Low bids by F. D. CONCRETE, LLC

Contact Information
Phone: N/A
Address: N/A
Fax:      N/A
Low: 2
Lost: 2
Bid: 4
Subs: 0
Win ratio: 50%
Win amount: $4,732,067
Loss amount: $6,049,555
Avg win amount: $2,366,034
Avg bid amount: $2,695,405
Control County District Estimate Highway Project Date Added Type Low bidder
0915-00-178 BEXAR SAN ANTONIO $3,928,875 VA STP 1702(555) 07/12/2017 11/15/2023 CONSTRUCT CURB RAMPS_(VARIOUS LOC IN BEXAR CO) F. D. CONCRETE, LLC($3,495,290)
0915-00-179 BEXAR SAN ANTONIO $1,496,265 VA STP 2018(866) 05/02/2018 11/15/2023 CONSTRUCT CURB RAMPS F. D. CONCRETE, LLC($1,236,777)