF ROADWAY |
ANDERSON COLUMBIA CO., INC.($12,996,391) |
|
0296-01-039 |
SCURRY |
ABILENE |
$3,166,079 |
US 180 |
F 2024(705) |
01/05/2024 |
11/24/2023 |
PREVENT MAINT |
J. H. STRAIN & SONS, INC.($3,120,195) |
|
6461-93-001 |
DENTON |
DALLAS |
$100,000 |
US0380 |
MMC - 646193001 |
01/10/2024 |
12/13/2023 |
HOT MIX |
JAGOE-PUBLIC COMPANY($87,950) |
|
6461-98-001 |
DENTON |
DALLAS |
$55,800 |
US0380 |
MMC - 646198001 |
01/10/2024 |
12/13/2023 |
EMULSION |
ERGON ASPHALT & EMULSIONS, INC.($59,220) |
|
6449-89-001 |
COLLIN |
DALLAS |
$387,439 |
US0380 |
RMC - 644989001 |
01/04/2024 |
11/23/2023 |
MOW HWY RIGHT OF WAY |
PREMIER CONTRACTORS LLC($431,359) |
|
6449-67-001 |
TRINITY |
LUFKIN |
$209,275 |
US0287 |
RMC - 644967001 |
01/17/2024 |
12/14/2023 |
MOW HWY RIGHT OF WAY - FY24 TRINITY COUNTY |
ROY LEE WALKER($144,472) |
|
6393-32-001 |
MOORE |
AMARILLO |
$624,600 |
US0287 |
RMC - 639332001 |
01/05/2024 |
11/29/2023 |
TREE RMVL |
DCC CONSTRUCTION AND SERVICES, L.L.C.($531,410) |
|
6460-42-001 |
HOUSTON |
LUFKIN |
$408,690 |
US0287 |
RMC - 646042001 |
01/04/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY - FY24 HOUSTON |
SERVIN MOWING($274,421) |
|
6408-93-001 |
BLANCO |
AUSTIN |
$1,927,040 |
US0281 |
MMC - 640893001 |
01/04/2024 |
11/23/2023 |
ASPH |
ERGON ASPHALT & EMULSIONS, INC.($1,817,030) |
|
6419-89-001 |
SUTTON |
SAN ANGELO |
$1,160,880 |
US0277 |
RMC - 641989001 |
08/02/2024 |
11/20/2023 |
MILLING |
EMERY SAPP & SON'S INC.($1,277,999) |
|
6452-35-001 |
MAVERICK |
LAREDO |
$2,230,587 |
US0277 |
RMC - 645235001 |
01/04/2024 |
12/01/2023 |
MILL AND INLAY |
CK NEWBERRY, LLC($2,370,971) |
|
6453-83-001 |
TITUS |
ATLANTA |
$279,376 |
US0271 |
RMC - 645383001 |
01/10/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY |
EASTGATE SERVICES($323,488) |
|
6453-87-001 |
BOWIE |
ATLANTA |
$249,280 |
US0259 |
RMC - 645387001 |
01/10/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY |
PERRY WEST($246,000) |
|
6460-82-001 |
ROBERTSON |
BRYAN |
$270,751 |
US0190 |
RMC - 646082001 |
01/10/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY |
ABESCAPE LANDSCAPING, LLC($185,647) |
|
6460-83-001 |
MADISON |
BRYAN |
$186,258 |
US0190 |
RMC - 646083001 |
01/08/2024 |
11/28/2023 |
MOW HWY RIGHT OF WAY |
ROY LEE WALKER($139,891) |
|
6462-41-001 |
SAN PATRICIO |
CORPUS CHRISTI |
$190,100 |
US0181 |
MMC - 646241001 |
01/16/2024 |
12/20/2023 |
EMULSION |
ERGON ASPHALT & EMULSIONS, INC.($177,690) |
|
6462-40-001 |
KARNES |
CORPUS CHRISTI |
$295,800 |
US0181 |
MMC - 646240001 |
01/16/2024 |
12/13/2023 |
HOT MIX |
TEXAS MATERIALS GROUP, INC.($251,600) |
|
6449-61-001 |
SABINE |
LUFKIN |
$291,523 |
US0096 |
RMC - 644961001 |
01/10/2024 |
12/07/2023 |
SABINE COUNTY - MOW HWY RIGHT OF WAY |
ACE CONTRACTORS, INC.($292,599) |
|
6449-63-001 |
SAN AUGUSTINE |
LUFKIN |
$237,683 |
US0096 |
RMC - 644963001 |
01/17/2024 |
12/14/2023 |
MOW HWY RIGHT OF WAY - SAN AUGUSTINE |
P-VILLE, INCORPORATED($181,625) |
|
6451-77-001 |
BREWSTER |
EL PASO |
$1,423,930 |
US0090 |
RMC - 645177001 |
01/04/2024 |
11/29/2023 |
METAL BEAM GUARD FENCE REPAIR |
DIGG COMMERCIAL, LLC($1,194,460) |
|
6417-14-001 |
KINNEY |
LAREDO |
$532,029 |
US0090 |
RMC - 641714001 |
04/04/2024 |
12/22/2023 |
MISCELLANEOUS CONC REPAIR |
STX CIVIL($641,240) |
