0366-05-048 |
WILSON |
SAN ANTONIO |
$13,266,755 |
SH 123 |
NH 2020(616) |
03/05/2020 |
11/15/2023 |
CONSTR NB PASSING LNS; BASE REPAIR, SC & OVERLAY |
ANGEL BROTHERS HOLDINGS CORP.($12,527,098) |
|
0015-08-140 |
WILLIAMSON |
AUSTIN |
$7,792,810 |
IH 35 |
NH 1802(398) |
07/11/2018 |
11/15/2023 |
STRCT, GRADING, HMACP |
CAPITAL EXCAVATION COMPANY($6,748,949) |
|
0337-01-043 |
WILLIAMSON |
AUSTIN |
$5,536,145 |
SH 29 |
NH 2020(759) |
08/06/2020 |
11/15/2023 |
HWY IMPRV |
DAN WILLIAMS COMPANY($5,548,288) |
|
1200-01-023 |
WILLIAMSON |
AUSTIN |
$4,671,890 |
FM 1660 |
STP 2017(949) |
04/05/2017 |
11/15/2023 |
REHAB RDWY |
HUNTER INDUSTRIES, LTD.($4,076,992) |
|
2211-01-026 |
WILLIAMSON |
AUSTIN |
$8,296,923 |
RM 2338 |
STP 2021(620)HES |
06/03/2021 |
11/15/2023 |
CONSTRUCT BRIDGE |
J.D. ABRAMS, L.P.($7,570,068) |
|
0015-08-142 |
WILLIAMSON |
AUSTIN |
$14,305,404 |
IH 35 |
NH 2019(605) |
01/09/2019 |
11/15/2023 |
GRADING, BASE, HMACP, PVMRK & SIGNS |
DAN WILLIAMS COMPANY($13,145,763) |
|
0015-08-147 |
WILLIAMSON |
AUSTIN |
$60,342,307 |
IH 35 |
NH 2020(185) |
07/08/2020 |
11/15/2023 |
INTERCHANGE (NEW OR RECONED) |
J.D. ABRAMS, L.P.($61,721,948) |
|
0015-09-193 |
WILLIAMSON |
AUSTIN |
$10,555,578 |
IH 35 |
NH 2019(747) |
04/02/2019 |
11/15/2023 |
GR,BASE,HMACP,SIGNS & PVMT MRKS |
JORDAN FOSTER CONSTRUCTION, LLC($10,705,999) |
|
0320-03-099 |
WILLIAMSON |
AUSTIN |
$829,418 |
SH 95 |
BR 2018(820) |
05/02/2018 |
11/15/2023 |
REPLACE DECK AND STRUCTURAL REPAIRS |
DAN WILLIAMS COMPANY($1,149,643) |
|
1378-02-053 |
WILLIAMSON |
AUSTIN |
$973,635 |
RM 1431 |
NH 2018(600) |
05/01/2018 |
11/15/2023 |
INSTL OF A SOUND WALL ALONG THE N ROW LINE |
SB CONTRACTORS LLC($829,476) |
|
0440-01-042 |
WILLIAMSON |
AUSTIN |
$6,825,458 |
SH 138 |
STP 2019(506) |
02/05/2019 |
11/15/2023 |
ADD SHOULDERS AND REHAB ROADWAY |
TTG UTILITIES, LP($7,208,328) |
|
0015-08-141 |
WILLIAMSON |
AUSTIN |
$15,646,512 |
IH 35 |
NH 2019(683) |
03/06/2019 |
11/15/2023 |
REPLACE BRIDGE OVERPASS AND TIE-IN APPROACHES |
DAN WILLIAMS COMPANY($15,048,230) |
|
1566-02-019 |
WILLIAMSON |
AUSTIN |
$8,857,967 |
FM 1660 |
C 1566-2-19 |
08/07/2018 |
11/15/2023 |
REHAB RDWY |
JORDAN FOSTER CONSTRUCTION, LLC($8,947,810) |
|
0015-09-194 |
WILLIAMSON |
AUSTIN |
$8,402,902 |
IH 35 |
F 2021(948) |
08/04/2021 |
11/15/2023 |
HWY IMPRV |
J.D. ABRAMS, L.P.($9,323,423) |
|
1202-01-018 |
WILLIAMSON |
AUSTIN |
$3,557,125 |
FM 972 |
STP 1702(334) |
06/07/2017 |
11/15/2023 |
REHAB PAVMT, ADD SHOULDERS & SAFETY TREAT |
DAN WILLIAMS COMPANY($3,320,331) |
|
2690-01-036 |
WILLIAMSON |
AUSTIN |
$8,755,739 |
FM 971 |
STP 2021(366) |
02/04/2021 |
11/15/2023 |
ADDING SHOULDERS WITH NO ADDED CAPACITY |
JORDAN FOSTER CONSTRUCTION, LLC($8,428,385) |
|
2690-01-037 |
WILLIAMSON |
AUSTIN |
$3,847,767 |
FM 971 |
CC 2690-1-37 |
06/04/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
CHASCO CONSTRUCTORS($4,059,995) |
|
2690-01-038 |
WILLIAMSON |
AUSTIN |
$4,292,945 |
FM 971 |
C 2690-1-38 |
02/02/2023 |
11/15/2023 |
ADDING SHOULDERS WITH NO ADDED CAPACITY |
