1202-01-020 |
WILLIAMSON |
AUSTIN |
$9,601,491 |
FM 972 |
C 1202-1-20 |
06/06/2018 |
11/15/2023 |
REHAB ADD SHOULDER AND SAFETY TREAT |
DAN WILLIAMS COMPANY($8,984,216) |
|
0320-03-092 |
WILLIAMSON |
AUSTIN |
$389,915 |
SH 95 |
BR 2018(819) |
05/01/2018 |
11/15/2023 |
BRIDGE WIDENING & REPLACE APPROACHES |
DAN WILLIAMS COMPANY($330,318) |
|
1202-01-018 |
WILLIAMSON |
AUSTIN |
$3,557,125 |
FM 972 |
STP 1702(334) |
06/07/2017 |
11/15/2023 |
REHAB PAVMT, ADD SHOULDERS & SAFETY TREAT |
DAN WILLIAMS COMPANY($3,320,331) |
|
3417-02-038 |
WILLIAMSON |
AUSTIN |
$1,758,957 |
FM 734 |
STP 2B24(121)HES |
06/06/2024 |
04/25/2024 |
HWY IMPRV |
DAN WILLIAMS COMPANY($1,681,925) |
|
0440-02-022 |
WILLIAMSON |
AUSTIN |
$903,389 |
SH 195 |
STP 2B20(129)HES |
08/06/2020 |
11/15/2023 |
SAFETY IMPRV PROJECT |
DAN WILLIAMS COMPANY($882,212) |
|
0337-01-043 |
WILLIAMSON |
AUSTIN |
$5,536,145 |
SH 29 |
NH 2020(759) |
08/06/2020 |
11/15/2023 |
HWY IMPRV |
DAN WILLIAMS COMPANY($5,548,288) |
|
1201-01-014 |
WILLIAMSON |
AUSTIN |
$5,183,728 |
FM 970 |
STP 1902(005)HES |
07/09/2019 |
09/27/2024 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($5,125,069) |
|
0273-04-040 |
WILLIAMSON |
AUSTIN |
$1,538,143 |
US 183 |
STP 2020(963)HES |
06/04/2020 |
11/15/2023 |
HWY IMPRV |
DAN WILLIAMS COMPANY($1,496,433) |
|
0204-01-074 |
WILLIAMSON |
AUSTIN |
$4,943,516 |
US 79 |
STP 2024(756)HES |
02/02/2024 |
12/22/2023 |
INSTL OF MEDIAN CABLE BARRIER |
DAN WILLIAMS COMPANY($3,597,980) |
|
0320-03-099 |
WILLIAMSON |
AUSTIN |
$829,418 |
SH 95 |
BR 2018(820) |
05/02/2018 |
11/15/2023 |
REPLACE DECK AND STRUCTURAL REPAIRS |
DAN WILLIAMS COMPANY($1,149,643) |
|
0015-08-141 |
WILLIAMSON |
AUSTIN |
$15,646,512 |
IH 35 |
NH 2019(683) |
03/06/2019 |
11/15/2023 |
REPLACE BRIDGE OVERPASS AND TIE-IN APPROACHES |
DAN WILLIAMS COMPANY($15,048,230) |
|
0015-08-142 |
WILLIAMSON |
AUSTIN |
$14,305,404 |
IH 35 |
NH 2019(605) |
01/09/2019 |
11/15/2023 |
GRADING, BASE, HMACP, PVMRK & SIGNS |
DAN WILLIAMS COMPANY($13,145,763) |
|
0914-05-214 |
WILLIAMSON |
AUSTIN |
$2,192,364 |
3219 246 |
STP 2024(832)HES |
04/05/2024 |
02/23/2024 |
INTERS IMPRV |
DAN WILLIAMS COMPANY($2,006,827) |
|
0004-02-060 |
WARD |
ODESSA |
$23,238,929 |
IH 20 |
STP 1902(276)HES |
08/07/2019 |
11/15/2023 |
INSTL MEDIAN BARRIERS |
DAN WILLIAMS COMPANY($28,675,420) |
|
6438-56-001 |
TRAVIS |
AUSTIN |
$622,061 |
SL0001 |
RMC - 643856001 |
10/06/2023 |
11/15/2023 |
CONC STRUCT REPAIR |
DAN WILLIAMS COMPANY($376,968) |
|
2689-01-026 |
TRAVIS |
AUSTIN |
$388,510 |
FM 2304 |
STP 1702(681)HES |
08/08/2017 |
11/15/2023 |
CHANNELIZATION(STRIPING) |
DAN WILLIAMS COMPANY($355,909) |
|
0113-13-181 |
TRAVIS |
AUSTIN |