|
6461-56-001 |
MOORE |
AMARILLO |
$247,224 |
US0087 |
MMC - 646156001 |
01/04/2024 |
11/23/2023 |
AGGREGATE |
HOWELL SAND COMPANY, INC.($225,718) |
|
6443-80-001 |
MCLENNAN |
WACO |
$860,100 |
US0084 |
MMC - 644380001 |
01/04/2024 |
11/30/2023 |
HOT MIX |
BIG CREEK CONSTRUCTION, LTD.($829,225) |
|
6392-01-001 |
SCURRY |
ABILENE |
$1,538,188 |
US0084 |
RMC - 639201001 |
02/02/2024 |
12/01/2023 |
MILL AND INLAY |
RK HALL, LLC($1,567,467) |
|
6453-81-001 |
HARRISON |
ATLANTA |
$322,772 |
US0080 |
RMC - 645381001 |
01/05/2024 |
11/28/2023 |
MOW HWY RIGHT OF WAY |
DCC CONSTRUCTION AND SERVICES, L.L.C.($311,645) |
|
6461-86-001 |
KLEBERG |
CORPUS CHRISTI |
$640,625 |
US0077 |
RMC - 646186001 |
01/04/2024 |
11/22/2023 |
DRAINAGE IMPRV AND/OR REPAIRS |
ICOS MANAGEMENT, LLC($699,900) |
|
6462-38-001 |
NUECES |
CORPUS CHRISTI |
$293,480 |
US0077 |
MMC - 646238001 |
01/16/2024 |
12/13/2023 |
HOT MIX |
COLORADO MATERIALS, LTD.($287,784) |
|
6447-99-001 |
NUECES |
CORPUS CHRISTI |
$3,001,171 |
US0077 |
RMC - 644799001 |
01/04/2024 |
11/23/2023 |
SWEEPING AND DEBRIS RMVL |
SWEEPING CORPORATION OF AMERICA, LLC($1,607,955) |
|
6456-97-001 |
COLLIN |
DALLAS |
$242,414 |
US0075 |
RMC - 645697001 |
01/10/2024 |
12/13/2023 |
ON CALL REFLECTORIZED PAVMT MRK |
TRAFFIC HIGHWAY MAINTENANCE, LLC($236,740) |
|
6456-15-001 |
COLLIN |
DALLAS |
$477,702 |
US0075 |
RMC - 645615001 |
01/04/2024 |
11/23/2023 |
RAISED PAVMT MARKERS |
FC TRAFFIC CONTROL, INC.($388,191) |
|
6449-93-001 |
COLLIN |
DALLAS |
$72,594 |
US0075 |
RMC - 644993001 |
03/12/2024 |
11/29/2023 |
VEGETATION MGT |
RENEGADE SITE SOLUTIONS, LLC($63,719) |
|
6449-93-001 |
COLLIN |
DALLAS |
$67,103 |
US0075 |
RMC - 644993001 |
01/10/2024 |
08/25/2024 |
VEGETATION MGT |
ANTHONY SERVICES($104,502) |
|
6449-91-001 |
COLLIN |
DALLAS |
$522,269 |
US0075 |
RMC - 644991001 |
01/04/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY |
ANTHONY SERVICES($592,733) |
|
6458-93-001 |
JEFFERSON |
BEAUMONT |
$500,000 |
US0069 |
RMC - 645893001 |
01/04/2024 |
12/04/2023 |
LARGE SIGN REPL |
3LW CIVIL LLC($675,755) |
|
6420-67-001 |
TOM GREEN |
SAN ANGELO |
$901,748 |
US0067 |
RMC - 642067001 |
02/01/2024 |
12/05/2023 |
REFLECTORIZED PAVMT MRK & MARKERS |
L&L COMPANY($345,145) |
|
6461-55-001 |
CARSON |
AMARILLO |
$1,514,589 |
US0060 |
MMC - 646155001 |
01/04/2024 |
11/23/2023 |
AGGREGATE |
HOWELL SAND COMPANY, INC.($1,429,382) |
|
6461-77-001 |
GRAY |
AMARILLO |
$559,750 |
US0060 |
RMC - 646177001 |
01/05/2024 |
11/29/2023 |
TREE RMVL |
ALLIES LAND CLEARING($459,001) |
|
6462-34-001 |
GOLIAD |
CORPUS CHRISTI |
$169,000 |
US0059 |
RMC - 646234001 |
01/16/2024 |
12/21/2023 |
TREE TRIM AND BRUSH RMVL |
JCW CONSTRUCTION, LLC($178,017) |
|
6454-76-001 |
FORT BEND |
HOUSTON |
$374,675 |
US0059 |
RMC - 645476001 |
01/04/2024 |
11/21/2023 |
BRIDGE DECK REPAIR |
ISI CONTRACTING, INC.($368,000) |
|
6461-04-001 |
WHARTON |
YOAKUM |
$253,500 |
US0059 |
MMC - 646104001 |
01/23/2024 |
12/20/2023 |
FLEXIBLE BASE |
COLORADO MATERIALS, LTD.($247,425) |
|
6461-06-001 |
WHARTON |
YOAKUM |
$250,000 |
US0059 |
MMC - 646106001 |
01/23/2024 |
12/20/2023 |
HOT-MIX COLD-LAID |
QUALITY HOT MIX, INC.($225,000) |
|
6461-11-001 |
WHARTON |
YOAKUM |
$126,000 |
US0059 |
MMC - 646111001 |
01/23/2024 |