JORDAN FOSTER CONSTRUCTION, LLC($4,469,902) |
|
1202-01-020 |
WILLIAMSON |
AUSTIN |
$9,601,491 |
FM 972 |
C 1202-1-20 |
06/06/2018 |
11/15/2023 |
REHAB ADD SHOULDER AND SAFETY TREAT |
DAN WILLIAMS COMPANY($8,984,216) |
|
0683-01-056 |
WILLIAMSON |
AUSTIN |
$26,803,522 |
RM 620 |
NH 2019(996) |
08/06/2019 |
11/15/2023 |
INTERS & OPERATIONAL IMPRVS |
BRIDGES AND ROADS, LLC($27,468,704) |
|
0683-04-022 |
TRAVIS |
AUSTIN |
$14,520,825 |
RM 3238 |
F 2021(619) |
06/03/2021 |
11/15/2023 |
REHAB EXIST ROADWAY |
HUNTER INDUSTRIES, LTD.($15,859,607) |
|
3136-01-015 |
TRAVIS |
AUSTIN |
$46,763,002 |
SL 1 |
NH 1702(792) |
08/08/2017 |
11/15/2023 |
GRADE SEPARATION OF MAIN LANES |
WEBBER, LLC($53,513,432) |
|
1186-01-091 |
TRAVIS |
AUSTIN |
$9,593,311 |
FM 969 |
PTF 2022(045) |
09/02/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
DAN WILLIAMS COMPANY($8,953,610) |
|
0152-01-080 |
TRAVIS |
AUSTIN |
$3,169,832 |
US 183 |
CC 152-1-80 |
05/05/2021 |
11/15/2023 |
INTERS IMPRVS WITH RIGHT AND/OR LEFT T |
COX COMMERCIAL CONSTRUCTION LLC($2,851,509) |
|
0113-13-166 |
TRAVIS |
AUSTIN |
$70,407,210 |
SL 360 |
F 2022(160) |
12/01/2021 |
11/15/2023 |
CONSTRUCT BRIDGE |
COPASA INC($72,138,916) |
|
2100-01-054 |
TRAVIS |
AUSTIN |
$20,429,914 |
RM 2222 |
NH 1802(401) |
07/11/2018 |
11/15/2023 |
RECON 4-LN ROADWAY TO 6-LN DIVIDED_ROADWAY |
CAPITAL EXCAVATION COMPANY($23,618,553) |
|
0015-10-071 |
TRAVIS |
AUSTIN |
$4,256,955 |
IH 35 |
F 2021(681) |
08/04/2021 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
DBI SERVICES, LLC($2,895,230) |
|
0265-02-036 |
TRAVIS |
AUSTIN |
$50,709,809 |
SH 71 |
C 265-2-36 |
09/03/2020 |
11/15/2023 |
CONSTRUCT 4-LANE OVERPASSES AT ROSS RD AND KELLAM |
ZACHRY CONSTRUCTION CORPORATION($61,227,248) |
|
3136-01-200 |
TRAVIS |
AUSTIN |
$3,915,005 |
SL 1 |
F 2024(152) |
10/05/2023 |
11/15/2023 |
DRAINAGE IMPRVS |
AUSTIN UNDERGROUND INCORPORATED($4,337,215) |
|
0440-06-018 |
TRAVIS |
AUSTIN |
$70,540,747 |
SH 130 |
CC 440-6-18 |
06/06/2018 |
11/15/2023 |
ADD ONE LANE IN EACH DIRECTION |
WEBBER, LLC($69,910,317) |
|
1186-01-090 |
TRAVIS |
AUSTIN |
$9,451,929 |
FM 969 |
PTF 2017(143) |
01/04/2017 |
11/15/2023 |
REHAB ROADWAY & ADD TWLTL & SHOULDERS |
AARON CONCRETE CONTRACTORS, L.P.($6,648,304) |
|
1200-03-060 |
TRAVIS |
AUSTIN |
$18,921,417 |
FM 973 |
STP 2022(819)HES |
03/08/2023 |
08/21/2024 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($22,834,261) |
|
0015-10-063 |
TRAVIS |
AUSTIN |
$8,794,190 |
IH 35 |
NH 2020(754) |
04/09/2020 |
11/15/2023 |
REVERSE NB RAMPS & ADD 1 AUXILIARY LANE |
JORDAN FOSTER CONSTRUCTION, LLC($8,674,931) |
|
0440-06-017 |
TRAVIS |
AUSTIN |
$39,118,063 |
SH 130 |
CC 440-6-17 |
12/06/2017 |
11/15/2023 |
ADD ONE LANE IN EACH DIRECTION |
OHL USA, INC.($36,726,431) |
|
2689-01-023 |
TRAVIS |
AUSTIN |
$10,214,980 |
FM 2304 |
STP 1902(245)MM |
08/06/2019 |
11/15/2023 |
RECON EXIST 2LN RDWY TO 4 LN DIVIDED W/CLTL |
DAN WILLIAMS COMPANY($12,151,984) |
|
3417-03-021 |
TRAVIS |
AUSTIN |
$5,259,192 |
FM 734 |
F 2023(337) |
12/01/2022 |
09/24/2024 |
RECON EXIST ROADWAY |