$3,394,650 |
SH 71 |
STP 1902(189)HES |
07/09/2019 |
09/27/2024 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($4,150,515) |
|
1200-03-060 |
TRAVIS |
AUSTIN |
$18,921,417 |
FM 973 |
STP 2022(819)HES |
03/08/2023 |
08/21/2024 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($22,834,261) |
|
1378-01-038 |
TRAVIS |
AUSTIN |
$597,501 |
RM 1431 |
STP 2019(198)HES |
11/06/2018 |
11/15/2023 |
INSTL CONTINUOUS LTL & SHOULDERS |
DAN WILLIAMS COMPANY($617,105) |
|
0683-02-075 |
TRAVIS |
AUSTIN |
$600,302 |
RM 620 |
NH 2019(754) |
04/03/2019 |
11/15/2023 |
INSTL CONC TRAF BARRIERS |
DAN WILLIAMS COMPANY($556,063) |
|
2689-01-023 |
TRAVIS |
AUSTIN |
$10,214,980 |
FM 2304 |
STP 1902(245)MM |
08/06/2019 |
11/15/2023 |
RECON EXIST 2LN RDWY TO 4 LN DIVIDED W/CLTL |
DAN WILLIAMS COMPANY($12,151,984) |
|
0113-13-182 |
TRAVIS |
AUSTIN |
$1,251,500 |
SL 360 |
STP 2020(621)HES |
03/04/2020 |
11/15/2023 |
INSTL MEDIAN BARRIER |
DAN WILLIAMS COMPANY($1,310,000) |
|
0152-01-089 |
TRAVIS |
AUSTIN |
$729,263 |
US 183 |
STP 2025(142)VRU |
10/01/2024 |
08/20/2024 |
HWY IMPRV |
DAN WILLIAMS COMPANY($855,115) |
|
0113-09-077 |
TRAVIS |
AUSTIN |
$413,697 |
US 290 |
STP 2B24(415)HES |
08/02/2024 |
06/21/2024 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($406,603) |
|
3136-01-191 |
TRAVIS |
AUSTIN |
$1,384,918 |
SL 1 |
C 3136-1-191 |
04/08/2021 |
11/15/2023 |
CONSTRUCTION OF NEW RAMP & INTERS IMPROVEMTS |
DAN WILLIAMS COMPANY($1,525,579) |
|
0114-02-113 |
TRAVIS |
AUSTIN |
$1,511,336 |
US 290 |
STP 2B24(411)HES |
08/01/2024 |
06/20/2024 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($1,219,421) |
|
1186-01-091 |
TRAVIS |
AUSTIN |
$9,593,311 |
FM 969 |
PTF 2022(045) |
09/02/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
DAN WILLIAMS COMPANY($8,953,610) |
|
1539-02-034 |
TRAVIS |
AUSTIN |
$2,233,249 |
FM 1626 |
STP 2022(341)HES |
02/04/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($2,285,065) |
|
0114-03-107 |
TRAVIS |
AUSTIN |
$442,000 |
US 290 |
CC 114-3-107 |
04/05/2023 |
11/15/2023 |
GRADING, BASE, SURF, PVMNT MRKS, AND SIGNING |
DAN WILLIAMS COMPANY($505,422) |
|
6433-70-001 |
TRAVIS |
AUSTIN |
$568,427 |
IH0035 |
RMC - 643370001 |
04/05/2024 |
02/23/2024 |
ASPH PAVMT WIDENING |
DAN WILLIAMS COMPANY($640,344) |
|
6379-23-001 |
TRAVIS |
AUSTIN |
$327,901 |
SL0001 |
RMC - 637923001 |
09/01/2021 |
11/15/2023 |
GANTRY OPERATIONAL IMPRVS |
DAN WILLIAMS COMPANY($397,011) |
|
6335-49-001 |
REEVES |
ODESSA |
$1,359,006 |
IH0020 |
RMC - 633549001 |
12/06/2018 |
11/15/2023 |
ROADWAY REPAIR |
DAN WILLIAMS COMPANY($1,684,134) |
|
0003-06-098 |
REEVES |
ODESSA |
$15,342,541 |
IH 20 |
BR 2024(510) |
11/01/2023 |