12/20/2023 |
ROCK/RIPRAP |
TEXAS MATERIALS GROUP, INC.($116,480) |
|
6461-13-001 |
WHARTON |
YOAKUM |
$39,218 |
US0059 |
MMC - 646113001 |
01/23/2024 |
12/20/2023 |
HYDRAULIC CEMENT |
AKA-MATERIALS($39,323) |
|
6461-15-001 |
WHARTON |
YOAKUM |
$231,000 |
US0059 |
MMC - 646115001 |
01/23/2024 |
12/20/2023 |
ASPHIC PATCHING MATERIAL |
WALLER COUNTY ASPHALT INC.($245,155) |
|
6449-57-001 |
POLK |
LUFKIN |
$502,823 |
US0059 |
RMC - 644957001 |
01/05/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY - POLK |
ROY LEE WALKER($410,196) |
|
6453-72-001 |
PANOLA |
ATLANTA |
$206,492 |
US0059 |
RMC - 645372001 |
01/10/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY |
SERVIN MOWING($178,344) |
|
6461-16-001 |
WHARTON |
YOAKUM |
$27,300 |
US0059 |
MMC - 646116001 |
01/23/2024 |
12/20/2023 |
LIME |
E.P.S.H., LLC($24,150) |
|
0027-08-182 |
FORT BEND |
HOUSTON |
$751,913 |
UA 90 |
C 27-8-182 |
01/04/2024 |
11/23/2023 |
ADVANCED TRAF MGT SYSTEM |
THIRD COAST SERVICES LLC($572,449) |
|
0156-12-020 |
WICHITA |
WICHITA FALLS |
$2,188,623 |
SS 447 |
F 2024(665) |
01/05/2024 |
08/25/2024 |
SURF/ROADWAY RESTOR |
ZACK BURKETT CO.($2,981,835) |
|
0156-12-020 |
WICHITA |
WICHITA FALLS |
$2,058,652 |
SS 447 |
F 2024(665) |
06/05/2024 |
11/24/2023 |
SURF/ROADWAY RESTOR |
ZACK BURKETT CO.($2,702,275) |
|
1137-02-042 |
CAMERON |
PHARR |
$8,427,358 |
SL 499 |
C 1137-2-42 |
01/04/2024 |
11/23/2023 |
PREVENT MAINT |
FOREMOST PAVING, INC.($7,765,565) |
|
1188-02-118 |
MIDLAND |
ODESSA |
$1,452,102 |
SL 250 |
C 1188-2-118 |
01/05/2024 |
11/24/2023 |
INTERS & OPERATIONAL IMPRVS |
REECE ALBERT, INC.($1,609,467) |
|
6459-07-001 |
BELL |
WACO |
$466,017 |
SL0363 |
RMC - 645907001 |
01/04/2024 |
11/22/2023 |
CLEANING AND SWEEPING HWYS |
PROFESSIONAL TRAFFIC CONTROL LLC($316,346) |
|
6453-97-001 |
SMITH |
TYLER |
$4,623,568 |
SL0323 |
RMC - 645397001 |
01/04/2024 |
11/29/2023 |
MILL AND INLAY |
BIG CREEK CONSTRUCTION, LTD.($4,469,287) |
|
6456-47-001 |
HARRIS |
HOUSTON |
$1,225,936 |
SL0008 |
RMC - 645647001 |
01/05/2024 |
11/21/2023 |
REFL PAVMT MRK (GRAPHICS) |
PROFESSIONAL TRAFFIC CONTROL LLC($1,085,390) |
|
6455-75-001 |
HARRIS |
HOUSTON |
$345,522 |
SL0008 |
RMC - 645575001 |
01/04/2024 |
11/21/2023 |
PUMP STATION & DRAINAGE SYSTEM CLEANING |
AIMS COMPANIES($292,130) |
|
6448-03-001 |
HARRIS |
HOUSTON |
$211,913 |
SL0008 |
RMC - 644803001 |
01/09/2024 |
11/30/2023 |
TREE TRIM AND BRUSH RMVL |
YELLOWSTONE LANDSCAPE - CENTRAL, INC.($311,570) |
|
0306-03-138 |
JEFFERSON |
BEAUMONT |
$5,853,728 |
SH 87 |
C 306-3-138 |
01/05/2024 |
11/24/2023 |
SURF/ROADWAY RESTOR |
SELECT MAINTENANCE, L.L.C.($6,555,483) |
|
0287-03-034 |
GONZALES |
YOAKUM |
$47,110,387 |
SH 80 |
C 287-3-34 |
01/04/2024 |
11/23/2023 |
WIDEN ROAD - ADD LANES |
HUNTER INDUSTRIES, LTD.($39,193,545) |
|
0284-02-027 |
THROCKMORTON |
WICHITA FALLS |
$6,978,676 |
SH 79 |
C 284-2-27 |
01/04/2024 |
11/23/2023 |
WIDEN ROAD - ADD SHOULDERS |
A. L. HELMCAMP, INC.($7,882,207) |
|
0266-02-070 |
COLORADO |
YOAKUM |
$8,619,380 |
SH 71 |
BR 2024(817) |
01/04/2024 |
11/23/2023 |
BRIDGE MAINT |
GIBSON & ASSOCIATES, INC.($8,899,649) |
|
0265-03-053 |
BASTROP |
AUSTIN |
$7,360,472 |
SH 71 |
C 265-3-53 |
01/05/2024 |
11/24/2023 |
RESURF ROADWAY |
LONE STAR PAVING COMPANY($6,520,251) |