AARON CONCRETE CONTRACTORS, L.P.($5,597,210) |
|
0015-13-396 |
TRAVIS |
AUSTIN |
$22,225,185 |
IH 35 |
NH 2018(907) |
04/02/2019 |
11/15/2023 |
GR, BASE, STRUCT, HMACP & PVMT MKS |
JAMES CONSTRUCTION GROUP, L.L.C.($24,590,929) |
|
2520-01-016 |
MEDINA |
SAN ANTONIO |
$5,610,799 |
FM 2200 |
STP 2023(528)HES |
03/08/2023 |
08/21/2024 |
BRIDGE REPL |
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.($6,206,529) |
|
0483-02-021 |
MCMULLEN |
SAN ANTONIO |
$29,289,402 |
SH 72 |
STP 2018(077) |
09/06/2018 |
11/15/2023 |
GRADE, BASE, SURF, PAVMT MRK |
HUNTER INDUSTRIES, LTD.($30,553,965) |
|
0150-04-048 |
LLANO |
AUSTIN |
$5,808,874 |
SH 29 |
C 150-4-48 |
01/08/2021 |
11/15/2023 |
CONSTRUCT NEW ROADWAY LANES |
ACME BRIDGE COMPANY, INC.($5,448,732) |
|
2687-01-013 |
LLANO |
AUSTIN |
$2,269,533 |
RM 2147 |
STP 2020(376) |
12/04/2019 |
11/15/2023 |
CONSTRUCT LEFT TURN LANES AND RESURF |
ANGEL BROTHERS HOLDINGS CORP.($2,394,881) |
|
0142-15-026 |
KENDALL |
SAN ANTONIO |
$11,445,737 |
IH 10 |
NH 2019(788) |
07/09/2019 |
09/27/2024 |
GRAD, BASE, SURF, STR, PAV'T MRKMT |
HUNTER INDUSTRIES, LTD.($12,602,402) |
|
0691-01-042 |
KARNES |
CORPUS CHRISTI |
$9,269,755 |
FM 81 |
STP 2019(463) |
01/08/2019 |
11/15/2023 |
REHAB AND WIDEN ROADWAY |
RAY FARIS, INC.($7,894,058) |
|
0691-01-040 |
KARNES |
CORPUS CHRISTI |
$7,903,696 |
FM 81 |
F 2021(753) |
07/01/2021 |
11/15/2023 |
ROADWAY REHAB/RECON WITH NO ADDE |
CK NEWBERRY, LLC($7,699,689) |
|
0016-03-103 |
HAYS |
AUSTIN |
$33,976,081 |
IH 35 |
NH 1802(535) |
08/07/2018 |
11/15/2023 |
REPLACE BRIDGE & APPROACHES |
WEBBER, LLC($31,736,977) |
|
0987-03-012 |
HAYS |
AUSTIN |
$3,558,837 |
FM 621 |
STP 2021(806)MM |
08/04/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
HUNTER INDUSTRIES, LTD.($2,961,992) |
|
1776-01-036 |
HAYS |
AUSTIN |
$6,740,121 |
RM 967 |
STP 2021(808)HES |
08/05/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
HUNTER INDUSTRIES, LTD.($6,598,036) |
|
3545-02-007 |
HAYS |
AUSTIN |
$16,636,059 |
FM 110 |
CC 3545-2-7 |
07/10/2019 |
09/27/2024 |
CONSTRUCT NEW ROAD |
HUNTER INDUSTRIES, LTD.($16,235,482) |
|
0016-16-028 |
HAYS |
AUSTIN |
$8,491,533 |
RM 967 |
F 2022(466) |
04/04/2023 |
09/24/2024 |
REHAB EXIST ROADWAY |
HUNTER INDUSTRIES, LTD.($8,474,686) |
|
3545-02-008 |
HAYS |
AUSTIN |
$19,750,688 |
FM 110 |
CC 3545-2-8 |
03/04/2020 |
11/15/2023 |
CONSTRUCT TWO LANES AND SHOULDERS |
JAMES CONSTRUCTION GROUP, L.L.C.($14,699,792) |
|
0471-02-070 |
HAYS |
AUSTIN |
$17,722,518 |
SH 21 |
NH 1902(251) |
03/05/2020 |
11/15/2023 |
PROVIDE SUPER 2 PASSING LANES |
HUNTER INDUSTRIES, LTD.($17,392,024) |
|
0016-02-152 |
HAYS |
AUSTIN |
$23,384,139 |
IH 35 |
NH 2020(463) |
04/08/2020 |
11/15/2023 |
FREEWAY OPERATIONAL IMPRVS |
HUNTER INDUSTRIES, LTD.($21,992,737) |
|
3545-02-010 |
HAYS |
AUSTIN |
$7,098,810 |
FM 110 |
STP 2020(761) |
04/09/2020 |
11/15/2023 |
CONSTRUCT OVERPASS |
HUNTER INDUSTRIES, LTD.($5,882,254) |
|
0016-02-149 |
HAYS |
AUSTIN |
$14,192,050 |
IH 35 |
NH 2020(853) |
07/08/2020 |
11/15/2023 |
FREEWAY OPERATIONAL IMPRVS |