11/15/2023 |
BRIDGE REPL |
DAN WILLIAMS COMPANY($16,682,424) |
|
6407-96-001 |
REEVES |
ODESSA |
$2,172,610 |
IH0010 |
RMC - 640796001 |
03/08/2023 |
11/15/2023 |
MILL AND INLAY |
DAN WILLIAMS COMPANY($1,668,546) |
|
0139-05-048 |
REEVES |
ODESSA |
$5,303,589 |
US 285 |
NH 2020(133) |
10/02/2019 |
11/15/2023 |
ROADWAY REHAB |
DAN WILLIAMS COMPANY($6,540,325) |
|
0003-07-064 |
REEVES |
ODESSA |
$4,267,432 |
IH 20 |
C 3-7-64 |
06/29/2022 |
11/15/2023 |
TRAF SIGNAL PROGRAM (2022) |
DAN WILLIAMS COMPANY($5,899,356) |
|
0003-05-054 |
REEVES |
ODESSA |
$24,210,116 |
IH 20 |
STP 1902(275)HES |
08/06/2019 |
11/15/2023 |
INSTL MEDIAN BARRIERS |
DAN WILLIAMS COMPANY($27,958,749) |
|
0104-11-008 |
PRESIDIO |
EL PASO |
$2,882,824 |
BU 67-A |
C 104-11-8 |
08/03/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
DAN WILLIAMS COMPANY($3,445,494) |
|
0104-05-025 |
PRESIDIO |
EL PASO |
$922,393 |
SH 17 |
STP 2021(356) |
02/04/2021 |
11/15/2023 |
SURF/ROADWAY RESTOR |
DAN WILLIAMS COMPANY($1,293,211) |
|
0104-07-025 |
PRESIDIO |
EL PASO |
$2,202,315 |
US 67 |
STP 2021(412)HES |
03/04/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($2,763,015) |
|
0924-07-013 |
PRESIDIO |
EL PASO |
$4,276,707 |
VA |
STP 1802(217)TAPS |
11/06/2019 |
11/15/2023 |
TRANSPORT NON-ROADWAY |
DAN WILLIAMS COMPANY($4,630,960) |
|
0924-07-017 |
PRESIDIO |
EL PASO |
$470,999 |
CS |
STP 2020(072)TP |
04/09/2020 |
11/15/2023 |
CONSTRUCTION OF SHARED USE PATH AND SIDEWALKS |
DAN WILLIAMS COMPANY($531,477) |
|
0020-08-048 |
PRESIDIO |
EL PASO |
$13,040,978 |
US 67 |
C 20-8-48 |
01/05/2024 |
11/24/2023 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($14,287,895) |
|
0906-32-052 |
MIDLAND |
ODESSA |
$2,090,079 |
CS |
BR 2025(147) |
10/02/2024 |
08/21/2024 |
BRIDGE REPL |
DAN WILLIAMS COMPANY($1,912,117) |
|
0024-04-068 |
MEDINA |
SAN ANTONIO |
$3,508,270 |
US 90 |
STP 2023(388)HES |
12/02/2022 |
09/24/2024 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($3,156,213) |
|
0493-02-021 |
LOVING |
ODESSA |
$2,008,874 |
RM 652 |
BR 2022(031) |
10/08/2021 |
11/15/2023 |
BRIDGE REPL |
DAN WILLIAMS COMPANY($2,850,737) |
|
0114-07-080 |
LEE |
AUSTIN |
$872,756 |
US 290 |
BR 2018(271) |
11/02/2017 |
11/15/2023 |
BRIDGE REHAB |
DAN WILLIAMS COMPANY($844,010) |
|
0114-07-082 |
LEE |
AUSTIN |
$1,518,925 |
US 290 |
STP 1702(665)HES |
08/09/2017 |
11/15/2023 |
INSTL MEDIAN BARRIER |
DAN WILLIAMS COMPANY($1,336,983) |
|
0072-05-096 |
KENDALL |
SAN ANTONIO |
$2,854,419 |
IH 10 |
STP 2023(673)HES |
06/27/2023 |
11/15/2023 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($2,404,185) |
|
6334-20-001 |
JEFF DAVIS |
EL PASO |
$410,308 |
SH0017 |
BPM - 633420001 |