|
0006-15-038 |
NOLAN |
ABILENE |
$5,536,142 |
SH 70 |
BR 2024(662) |
06/05/2024 |
11/24/2023 |
BRIDGE REPL |
HODGES AND SON CONSTRUCTION COMPANY, INC.($8,441,703) |
|
0248-01-082 |
TITUS |
ATLANTA |
$3,108,760 |
SH 49 |
F 2024(645) |
01/05/2024 |
11/24/2023 |
RESURF ROADWAY |
LONGVIEW BRIDGE AND ROAD, LTD.($2,881,430) |
|
0220-05-080 |
CAMERON |
PHARR |
$5,830,777 |
SH 48 |
STP 2024(690)HES |
01/05/2024 |
11/24/2023 |
INSTL RAISED MEDIAN |
IOC COMPANY LLC($4,549,749) |
|
0189-05-051 |
FRANKLIN |
PARIS |
$13,722,552 |
SH 37 |
C 189-5-51 |
01/05/2024 |
11/24/2023 |
PREVENT MAINT |
RK HALL, LLC($12,962,476) |
|
0693-01-034 |
HOWARD |
ABILENE |
$19,677,928 |
SH 350 |
C 693-1-34 |
01/04/2024 |
11/23/2023 |
RESURF ROADWAY |
CK NEWBERRY, LLC($17,873,873) |
|
0173-07-063 |
HUNT |
PARIS |
$5,222,921 |
SH 34 |
F 2024(637) |
01/04/2024 |
11/23/2023 |
PREVENT MAINT |
RK HALL, LLC($5,815,035) |
|
0142-06-029 |
KENDALL |
SAN ANTONIO |
$5,100,797 |
SH 27 |
C 142-6-29 |
01/04/2024 |
11/23/2023 |
REPAIR ROADWAY |
CLARK CONSTRUCTION OF TEXAS, INC.($3,751,988) |
|
0118-02-036 |
HOUSTON |
LUFKIN |
$13,754,375 |
SH 21 |
F 2024(613) |
01/05/2024 |
11/24/2023 |
WIDEN NON FREEWAY |
A. L. HELMCAMP, INC.($14,327,452) |
|
0002-02-059 |
EL PASO |
EL PASO |
$2,077,411 |
SH 20 |
STP 2024(606)HES |
01/05/2024 |
11/24/2023 |
HAZARD ELIM & SAFETY |
TRI STATE ELECTRIC, LTD.($2,290,249) |
|
0002-04-035 |
HUDSPETH |
EL PASO |
$3,760,934 |
SH 20 |
STP 2024(607)HES |
01/04/2024 |
11/23/2023 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($3,814,948) |
|
0108-03-044 |
HENDERSON |
TYLER |
$156,741 |
SH 19 |
STP 2024(630)HES |
01/04/2024 |
11/23/2023 |
HAZARD ELIM & SAFETY |
REYNOLDS & KAY, LTD.($178,439) |
|
0418-02-035 |
HILL |
WACO |
$12,006,392 |
SH 171 |
C 418-2-35 |
01/05/2024 |
11/24/2023 |
SURF/ROADWAY RESTOR |
TEXAS MATERIALS GROUP, INC.($8,755,570) |
|
0383-03-024 |
JIM WELLS |
CORPUS CHRISTI |
$26,689,441 |
SH 141 |
C 383-3-24 |
01/04/2024 |
11/23/2023 |
WIDEN ROAD - ADD LANES |
ANDERSON COLUMBIA CO., INC.($24,833,825) |
|
0366-04-027 |
WILSON |
SAN ANTONIO |
$42,571,905 |
SH 123 |
F 2024(696) |
01/05/2024 |
11/24/2023 |
SURF/ROADWAY RESTOR |
HUNTER INDUSTRIES, LTD.($39,483,858) |
|
0358-02-031 |
BREWSTER |
EL PASO |
$6,143,841 |
SH 118 |
C 358-2-31 |
01/04/2024 |
11/23/2023 |
SURF/ROADWAY RESTOR |
DAN WILLIAMS COMPANY($7,843,264) |
|
6462-39-001 |
NUECES |
CORPUS CHRISTI |
$293,680 |
SH0358 |
MMC - 646239001 |
01/16/2024 |
12/13/2023 |
HOT MIX |
COLORADO MATERIALS, LTD.($299,108) |
|
6460-71-001 |
NUECES |
CORPUS CHRISTI |
$642,750 |
SH0286 |
BPM - 646071001 |
01/04/2024 |
11/29/2023 |
BRIDGE DECK REPAIR |
SCR CIVIL CONSTRUCTION, LLC($283,911) |
|
6450-37-001 |
HARRIS |
HOUSTON |
$1,939,516 |
SH0249 |
RMC - 645037001 |
01/05/2024 |
11/21/2023 |
FULL DEPTH CONC REPAIR |
MC2 CIVIL, LLC($3,156,875) |
|
6388-99-001 |
WISE |
FORT WORTH |
$155,637 |
SH0114 |
BPM - 638899001 |
02/23/2024 |
01/05/2024 |
BRIDGE PREVENT MAINT |
SCOUT 5 CONSTRUCTION LLC($136,896) |
|
6451-69-001 |
WISE |
FORT WORTH |
$182,046 |
SH0114 |
BPM - 645169001 |
02/23/2024 |
01/08/2024 |
BRIDGE JOINT REPAIR |
STRUCTURAL INTEGRITY GROUP LLC($162,075) |
|
6460-81-001 |
FREESTONE |
BRYAN |
$228,148 |
SH0075 |
RMC - 646081001 |
01/09/2024 |
11/28/2023 |