HUNTER INDUSTRIES, LTD.($14,020,542) |
|
1776-02-019 |
HAYS |
AUSTIN |
$6,720,271 |
FM 2001 |
C 1776-2-19 |
03/05/2021 |
11/15/2023 |
CONSTRUCT NEW ROADWAY LANES |
HUNTER INDUSTRIES, LTD.($5,959,526) |
|
0914-33-068 |
HAYS |
AUSTIN |
$21,369,599 |
CR |
C 914-33-68 |
06/04/2021 |
11/15/2023 |
CONSTRUCT NEW ROAD |
J3 COMPANY, LLC($17,724,256) |
|
0366-03-068 |
GUADALUPE |
SAN ANTONIO |
$24,136,511 |
SH 123 |
NH 1902(063) |
06/04/2019 |
11/15/2023 |
REHAB AND WIDEN TO ADD SHOULDERS |
HUNTER INDUSTRIES, LTD.($24,608,309) |
|
0025-10-092 |
GUADALUPE |
SAN ANTONIO |
$7,755,982 |
FM 78 |
STP 2019(171) |
11/07/2018 |
11/15/2023 |
SURF & PAVMT MRK |
HUNTER INDUSTRIES, LTD.($7,321,503) |
|
0025-03-097 |
GUADALUPE |
SAN ANTONIO |
$140,726,612 |
IH 10 |
F 2022(097) |
11/03/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
WEBBER, LLC($125,021,001) |
|
0215-09-035 |
GUADALUPE |
SAN ANTONIO |
$12,891,468 |
FM 725 |
F 2021(675) |
07/01/2021 |
11/15/2023 |
WIDEN ROAD - ADD SHOULDERS |
HUNTER INDUSTRIES, LTD.($10,378,166) |
|
0287-03-034 |
GONZALES |
YOAKUM |
$47,110,387 |
SH 80 |
C 287-3-34 |
01/04/2024 |
11/23/2023 |
WIDEN ROAD - ADD LANES |
HUNTER INDUSTRIES, LTD.($39,193,545) |
|
2552-01-058 |
EL PASO |
EL PASO |
$16,799,428 |
SL 375 |
STP 1902(114)HES |
07/10/2019 |
09/27/2024 |
REHAB OF EXIST ROAD |
J. A. R. CONCRETE, INC.($13,858,443) |
|
1046-01-030 |
EL PASO |
EL PASO |
$10,688,776 |
FM 659 |
NH 1802(573) |
08/07/2018 |
11/15/2023 |
OPERATIONAL IMPRVS |
LESNA CONSTRUCTION, INC.($12,904,066) |
|
0924-06-533 |
EL PASO |
EL PASO |
$1,454,157 |
VA |
NH 1702(500) |
07/12/2017 |
11/15/2023 |
VEGETATION LANDSCAPE |
ALLIED PAVING CO.($1,330,984) |
|
2121-04-114 |
EL PASO |
EL PASO |
$17,988,823 |
IH 10 |
CBI 2021(797) |
08/04/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
INTERNATIONAL EAGLE ENTERPRISES, INC.($18,039,541) |
|
0665-02-002 |
EL PASO |
EL PASO |
$20,980,783 |
SS 320 |
F 2023(613) |
04/04/2023 |
08/22/2024 |
CONSTRUCT FRONTAGE ROADS |
JORDAN FOSTER CONSTRUCTION, LLC($17,835,786) |
|
3592-01-009 |
EL PASO |
EL PASO |
$220,055,591 |
SH 178 |
F 2B24(273) |
07/09/2024 |
05/28/2024 |
INFRASTRUCT IMPRVS |
SUNDT CONSTRUCTION, INC.($243,747,771) |
|
2121-01-104 |
EL PASO |
EL PASO |
$115,716,761 |
IH 10 |
F 2B24(096) |
05/03/2024 |
03/22/2024 |
CONSTRUCT NEW ROAD |
SUNDT CONSTRUCTION, INC.($119,997,852) |
|
2121-03-060 |
EL PASO |
EL PASO |
$10,960,314 |
IH 10 |
C 2121-3-60 |
06/05/2020 |
11/15/2023 |
CONSTRUCT ASPH CONC PVMNT MILL AND INLAY |
DAN WILLIAMS COMPANY($9,796,784) |
|
2552-03-049 |
EL PASO |
EL PASO |
$72,014,802 |
SL 375 |
NH 2013(875) |
07/08/2020 |
11/15/2023 |
WIDEN FROM 4 TO 6 LANES DIVIDED |
J.D. ABRAMS, L.P.($75,428,369) |
|
0374-02-097 |
EL PASO |
EL PASO |
$129,137,745 |
US 62 |
NH 2019(063) |
10/03/2018 |
11/15/2023 |
BUILD FRONTAGE ROADS AND MAINLANES |
JORDAN FOSTER CONSTRUCTION, LLC($144,207,911) |
|
2552-03-058 |
EL PASO |
EL PASO |
$30,216,719 |
SL 375 |
NH 1802(575) |
10/03/2018 |
11/15/2023 |
LP 375 RAMPS & FRONTAGE ROADS |