04/03/2019 |
11/15/2023 |
BRIDGE PREVENT MAINT (BPM) |
DAN WILLIAMS COMPANY($460,470) |
|
0358-01-027 |
JEFF DAVIS |
EL PASO |
$4,032,404 |
SH 118 |
STP 1302(022) |
11/01/2023 |
11/15/2023 |
SURF/ROADWAY RESTOR |
DAN WILLIAMS COMPANY($4,735,265) |
|
0374-07-028 |
HUDSPETH |
EL PASO |
$3,055,419 |
US 62 |
STP 2021(476)HES |
07/02/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($2,871,946) |
|
0374-06-022 |
HUDSPETH |
EL PASO |
$23,168,432 |
US 62 |
F 2022(758) |
06/29/2022 |
11/15/2023 |
HWY IMPRV |
DAN WILLIAMS COMPANY($21,060,676) |
|
0002-06-062 |
HUDSPETH |
EL PASO |
$5,305,332 |
IH 10 |
F 2023(118) |
09/07/2022 |
11/15/2023 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($4,777,419) |
|
0002-10-039 |
HUDSPETH |
EL PASO |
$18,263,528 |
IH 10 |
F 2024(040) |
09/07/2023 |
11/15/2023 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($18,357,209) |
|
0002-07-049 |
HUDSPETH |
EL PASO |
$5,465,090 |
IH 10 |
BR 1802(572) |
11/07/2018 |
11/15/2023 |
REPLACE BRIDGES AND APPROACHES |
DAN WILLIAMS COMPANY($5,693,877) |
|
0002-07-049 |
HUDSPETH |
EL PASO |
$5,721,389 |
IH 10 |
BR 1802(572) |
08/08/2018 |
11/15/2023 |
REPLACE BRIDGES AND APPROACHES |
DAN WILLIAMS COMPANY($7,766,379) |
|
2121-06-044 |
HUDSPETH |
EL PASO |
$2,923,780 |
IH 10 |
STP 1902(355)HES |
07/09/2019 |
09/27/2024 |
SAFETY |
DAN WILLIAMS COMPANY($2,234,212) |
|
0002-04-035 |
HUDSPETH |
EL PASO |
$3,760,934 |
SH 20 |
STP 2024(607)HES |
01/04/2024 |
11/23/2023 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($3,814,948) |
|
0002-04-033 |
HUDSPETH |
EL PASO |
$3,707,042 |
SH 20 |
STP 2022(820)HES |
08/04/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($3,364,597) |
|
0285-03-062 |
HAYS |
AUSTIN |
$4,135,673 |
RM 12 |
STP 2022(816)HES |
08/03/2022 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
DAN WILLIAMS COMPANY($5,093,343) |
|
6325-63-001 |
HAYS |
AUSTIN |
$339,883 |
SH0021 |
RMC - 632563001 |
02/02/2018 |
11/15/2023 |
REPLACE CULVERT STRUCT |
DAN WILLIAMS COMPANY($260,107) |
|
0017-06-091 |
FRIO |
SAN ANTONIO |
$1,608,895 |
IH 35 |
STP 2022(882)HES |
08/03/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
DAN WILLIAMS COMPANY($1,300,000) |
|
6460-65-001 |
EL PASO |
EL PASO |
$1,763,062 |
FM2529 |
RMC - 646065001 |
03/06/2024 |
01/30/2024 |
MILL AND INLAY |
DAN WILLIAMS COMPANY($1,450,032) |
|
6330-07-001 |
EL PASO |
EL PASO |
$337,623 |
IH0010 |
RMC - 633007001 |
05/01/2018 |
11/15/2023 |
SPALL & FULL DEPTH REPAIR |
DAN WILLIAMS COMPANY($534,995) |
|
0001-04-099 |
EL PASO |
EL PASO |
$5,745,766 |
US 85 |
BR 2024(837) |
04/04/2024 |
02/22/2024 |
BRIDGE REPL |
DAN WILLIAMS COMPANY($4,910,196) |
|
6330-08-001 |
EL PASO |