MOW HWY RIGHT OF WAY |
SERNA CONTRACTORS, LLC($156,386) |
|
6461-07-001 |
COLORADO |
YOAKUM |
$242,500 |
SH0071 |
MMC - 646107001 |
01/23/2024 |
12/20/2023 |
HOT-MIX COLD-LAID |
QUALITY HOT MIX, INC.($220,000) |
|
6453-77-001 |
MARION |
ATLANTA |
$166,858 |
SH0049 |
RMC - 645377001 |
01/10/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY |
HX FARMS, INC.($149,206) |
|
6457-89-001 |
COMAL |
SAN ANTONIO |
$2,947,812 |
SH0046 |
RMC - 645789001 |
01/04/2024 |
11/27/2023 |
METAL BEAM GUARD FENCE REPAIR |
SHORT-LINE CORPORATION($1,996,311) |
|
6452-71-001 |
BELL |
WACO |
$663,698 |
SH0036 |
RMC - 645271001 |
01/04/2024 |
11/23/2023 |
MOW HWY RIGHT OF WAY |
T&L CLEANING SERVICES LLC($802,420) |
|
6462-10-001 |
BURLESON |
BRYAN |
$333,750 |
SH0036 |
RMC - 646210001 |
02/02/2024 |
12/08/2023 |
TREE RMVL |
ICOS MANAGEMENT, LLC($285,360) |
|
6462-74-001 |
AUSTIN |
YOAKUM |
$14,900 |
SH0036 |
RMC - 646274001 |
01/30/2024 |
01/02/2024 |
JANITORIAL MAINT |
MAXPRO ENTERPRISE LLC($13,120) |
|
6460-41-001 |
NAVARRO |
DALLAS |
$280,000 |
SH0031 |
MMC - 646041001 |
01/10/2024 |
11/15/2023 |
ASPH |
KNIFE RIVER CORPORATION - SOUTH($198,200) |
|
6455-97-001 |
NAVARRO |
DALLAS |
$169,719 |
SH0031 |
RMC - 645597001 |
01/10/2024 |
12/13/2023 |
SPECIALTY MRK |
STRIPE-A-ZONE, LLC($143,259) |
|
6408-87-001 |
BASTROP |
AUSTIN |
$664,579 |
SH0021 |
MMC - 640887001 |
01/05/2024 |
11/28/2023 |
LIMESTONE ROCK ASPH |
VULCAN CONSTRUCTION MATERIALS, LLC($563,840) |
|
6461-62-001 |
BRAZOS |
BRYAN |
$231,600 |
SH0006 |
MMC - 646162001 |
01/09/2024 |
11/29/2023 |
EMULSION |
MARTIN RESOURCE MANAGEMENT CORPORATION($230,840) |
|
6443-88-001 |
BOSQUE |
WACO |
$2,025,500 |
SH0006 |
MMC - 644388001 |
01/05/2024 |
11/24/2023 |
HOT MIX |
KNIFE RIVER CORPORATION - SOUTH($1,990,375) |
|
6460-93-001 |
BRAZOS |
BRYAN |
$248,100 |
SH0006 |
RMC - 646093001 |
01/10/2024 |
11/29/2023 |
RAISED PAVMT MARKERS |
PAVEMENT MARKINGS INC.($279,180) |
|
6460-95-001 |
BRAZOS |
BRYAN |
$405,077 |
SH0006 |
MMC - 646095001 |
01/04/2024 |
11/23/2023 |
HYDRAULIC CEMENT |
TOUCHSTONE RESOURCES, LLC($400,399) |
|
6459-09-001 |
BOSQUE |
WACO |
$111,240 |
SH0006 |
RMC - 645909001 |
01/09/2024 |
11/28/2023 |
CLEANING AND SWEEPING HWYS |
PROFESSIONAL TRAFFIC CONTROL LLC($97,379) |
|
6460-84-001 |
GRIMES |
BRYAN |
$297,369 |
SH0006 |
RMC - 646084001 |
01/09/2024 |
11/28/2023 |
MOW HWY RIGHT OF WAY |
P-VILLE, INCORPORATED($206,337) |
|
6461-67-001 |
COLLIN |
DALLAS |
$145,000 |
SH0005 |
MMC - 646167001 |
01/10/2024 |
12/13/2023 |
HYDRAULIC CEMENT |
AKA-MATERIALS($124,900) |
|
2718-01-015 |
TRAVIS |
AUSTIN |
$2,597,385 |
RM 2769 |
C 2718-1-15 |
01/04/2024 |
11/23/2023 |
RESURF ROADWAY |
TEXAS MATERIALS GROUP, INC.($2,979,803) |
|
1197-01-025 |
HAYS |
AUSTIN |
$1,094,477 |
RM 150 |
C 1197-1-25 |
01/04/2024 |
11/23/2023 |
PREVENT MAINT |
CLARK CONSTRUCTION OF TEXAS, INC.($1,083,996) |
|
6462-14-001 |
BEXAR |
SAN ANTONIO |
$204,111 |
MR0681 |
RMC - 646214001 |
01/17/2024 |
12/19/2023 |
MILL AND INLAY |
TEXAS MATERIALS GROUP, INC.($223,686) |
|
0092-02-135 |
DALLAS |
DALLAS |
$7,580,945 |
IH 45 |
F 2B23(093) |
01/04/2024 |
11/23/2023 |
FDCR, FLEX PAV REP, & BRIDGE SCOUR REP |
GIBSON & ASSOCIATES, INC.($7,294,651) |
|
0092-14-108 |
DALLAS |
DALLAS |
$3,433,160 |
IH 45 |