JORDAN FOSTER CONSTRUCTION, LLC($32,640,631) |
|
0001-02-055 |
EL PASO |
EL PASO |
$12,898,155 |
SH 20 |
NH 2019(781) |
11/06/2019 |
11/15/2023 |
REHAB OF EXIST ROAD |
J. A. R. CONCRETE, INC.($11,457,248) |
|
2121-01-091 |
EL PASO |
EL PASO |
$7,890,471 |
IH 10 |
CM 2018(087) |
12/06/2017 |
11/15/2023 |
REHAB AND OPERATIONAL IMPRVS |
INTERNATIONAL EAGLE ENTERPRISES, INC.($7,550,372) |
|
1046-01-032 |
EL PASO |
EL PASO |
$15,476,726 |
FM 659 |
F 2021(695) |
07/02/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
J.D. ABRAMS, L.P.($14,610,296) |
|
2121-03-160 |
EL PASO |
EL PASO |
$9,183,649 |
IH 10 |
STP 1802(574)MM |
08/08/2018 |
11/15/2023 |
RAMP AND INTERS IMPRVS |
J.D. ABRAMS, L.P.($9,358,403) |
|
2121-02-150 |
EL PASO |
EL PASO |
$27,267,381 |
IH 10 |
NH 1702(501) |
07/12/2017 |
11/15/2023 |
INTERCHANGE IMPRVS |
DAN WILLIAMS COMPANY($25,376,264) |
|
0924-06-689 |
EL PASO |
EL PASO |
$673,042 |
VA |
C 924-6-689 |
06/28/2023 |
11/15/2023 |
LANDSCAPE DEVELOPMENT |
INTERNATIONAL EAGLE ENTERPRISES, INC.($832,138) |
|
2121-02-174 |
EL PASO |
EL PASO |
$2,526,198 |
IH 10 |
C 2121-2-174 |
12/02/2020 |
11/15/2023 |
INSTL OF CONC TRAF BARRIER |
J. A. R. CONCRETE, INC.($2,186,645) |
|
0167-01-117 |
EL PASO |
EL PASO |
$1,849,005 |
US 54 |
STP 2B20(101)HES |
12/03/2020 |
11/15/2023 |
MODIFY EXIST RAMPS, SIGNING & PAVMT MRK |
SYNERGY PROJECT CONTRACTORS, INC.($1,650,011) |
|
3451-01-040 |
EL PASO |
EL PASO |
$34,696,221 |
FM 1281 |
F 2023(991) |
06/27/2023 |
11/15/2023 |
INTERS IMPRV |
JORDAN FOSTER CONSTRUCTION, LLC($36,413,140) |
|
2552-04-046 |
EL PASO |
EL PASO |
$5,239,157 |
SL 375 |
C 2552-4-46 |
07/02/2021 |
11/15/2023 |
SURF/ROADWAY RESTOR |
J. A. R. CONCRETE, INC.($3,878,272) |
|
2121-01-094 |
EL PASO |
EL PASO |
$181,874,297 |
IH 10 |
F 2022(053) |
02/04/2022 |
11/15/2023 |
CONSTRUCT NEW ROAD |
SUNDT CONSTRUCTION, INC.($174,305,265) |
|
2121-01-094 |
EL PASO |
EL PASO |
$192,755,434 |
IH 10 |
F 2022(053) |
10/08/2021 |
11/15/2023 |
CONSTRUCT NEW ROAD |
JORDAN FOSTER CONSTRUCTION, LLC($246,687,523) |
|
2552-02-028 |
EL PASO |
EL PASO |
$102,649,005 |
SL 375 |
NH 2019(168) |
05/04/2022 |
08/31/2024 |
CONSTRUCT NEW ROAD |
JORDAN FOSTER CONSTRUCTION, LLC($137,955,531) |
|
2121-03-154 |
EL PASO |
EL PASO |
$14,879,367 |
IH 10 |
CM 1702(689) |
08/08/2017 |
11/15/2023 |
RAMP IMPRVS |
LESNA CONSTRUCTION, INC.($16,837,592) |
|
0167-01-095 |
EL PASO |
EL PASO |
$35,832,998 |
US 54 |
STP 1702(687)MM |
08/08/2017 |
11/15/2023 |
WIDEN BY ADDING TWO INSIDE LANES, ETC. |
DAN WILLIAMS COMPANY($33,676,149) |
|
0215-01-044 |
COMAL |
SAN ANTONIO |
$60,014,958 |
SH 46 |
F 2022(901) |
06/30/2022 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
WEBBER, LLC($59,488,630) |
|
0016-05-120 |
COMAL |
SAN ANTONIO |
$5,591,576 |
IH 35 |
C 16-5-120 |
06/04/2021 |
11/15/2023 |
HWY IMPRV |
ANGEL BROTHERS HOLDINGS CORP.($5,145,675) |
|
1433-02-044 |
COMAL |
SAN ANTONIO |
$49,187,382 |
FM 2252 |
STP 2023(675)MM |
05/04/2023 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
HARPER BROTHERS CONSTRUCTION LLC($48,503,887) |
|