EL PASO |
$450,283 |
IH0010 |
RMC - 633008001 |
05/01/2018 |
11/15/2023 |
SPALL AND FULL DEPTH REPAIR |
DAN WILLIAMS COMPANY($772,020) |
|
2121-04-110 |
EL PASO |
EL PASO |
$2,466,921 |
IH 10 |
BR 2023(885) |
06/02/2023 |
11/28/2023 |
BRIDGE REPL |
DAN WILLIAMS COMPANY($2,756,557) |
|
2552-02-034 |
EL PASO |
EL PASO |
$982,043 |
SL 375 |
C 2552-2-34 |
06/04/2020 |
11/15/2023 |
MILL & OVERLAY CLEANING/RESEAL BRIDGE JOINTS |
DAN WILLIAMS COMPANY($777,686) |
|
2121-03-060 |
EL PASO |
EL PASO |
$10,960,314 |
IH 10 |
C 2121-3-60 |
06/05/2020 |
11/15/2023 |
CONSTRUCT ASPH CONC PVMNT MILL AND INLAY |
DAN WILLIAMS COMPANY($9,796,784) |
|
6388-37-001 |
EL PASO |
EL PASO |
$1,169,020 |
FM0076 |
RMC - 638837001 |
06/01/2023 |
11/28/2023 |
MILL AND INLAY |
DAN WILLIAMS COMPANY($1,061,726) |
|
6388-14-001 |
EL PASO |
EL PASO |
$1,848,217 |
SL0375 |
RMC - 638814001 |
11/03/2021 |
11/15/2023 |
RMVL AND PROPOSED CHAIN LINK FENCE REPAIR |
DAN WILLIAMS COMPANY($1,884,369) |
|
2121-02-150 |
EL PASO |
EL PASO |
$27,267,381 |
IH 10 |
NH 1702(501) |
07/12/2017 |
11/15/2023 |
INTERCHANGE IMPRVS |
DAN WILLIAMS COMPANY($25,376,264) |
|
2121-05-046 |
EL PASO |
EL PASO |
$2,613,367 |
IH 10 |
BR 2022(646) |
06/02/2022 |
09/03/2024 |
BRIDGE REPL |
DAN WILLIAMS COMPANY($2,488,273) |
|
3451-01-033 |
EL PASO |
EL PASO |
$14,340,540 |
FM 1281 |
C 3451-1-33 |
04/05/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
DAN WILLIAMS COMPANY($9,420,481) |
|
0674-02-011 |
EL PASO |
EL PASO |
$2,217,744 |
FM 76 |
BR 2000(030) |
07/11/2017 |
11/15/2023 |
REPLACE BRIDGES AND APPROACHES |
DAN WILLIAMS COMPANY($2,025,296) |
|
0002-01-108 |
EL PASO |
EL PASO |
$11,404,066 |
SH 20 |
C 2-1-108 |
05/03/2024 |
03/22/2024 |
RESURF ROADWAY |
DAN WILLIAMS COMPANY($8,421,430) |
|
2121-02-178 |
EL PASO |
EL PASO |
$6,180,451 |
IH 10 |
F 2024(655) |
01/04/2024 |
11/23/2023 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($5,680,916) |
|
2121-02-162 |
EL PASO |
EL PASO |
$1,092,016 |
IH 10 |
BR 2024(032) |
09/06/2023 |
11/15/2023 |
BRIDGE REPL |
DAN WILLIAMS COMPANY($960,423) |
|
0924-00-109 |
EL PASO |
EL PASO |
$1,431,813 |
VA |
C 924-00-109 |
03/08/2023 |
08/21/2024 |
BRIDGE MAINT |
DAN WILLIAMS COMPANY($2,271,558) |
|
0924-00-099 |
EL PASO |
EL PASO |
$2,076,392 |
VA |
STP 2018(932) |
06/05/2018 |
11/15/2023 |
FY 2018 BRIDGE MAINT |
DAN WILLIAMS COMPANY($2,093,680) |
|
2121-02-159 |
EL PASO |
EL PASO |
$473,458 |
IH 10 |
BR 1802(327) |
07/10/2018 |
11/15/2023 |
UPGRADE BRIDGE AND APPROACH RAILING |
DAN WILLIAMS COMPANY($549,262) |
|
2121-04-086 |
EL PASO |
EL PASO |
$2,429,473 |
IH 10 |
C 2121-4-86 |
07/11/2018 |
11/15/2023 |
REHAB |
DAN WILLIAMS COMPANY($1,988,430) |