C 92-14-108 |
01/05/2024 |
11/24/2023 |
BRIDGE MAINT |
BECK-REIT & SONS, LTD.($3,175,651) |
|
0196-01-118 |
DENTON |
DALLAS |
$13,052,523 |
IH 35E |
C 196-1-118 |
01/05/2024 |
11/24/2023 |
REHAB EXIST ROADWAY |
AUSTIN BRIDGE & ROAD SERVICES, LP($14,210,384) |
|
0015-08-431 |
WILLIAMSON |
AUSTIN |
$6,485,398 |
IH 35 |
C 15-8-431 |
01/04/2024 |
11/23/2023 |
RESURF ROADWAY |
LONE STAR PAVING COMPANY($5,399,229) |
|
0017-06-086 |
FRIO |
SAN ANTONIO |
$13,607,256 |
IH 35 |
C 17-6-86 |
01/05/2024 |
11/24/2023 |
RESURF ROADWAY |
ANDERSON COLUMBIA CO., INC.($11,872,495) |
|
2121-02-178 |
EL PASO |
EL PASO |
$6,180,451 |
IH 10 |
F 2024(655) |
01/04/2024 |
11/23/2023 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($5,680,916) |
|
0508-02-129 |
CHAMBERS |
BEAUMONT |
$2,629,218 |
IH 10 |
C 508-2-129 |
01/04/2024 |
11/23/2023 |
REHAB EXIST ROADWAY |
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.($2,423,890) |
|
0003-01-064 |
CULBERSON |
EL PASO |
$27,260,465 |
IH 10 |
F 2024(654) |
01/05/2024 |
11/24/2023 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($29,566,262) |
|
6452-81-001 |
TARRANT |
FORT WORTH |
$943,275 |
IH0820 |
RMC - 645281001 |
01/04/2024 |
11/23/2023 |
REFLECTORIZED PAVMT MRK & MARKERS |
TRP CONSTRUCTION GROUP, LLC($924,963) |
|
6457-09-001 |
HARRIS |
HOUSTON |
$2,016,709 |
IH0069 |
RMC - 645709001 |
06/06/2024 |
11/22/2023 |
SWEEPING AND DEBRIS RMVL |
DIGG COMMERCIAL, LLC($1,690,158) |
|
6457-09-001 |
HARRIS |
HOUSTON |
$2,140,157 |
IH0069 |
RMC - 645709001 |
01/05/2024 |
08/25/2024 |
SWEEPING AND DEBRIS RMVL |
MBN ENTERPRISES LLC($1,835,440) |
|
6450-21-001 |
MONTGOMERY |
HOUSTON |
$1,750,100 |
IH0045 |
RMC - 645021001 |
01/04/2024 |
11/21/2023 |
SMALL SIGN REPL |
HAZMAT INTERNATIONAL, INC.($1,335,530) |
|
6460-31-001 |
MONTGOMERY |
HOUSTON |
$120,905 |
IH0045 |
MMC - 646031001 |
01/09/2024 |
11/30/2023 |
ASPHIC PATCHING MATERIAL |
WALLER COUNTY ASPHALT INC.($122,500) |
|
6457-37-001 |
MONTGOMERY |
HOUSTON |
$711,292 |
IH0045 |
RMC - 645737001 |
02/02/2024 |
11/21/2023 |
CLEANING AND SWEEPING HWYS |
PROFESSIONAL TRAFFIC CONTROL LLC($659,840) |
|
6461-68-001 |
ATASCOSA |
SAN ANTONIO |
$906,638 |
IH0037 |
RMC - 646168001 |
01/04/2024 |
11/27/2023 |
MOW HWY RIGHT OF WAY |
BK FIELD OPERATIONS LLC($716,884) |
|
6448-27-001 |
ELLIS |
DALLAS |
$382,668 |
IH0035E |
RMC - 644827001 |
01/04/2024 |
08/25/2024 |
VEGETATION MGT |
JASCO($483,430) |
|
6448-27-001 |
ELLIS |
DALLAS |
$382,668 |
IH0035E |
RMC - 644827001 |
03/05/2024 |
11/23/2023 |
VEGETATION MGT |
JASCO($339,430) |
|
6448-37-001 |
ELLIS |
DALLAS |
$1,750,650 |
IH0035E |
RMC - 644837001 |
01/05/2024 |
11/24/2023 |
MOW HWY RIGHT OF WAY |
CEN-TEX IRRIGATION SYSTEMS, INC.($1,257,421) |
|
6448-75-001 |
DENTON |
DALLAS |
$889,160 |
IH0035E |
RMC - 644875001 |
01/05/2024 |
11/30/2023 |
TRAF CONTROL SERVICES |
SUPERIOR TRAFFIC CONTROL, LLC($592,660) |
|
6418-67-001 |
DENTON |
DALLAS |
$141,968 |
IH0035 |
RMC - 641867001 |
03/12/2024 |
12/13/2023 |
RAISED PAVMT MARKERS |
BRYDL CONTRACTING, LLC($105,316) |
|
6461-69-001 |
FRIO |
SAN ANTONIO |
$936,244 |
IH0035 |
RMC - 646169001 |
01/05/2024 |
11/27/2023 |
MOW HWY RIGHT OF WAY |
R&M INCORPORATED($805,477) |
|
6456-25-001 |
DALLAS |
DALLAS |
$267,250 |
IH0030 |
RMC - 645625001 |
01/10/2024 |