0016-04-117 |
COMAL |
SAN ANTONIO |
$80,245,982 |
IH 35 |
NH 1902(057) |
06/04/2019 |
11/15/2023 |
FREEWAY OPERATIONAL IMPRVS |
WEBBER, LLC($73,245,147) |
|
3212-05-013 |
COMAL |
SAN ANTONIO |
$15,685,045 |
FM 3351 |
STP 2024(729)MM |
02/02/2024 |
12/22/2023 |
BRIDGE REPL |
DAN WILLIAMS COMPANY($12,558,078) |
|
8408-15-006 |
COMAL |
SAN ANTONIO |
$4,568,464 |
MH |
BR 2019(910) |
05/08/2019 |
11/15/2023 |
REHAB BRIDGE & APPROACHES |
CAPITAL EXCAVATION COMPANY($4,518,896) |
|
0016-05-115 |
COMAL |
SAN ANTONIO |
$7,795,703 |
IH 35 |
NH 2017(797) |
03/07/2017 |
11/15/2023 |
REPLACE EXIST BRIDGE, CONSTRUCT NEW TURNAROUNDS |
ANDERSON COLUMBIA CO., INC.($7,256,065) |
|
1268-01-013 |
COMAL |
SAN ANTONIO |
$40,975,029 |
FM 1103 |
C 1268-1-13 |
06/04/2021 |
11/15/2023 |
EXPAND 2 TO 4 LN W/MEDIANS, TRN LNS, SDWK & BK LNS |
HUNTER INDUSTRIES, LTD.($39,295,624) |
|
0016-05-119 |
COMAL |
SAN ANTONIO |
$28,477,165 |
IH 35 |
NH 2019(507) |
02/06/2019 |
11/15/2023 |
GRADING, STRUCTS, BASE & SURF |
BRIDGES AND ROADS, LLC($25,398,551) |
|
1349-03-013 |
BURNET |
AUSTIN |
$5,695,841 |
RM 1174 |
C 1349-3-13 |
08/08/2018 |
11/15/2023 |
PROVIDE ADDITIONAL PAVED SURF |
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.($6,179,469) |
|
0252-02-060 |
BURNET |
AUSTIN |
$5,145,702 |
US 281 |
STP 2B20(128)HES |
08/06/2020 |
11/15/2023 |
HWY IMPRV |
BIG CREEK CONSTRUCTION, LTD.($4,562,497) |
|
0252-02-054 |
BURNET |
AUSTIN |
$7,417,179 |
US 281 |
NH 1802(537) |
08/07/2018 |
11/15/2023 |
ADD CENTER LEFT TURN LANE AND SHOULDERS |
JORDAN FOSTER CONSTRUCTION, LLC($7,365,015) |
|
0521-05-148 |
BEXAR |
SAN ANTONIO |
$23,897,567 |
IH 410 |
STP 2021(486)MM |
04/08/2021 |
11/15/2023 |
SURF/ROADWAY RESTOR |
AUSTIN BRIDGE & ROAD SERVICES, LP($22,297,586) |
|
2230-01-016 |
BEXAR |
SAN ANTONIO |
$1,544,303 |
FM 1560 |
STP 2017(477) |
01/05/2017 |
11/15/2023 |
REPLACE EXIST CULVERT WITH BRIDGE |
DAN WILLIAMS COMPANY($1,447,520) |
|
1477-01-040 |
BEXAR |
SAN ANTONIO |
$7,956,899 |
FM 1516 |
STP 2017(798)MM |
03/08/2017 |
11/15/2023 |
EXPAND 2 TO 4 LNS W/ LTL, SW, BK LN & EXTEND RDWY |
CAPITAL EXCAVATION COMPANY($7,388,906) |
|
0915-00-178 |
BEXAR |
SAN ANTONIO |
$3,928,875 |
VA |
STP 1702(555) |
07/12/2017 |
11/15/2023 |
CONSTRUCT CURB RAMPS_(VARIOUS LOC IN BEXAR CO) |
F. D. CONCRETE, LLC($3,495,290) |
|
2452-02-119 |
BEXAR |
SAN ANTONIO |
$7,205,067 |
SL 1604 |
NH 2018(870) |
06/05/2018 |
11/15/2023 |
INTERS OP IMPROV - CONST 4 TURNAROUNDS |
CAPITAL EXCAVATION COMPANY($6,253,995) |
|
1479-01-024 |
BEXAR |
SAN ANTONIO |
$38,335,030 |
SL 1604 |
STP 2018(972) |
06/06/2018 |
11/15/2023 |
EXPAND FROM 2 LANES TO 4 LANES DIVIDED |
HARPER BROTHERS CONSTRUCTION LLC($40,398,632) |
|
0072-07-070 |
BEXAR |
SAN ANTONIO |
$36,185,518 |
IH 10 |
NH 1802(387) |
07/10/2018 |
11/15/2023 |
GRAD, BASE, STRUCT, PAVMT MRK |
J3 COMPANY, LLC($37,255,989) |
|
2230-01-013 |
BEXAR |
SAN ANTONIO |
$16,562,969 |
FM 1560 |
STP 1802(618) |
08/08/2018 |
11/15/2023 |
GRAD, STR, BASE, SURF |
DAN WILLIAMS COMPANY($17,810,211) |
|
0143-01-055 |
BEXAR |