|
0924-00-130 |
EL PASO |
EL PASO |
$1,112,544 |
VA |
BR 2023(519) |
03/07/2023 |
08/21/2024 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($1,135,875) |
|
2552-03-065 |
EL PASO |
EL PASO |
$12,257,957 |
SL 375 |
C 2552-3-65 |
04/04/2024 |
02/22/2024 |
SURF/ROADWAY RESTOR |
DAN WILLIAMS COMPANY($10,150,487) |
|
0167-01-095 |
EL PASO |
EL PASO |
$35,832,998 |
US 54 |
STP 1702(687)MM |
08/08/2017 |
11/15/2023 |
WIDEN BY ADDING TWO INSIDE LANES, ETC. |
DAN WILLIAMS COMPANY($33,676,149) |
|
6389-06-001 |
ECTOR |
ODESSA |
$1,632,125 |
IH0020 |
RMC - 638906001 |
11/04/2021 |
11/15/2023 |
MILL AND INLAY |
DAN WILLIAMS COMPANY($1,381,358) |
|
6366-81-001 |
ECTOR |
ODESSA |
$2,745,987 |
IH0020 |
RMC - 636681001 |
01/08/2021 |
11/15/2023 |
MILL AND INLAY |
DAN WILLIAMS COMPANY($1,923,614) |
|
6328-34-001 |
CULBERSON |
EL PASO |
$427,000 |
RM0652 |
RMC - 632834001 |
04/03/2018 |
11/15/2023 |
POTHOLE REPAIR |
DAN WILLIAMS COMPANY($684,000) |
|
0003-01-057 |
CULBERSON |
EL PASO |
$1,183,336 |
IH 10 |
STP 1702(499)HESG |
07/12/2017 |
11/15/2023 |
INSTL MEDIAN BARRIER |
DAN WILLIAMS COMPANY($957,145) |
|
0374-08-021 |
CULBERSON |
EL PASO |
$1,332,176 |
US 62 |
C 374-8-21 |
08/07/2018 |
11/15/2023 |
COUNTERMEASURE FOR BRIDGE SCOUR |
DAN WILLIAMS COMPANY($1,434,496) |
|
1158-01-009 |
CULBERSON |
EL PASO |
$2,597,422 |
FM 2185 |
C 1158-1-9 |
02/05/2019 |
11/15/2023 |
ROADWAY REHAB |
DAN WILLIAMS COMPANY($2,339,707) |
|
2451-02-013 |
CULBERSON |
EL PASO |
$49,437,215 |
RM 652 |
C 2451-2-13 |
11/04/2020 |
11/15/2023 |
FULL DEPTH REHAB |
DAN WILLIAMS COMPANY($49,745,889) |
|
0233-05-038 |
CULBERSON |
EL PASO |
$3,940,229 |
SH 54 |
BR 2023(245) |
11/03/2022 |
11/15/2023 |
CONSTRUCT BRIDGE |
DAN WILLIAMS COMPANY($6,330,874) |
|
0233-04-016 |
CULBERSON |
EL PASO |
$6,286,136 |
SH 54 |
BR 2023(510) |
06/27/2023 |
11/15/2023 |
CONSTRUCT BRIDGE |
DAN WILLIAMS COMPANY($5,340,875) |
|
1158-01-011 |
CULBERSON |
EL PASO |
$6,485,395 |
FM 2185 |
F 2B23(123) |
08/03/2023 |
11/15/2023 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($6,981,729) |
|
6373-23-001 |
CULBERSON |
EL PASO |
$588,040 |
FM2185 |
RMC - 637323001 |
02/04/2022 |
11/15/2023 |
CATTLEGUARD REPL STRUCT MATERIALS |
DAN WILLIAMS COMPANY($669,600) |
|
0003-01-064 |
CULBERSON |
EL PASO |
$27,260,465 |
IH 10 |
F 2024(654) |
01/05/2024 |
11/24/2023 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($29,566,262) |
|
0020-01-021 |
CULBERSON |
EL PASO |
$5,996,118 |
US 90 |
C 20-1-21 |
06/02/2023 |
11/28/2023 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($5,952,638) |
|
0020-01-022 |
CULBERSON |
EL PASO |
$5,718,574 |
US 90 |
C 20-1-22 |
12/01/2022 |
09/24/2024 |