11/30/2023 |
GRAFFITI RMVL |
FIREMAN EXCAVATING, INC.($184,105) |
|
6456-23-001 |
DALLAS |
DALLAS |
$570,050 |
IH0030 |
RMC - 645623001 |
01/05/2024 |
11/24/2023 |
DITCH CLEANING AND RESHAPING |
|
|
6456-22-001 |
DALLAS |
DALLAS |
$570,050 |
IH0030 |
RMC - 645622001 |
01/04/2024 |
11/23/2023 |
DITCH CLEANING AND RESHAPING |
|
|
6456-27-001 |
DALLAS |
DALLAS |
$287,250 |
IH0030 |
RMC - 645627001 |
01/10/2024 |
11/29/2023 |
GRAFFITI RMVL |
FIREMAN EXCAVATING, INC.($184,105) |
|
6431-72-001 |
DALLAS |
DALLAS |
$14,065,423 |
IH0030 |
RMC - 643172001 |
01/05/2024 |
11/15/2023 |
PERF BASE OPS & MNT OF HOV LANE & BARRIER TRANSFER |
LINDSAY CORPORATION($30,767,327) |
|
6453-91-001 |
BOWIE |
ATLANTA |
$156,636 |
IH0030 |
RMC - 645391001 |
01/10/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY |
PERRY WEST($164,880) |
|
6460-68-001 |
EASTLAND |
BROWNWOOD |
$967,885 |
IH0020 |
RMC - 646068001 |
01/04/2024 |
11/22/2023 |
METAL BEAM GUARD FENCE REPAIR |
ROSS SA ENTERPRISE LLC($724,423) |
|
6461-75-001 |
MIDLAND |
ODESSA |
$173,500 |
IH0020 |
RMC - 646175001 |
01/09/2024 |
12/14/2023 |
RAISED PAVMT MRK |
DOUBLE A CONTRACTING, L.P.($176,385) |
|
6462-35-001 |
ECTOR |
ODESSA |
$214,425 |
IH0020 |
RMC - 646235001 |
01/09/2024 |
12/14/2023 |
RAISED PAVMT MARKERS |
DOUBLE A CONTRACTING, L.P.($221,640) |
|
6457-41-001 |
CALLAHAN |
ABILENE |
$417,308 |
IH0020 |
RMC - 645741001 |
02/02/2024 |
11/27/2023 |
MOW HWY RIGHT OF WAY |
JOSE ERNESTO SALAZAR, LLC($391,555) |
|
6428-16-001 |
PECOS |
ODESSA |
$374,734 |
IH0010 |
RMC - 642816001 |
01/05/2024 |
12/04/2023 |
MISCELLANEOUS CONC REPAIR |
ICOS MANAGEMENT, LLC($525,714) |
|
6461-05-001 |
AUSTIN |
YOAKUM |
$247,500 |
IH0010 |
MMC - 646105001 |
01/23/2024 |
12/20/2023 |
HOT-MIX COLD-LAID |
QUALITY HOT MIX, INC.($227,500) |
|
3282-01-008 |
LEON |
BRYAN |
$681,780 |
FM 745 |
STP 2023(206)TAPS |
01/05/2024 |
11/24/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
GARRET SHIELDS INFRASTRUCTURE($783,652) |
|
0986-01-046 |
WILLIAMSON |
AUSTIN |
$1,318,264 |
FM 619 |
BR 2024(598) |
01/05/2024 |
11/24/2023 |
BRIDGE REPL |
AUSTIN ENGINEERING CO., INC.($1,365,940) |
|
1031-05-018 |
SHACKELFORD |
ABILENE |
$2,392,521 |
FM 576 |
BR 2024(663) |
01/05/2024 |
11/24/2023 |
BRIDGE REPL |
A GREATER AUSTIN DEVELOPMENT COMPANY, LLC($2,414,952) |
|
0976-03-109 |
GALVESTON |
HOUSTON |
$17,593,973 |
FM 518 |
CM 2023(589) |
01/04/2024 |
11/23/2023 |
HIKE AND/OR BIKE |
SER CONSTRUCTION PARTNERS, LLC($15,447,120) |
|
0523-02-051 |
WALLER |
HOUSTON |
$4,339,195 |
FM 362 |
C 523-2-51 |
01/05/2024 |
11/24/2023 |
BASE REPAIR, 1.5" PLANING, 1.5" ACP OVERLAY |
DURWOOD GREENE CONSTRUCTION CO.($4,087,472) |
|
6422-27-001 |
WALLER |
HOUSTON |
$645,641 |
FM3318 |
RMC - 642227001 |
01/04/2024 |
11/21/2023 |
ACP OVERLAY |
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.($598,559) |
|
3030-01-010 |
HILL |
WACO |
$12,787,432 |
FM 2959 |
C 3030-1-10 |
01/04/2024 |
11/23/2023 |
WIDEN ROAD - ADD SHOULDERS |
BIG CREEK CONSTRUCTION, LTD.($12,787,366) |
|
3210-01-020 |
HAYS |
AUSTIN |
$260,891 |
FM 2770 |
C 3210-1-20 |
01/05/2024 |
11/24/2023 |
RESURF ROADWAY |
DEAN WORD COMPANY, LTD.($294,472) |
|
2708-01-033 |
BEXAR |
SAN ANTONIO |
$1,023,900 |
FM 2696 |
STP 2024(534)HES |
01/04/2024 |
11/23/2023 |