SAN ANTONIO |
$3,422,190 |
US 87 |
NH 2019(036) |
09/07/2018 |
11/15/2023 |
RESTORE EXIST ROADWAY |
JORDAN FOSTER CONSTRUCTION, LLC($3,451,000) |
|
0073-08-195 |
BEXAR |
SAN ANTONIO |
$2,770,759 |
IH 37 |
NH 2019(109) |
10/02/2018 |
11/15/2023 |
REPAIR SLOPE FAILURE |
RELMCO, INC.($2,967,147) |
|
1890-01-046 |
BEXAR |
SAN ANTONIO |
$18,393,325 |
FM 1976 |
STP 2019(111) |
10/03/2018 |
11/15/2023 |
REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERS |
CURRAN CONTRACTING COMPANY($16,483,393) |
|
0073-02-071 |
BEXAR |
SAN ANTONIO |
$2,059,166 |
US 281 |
NH 2019(273) |
12/05/2018 |
11/15/2023 |
INTERS OPERATIONAL IMPRVS |
ALL IN CONSTRUCTION, L.L.C.($1,936,000) |
|
2452-04-016 |
BEXAR |
SAN ANTONIO |
$23,174,045 |
SL 1604 |
STP 2019(510) |
02/05/2019 |
11/15/2023 |
EXPAND FROM 2 LANES TO 4 LANE DIVIDED |
MARIO SINACOLA & SONS EXCAVATING, INC.($20,172,902) |
|
0025-02-219 |
BEXAR |
SAN ANTONIO |
$62,147,181 |
IH 10 |
NH 1902(314) |
08/07/2019 |
11/15/2023 |
WIDEN FREEWAY |
JORDAN FOSTER CONSTRUCTION, LLC($91,651,868) |
|
0658-01-044 |
BEXAR |
SAN ANTONIO |
$5,732,853 |
FM 1535 |
STP 2020(557)MM |
02/07/2020 |
11/15/2023 |
EXPAND 2 TO 4 LN WITH MEDIAN, TURN LN, BIKE LN, SW |
J3 COMPANY, LLC($5,683,754) |
|
7774-01-001 |
BEXAR |
SAN ANTONIO |
$7,468,133 |
PA 1502 |
STP 2020(789)MM |
05/08/2020 |
11/15/2023 |
EXPAND 4 TO 6 LNS DIVIDED & INTERSECT OPERATIONS |
AUSTIN BRIDGE & ROAD SERVICES, LP($7,947,752) |
|
1433-01-029 |
BEXAR |
SAN ANTONIO |
$6,643,535 |
FM 2252 |
STP 2020(824)MM |
05/08/2020 |
11/15/2023 |
INTERSECT OPER IMPROV & INCL WIDEN CIBOLO CRK BRDG |
HARPER BROTHERS CONSTRUCTION LLC($6,580,023) |
|
0915-12-687 |
BEXAR |
SAN ANTONIO |
$3,755,554 |
VA |
STP 2020(898) |
06/04/2020 |
11/15/2023 |
CONST CURB RAMPS, SIDEWALKS, PED FY 20 PROJ1 |
JORDAN FOSTER CONSTRUCTION, LLC($3,621,896) |
|
0915-12-689 |
BEXAR |
SAN ANTONIO |
$6,638,102 |
VA |
STP 2020(899) |
06/04/2020 |
11/15/2023 |
CONST CURB RAMPS, SIDEWALKS, PED FY 20 PROJ2 |
J3 COMPANY, LLC($5,943,162) |
|
0025-02-215 |
BEXAR |
SAN ANTONIO |
$158,203,252 |
IH 10 |
C 25-2-215 |
07/09/2020 |
11/15/2023 |
EXPAND 4 TO 6 LN EXPRESSWAY & FROM 4 TO 4 LN FR |
ZACHRY CONSTRUCTION CORPORATION($149,200,124) |
|
0915-12-657 |
BEXAR |
SAN ANTONIO |
$3,840,003 |
CR |
STP 2B20(065)HES |
08/05/2020 |
11/15/2023 |
CONSTRUCT INTERCHANGE |
DAN WILLIAMS COMPANY($4,289,597) |
|
0658-01-045 |
BEXAR |
SAN ANTONIO |
$13,370,908 |
FM 1535 |
STP 2021(227)MM |
01/07/2021 |
11/15/2023 |
CONSTRUCT 2 WAY LT TURN LN, BIKE LNS & SDWKS |
DAN WILLIAMS COMPANY($15,523,367) |
|
0016-08-039 |
BEXAR |
SAN ANTONIO |
$7,127,370 |
SL 368 |
BR 2021(485) |
04/07/2021 |
11/15/2023 |
BRIDGE REPL |
RELMCO, INC.($6,974,797) |
|
0024-08-128 |
BEXAR |
SAN ANTONIO |
$2,178,953 |
US 90 |
STP 2017(331)HES |
01/04/2017 |
11/15/2023 |
CONSTRUCT PEDESTRIAN BRIDGE OVER US 90 |
RELMCO, INC.($2,331,043) |
|
0073-02-080 |
BEXAR |
SAN ANTONIO |
$5,066,580 |
US 281 |
C 73-2-80 |
06/04/2021 |
11/15/2023 |
INTERS IMPRVS WITH RIGHT AND/OR LEFT T |
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.($4,316,413) |
|
7774-01-004 |
BEXAR |
SAN ANTONIO |
$22,969,734 |
PA 1502 |
F 2021(678) |
07/02/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
JORDAN FOSTER CONSTRUCTION, LLC($19,520,130) |
|
0024-07-063 |
BEXAR |
SAN ANTONIO |
$2,508,773 |
US 90 |
F 2021(778) |
08/05/2021 |
11/15/2023 |
INTERS IMPRV |
DAN WILLIAMS COMPANY($2,885,971) |
|
0849-01-055 |
BEXAR |
SAN ANTONIO |
$46,872,741 |
FM 471 |
F 2022(006) |
12/02/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
HARPER BROTHERS CONSTRUCTION LLC($49,119,270) |
|
0017-10-289 |
BEXAR |
SAN ANTONIO |
$20,567,531 |
IH 35 |
BR 2023(047) |
10/07/2022 |
11/15/2023 |
SURF/ROADWAY RESTOR |
GIBSON & ASSOCIATES, INC.($25,956,303) |
|
3508-01-029 |
BEXAR |
SAN ANTONIO |
$114,537,901 |
SH 151 |
F 2023(162) |
01/06/2023 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
AUSTIN BRIDGE & ROAD SERVICES, LP($97,802,917) |
|
1477-01-043 |
BEXAR |
SAN ANTONIO |
$55,504,598 |
FM 1516 |
F 2023(874) |
08/02/2023 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
JORDAN FOSTER CONSTRUCTION, LLC($68,941,542) |
|
0465-02-027 |
BEXAR |
SAN ANTONIO |
$86,047,324 |
FM 1518 |
STP 2023(954)MM |
10/05/2023 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
SER CONSTRUCTION PARTNERS, LLC($72,780,035) |
|
2452-03-087 |
BEXAR |
SAN ANTONIO |
$158,644,827 |
SL 1604 |
F 2B24(168) |
06/06/2024 |
04/25/2024 |
WIDEN ROAD - ADD LANES |
WEBBER, LLC($155,959,723) |
|
2452-04-017 |
BEXAR |
SAN ANTONIO |
$19,927,581 |
SL 1604 |
F 2025(070) |
08/02/2024 |
06/24/2024 |
WIDEN ROAD - ADD LANES |
STERLING DELAWARE HOLDING COMPANY($16,250,383) |
|
0015-07-087 |
BELL |
WACO |
$12,215,676 |
IH 35 |
STP 2024(924)TP |
08/02/2024 |
06/21/2024 |
INFRASTRUCT IMPRVS |
TEXAS MATERIALS GROUP, INC.($12,103,561) |
|
0114-06-029 |
BASTROP |
AUSTIN |
$19,616,132 |
US 290 |
NH 2019(298) |
12/06/2018 |
11/15/2023 |
GR, BASE, STRUCT, HMACP & PVMT MKS |
ANGEL BROTHERS HOLDINGS CORP.($18,681,315) |
|
0114-05-037 |
BASTROP |
AUSTIN |
$32,993,154 |
US 290 |
NH 2019(106) |
11/07/2018 |
11/15/2023 |
GR, BASE, STRS, HMACP & PVMT MRKS |
ANGEL BROTHERS HOLDINGS CORP.($34,428,168) |
|
0517-01-043 |
ATASCOSA |
SAN ANTONIO |
$21,116,426 |
SH 16 |
STP 1802(616) |
08/08/2018 |
11/15/2023 |
REHAB & WIDEN TO PROVIDE OPERATIONAL IMPRVMNTS |
ANGEL BROTHERS HOLDINGS CORP.($22,041,915) |
|
1740-03-019 |
ATASCOSA |
SAN ANTONIO |
$5,877,527 |
FM 1333 |
STP 2023(525) |
03/08/2023 |
08/21/2024 |
HAZARD ELIM & SAFETY |
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.($4,025,336) |
|
0613-02-063 |
ATASCOSA |
SAN ANTONIO |
$5,215,910 |
SH 16 |
C 613-2-63 |
05/02/2018 |
11/15/2023 |
REPLACE EXIST BRIDGE |
HARPER BROTHERS CONSTRUCTION LLC($5,704,330) |
|
0017-04-044 |
ATASCOSA |
SAN ANTONIO |
$5,699,774 |
IH 35 |
F 2022(046) |
09/01/2021 |
11/15/2023 |
REHAB EXIST ROADWAY |
ANDERSON COLUMBIA CO., INC.($6,383,622) |
|
0748-05-040 |
ATASCOSA |
SAN ANTONIO |
$5,263,546 |
FM 140 |
STP 2019(110) |
10/02/2018 |
11/15/2023 |
GRADE, BASE, SC, SURF, PAVMT MRK |
HUNTER INDUSTRIES, LTD.($4,730,331) |