HAZARD ELIM & SAFETY |
E-Z BEL CONSTRUCTION, LLC($778,577) |
|
2465-01-020 |
JOHNSON |
FORT WORTH |
$6,097,213 |
FM 2280 |
C 2465-1-20 |
03/05/2024 |
11/23/2023 |
RESURF ROADWAY |
PEACHTREE CONSTRUCTION, LTD.($6,362,225) |
|
1803-02-035 |
HIDALGO |
PHARR |
$8,538,203 |
FM 1925 |
F 2024(623) |
01/05/2024 |
11/24/2023 |
WIDEN ROAD - ADD LANES |
ASAGO, LLC($8,283,398) |
|
2189-01-020 |
SCURRY |
ABILENE |
$5,587,891 |
FM 1673 |
BR 2024(664) |
01/04/2024 |
11/23/2023 |
BRIDGE REPL |
HODGES AND SON CONSTRUCTION COMPANY, INC.($7,348,905) |
|
2150-04-087 |
WEBB |
LAREDO |
$696,597 |
FM 1472 |
STP 2024(702)HES |
01/05/2024 |
11/24/2023 |
INSTL TRAF SIGNAL |
TRAF-TEX, INC.($428,776) |
|
6425-90-001 |
FORT BEND |
HOUSTON |
$2,067,831 |
FM1236 |
RMC - 642590001 |
01/04/2024 |
11/21/2023 |
ASPH |
DURWOOD GREENE CONSTRUCTION CO.($1,894,291) |
|
6457-03-001 |
DENTON |
DALLAS |
$1,087,075 |
FM1171 |
RMC - 645703001 |
01/04/2024 |
11/29/2023 |
FULL DEPTH CONC REPAIR |
SILVER CREEK CONSTRUCTION, INC.($1,030,771) |
|
6462-03-001 |
ELLIS |
DALLAS |
$247,590 |
FM0876 |
MMC - 646203001 |
01/10/2024 |
12/13/2023 |
LIMESTONE ROCK ASPH |
VULCAN CONSTRUCTION MATERIALS, LLC($336,720) |
|
6462-05-001 |
ELLIS |
DALLAS |
$152,000 |
FM0876 |
MMC - 646205001 |
01/10/2024 |
12/13/2023 |
FLEXIBLE BASE |
KNIFE RIVER CORPORATION - SOUTH($108,500) |
|
6426-21-001 |
ELLIS |
DALLAS |
$247,590 |
FM0876 |
MMC - 642621001 |
01/10/2024 |
12/13/2023 |
LIMESTONE ROCK ASPH |
MARTIN MARIETTA MATERIALS, INC.($308,738) |
|
6460-50-001 |
KARNES |
CORPUS CHRISTI |
$1,194,405 |
FM0627 |
RMC - 646050001 |
01/04/2024 |
11/22/2023 |
ASPH PAVMT REPAIR |
J. CARROLL WEAVER, INC.($1,188,210) |
|
6453-75-001 |
UPSHUR |
ATLANTA |
$206,616 |
FM0556 |
RMC - 645375001 |
01/10/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY |
SERVIN MOWING($188,016) |
|
6459-43-001 |
GALVESTON |
HOUSTON |
$342,135 |
FM0518 |
RMC - 645943001 |
01/05/2024 |
11/21/2023 |
FULL DEPTH CONC REPAIR |
ISI CONTRACTING, INC.($394,005) |
|
6448-79-001 |
DENTON |
DALLAS |
$1,401,159 |
FM0407 |
RMC - 644879001 |
01/05/2024 |
11/29/2023 |
FULL DEPTH CONC REPAIR |
TALBERT COMPANIES LLC($1,304,451) |
|
6448-77-001 |
DENTON |
DALLAS |
$221,150 |
FM0407 |
BPM - 644877001 |
01/10/2024 |
12/01/2023 |
RMVL AND DISPOSAL OF DRIFTWOOD |
SHALOM SERVICES CORPORATION($194,080) |
|
6453-79-001 |
CASS |
ATLANTA |
$227,924 |
FM0251 |
RMC - 645379001 |
01/10/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY |
HX FARMS, INC.($227,204) |
|
6453-73-001 |
MORRIS |
ATLANTA |
$188,632 |
FM0161 |
RMC - 645373001 |
01/10/2024 |
11/29/2023 |
MOW HWY RIGHT OF WAY |
TERRY ENTERPRISES($193,596) |
|
6462-70-001 |
WHARTON |
YOAKUM |
$18,380 |
FM0102 |
RMC - 646270001 |
01/30/2024 |
01/02/2024 |
JANITORIAL MAINT |
RWCS JANITORIAL LLC($16,450) |
|
6460-80-001 |
BURLESON |
BRYAN |
$237,443 |
FM0060 |
RMC - 646080001 |
01/08/2024 |
11/28/2023 |
MOW HWY RIGHT OF WAY |
ABESCAPE LANDSCAPING, LLC($176,623) |
|
0905-06-126 |
LUBBOCK |
LUBBOCK |
$250,922 |
CS |
BR 2024(658) |
01/04/2024 |
11/23/2023 |
REHAB BRIDGE |
DIGG COMMERCIAL, LLC($267,401) |
|
0905-06-095 |
LUBBOCK |
LUBBOCK |
$17,487,978 |
CS |
STP 2019(518)MM |
02/02/2024 |
11/24/2023 |
WIDEN ROAD - ADD LANES |
LONE STAR DIRT & PAVING, LTD.($19,074,047) |