REHAB EXIST ROADWAY |
DAN WILLIAMS COMPANY($6,496,447) |
|
6322-18-001 |
COMAL |
SAN ANTONIO |
$204,893 |
FM3009 |
RMC - 632218001 |
01/31/2018 |
11/15/2023 |
DRAINAGE IMPRVS |
DAN WILLIAMS COMPANY($165,000) |
|
3212-05-013 |
COMAL |
SAN ANTONIO |
$15,685,045 |
FM 3351 |
STP 2024(729)MM |
02/02/2024 |
12/22/2023 |
BRIDGE REPL |
DAN WILLIAMS COMPANY($12,558,078) |
|
0358-02-031 |
BREWSTER |
EL PASO |
$6,143,841 |
SH 118 |
C 358-2-31 |
01/04/2024 |
11/23/2023 |
SURF/ROADWAY RESTOR |
DAN WILLIAMS COMPANY($7,843,264) |
|
0021-01-053 |
BREWSTER |
EL PASO |
$4,287,972 |
US 67 |
NH 2017(324) |
01/04/2017 |
11/15/2023 |
ROADWAY REHAB |
DAN WILLIAMS COMPANY($4,010,558) |
|
0915-12-531 |
BEXAR |
SAN ANTONIO |
$732,327 |
CS |
BR 1402(213) |
01/10/2020 |
09/26/2024 |
BRIDGE REPL |
DAN WILLIAMS COMPANY($988,635) |
|
0024-07-063 |
BEXAR |
SAN ANTONIO |
$2,508,773 |
US 90 |
F 2021(778) |
08/05/2021 |
11/15/2023 |
INTERS IMPRV |
DAN WILLIAMS COMPANY($2,885,971) |
|
0658-01-045 |
BEXAR |
SAN ANTONIO |
$13,370,908 |
FM 1535 |
STP 2021(227)MM |
01/07/2021 |
11/15/2023 |
CONSTRUCT 2 WAY LT TURN LN, BIKE LNS & SDWKS |
DAN WILLIAMS COMPANY($15,523,367) |
|
0915-12-657 |
BEXAR |
SAN ANTONIO |
$3,840,003 |
CR |
STP 2B20(065)HES |
08/05/2020 |
11/15/2023 |
CONSTRUCT INTERCHANGE |
DAN WILLIAMS COMPANY($4,289,597) |
|
0291-10-110 |
BEXAR |
SAN ANTONIO |
$2,116,136 |
SH 16 |
NH 2019(511) |
02/06/2019 |
11/15/2023 |
RECON EXIST CULVERT |
DAN WILLIAMS COMPANY($2,107,962) |
|
2230-01-013 |
BEXAR |
SAN ANTONIO |
$16,562,969 |
FM 1560 |
STP 1802(618) |
08/08/2018 |
11/15/2023 |
GRAD, STR, BASE, SURF |
DAN WILLIAMS COMPANY($17,810,211) |
|
0072-12-198 |
BEXAR |
SAN ANTONIO |
$1,453,745 |
IH 10 |
NH 2018(862) |
05/01/2018 |
11/15/2023 |
INTERS AND OPERATIONAL IMPRVS |
DAN WILLIAMS COMPANY($1,598,613) |
|
2230-01-018 |
BEXAR |
SAN ANTONIO |
$3,577,844 |
FM 1560 |
STP 2016(752)MM |
04/05/2017 |
11/15/2023 |
CONSTRUCT 2 LANE ROADWAY ON NEW LOCATION |
DAN WILLIAMS COMPANY($3,419,685) |
|
0291-10-114 |
BEXAR |
SAN ANTONIO |
$12,697,749 |
SH 16 |
CM 2022(476) |
05/05/2022 |
08/31/2024 |
INTERS IMPRV |
DAN WILLIAMS COMPANY($17,256,832) |
|
2230-01-016 |
BEXAR |
SAN ANTONIO |
$1,544,303 |
FM 1560 |
STP 2017(477) |
01/05/2017 |
11/15/2023 |
REPLACE EXIST CULVERT WITH BRIDGE |
DAN WILLIAMS COMPANY($1,447,520) |
|
6345-94-001 |
BEXAR |
SAN ANTONIO |
$238,650 |
SL1604 |
RMC - 634594001 |
11/13/2019 |
11/15/2023 |
CONC RAIL AND RETAINING WALL REPAIR |
DAN WILLIAMS COMPANY($127,075) |
|
6352-81-001 |
BEXAR |
SAN ANTONIO |
$284,489 |
FM1560 |
RMC - 635281001 |
03/17/2020 |
11/15/2023 |
RETAINING WALL RAIL RETROFIT |
DAN WILLIAMS COMPANY($370,997) |
|
0265-05-089 |
BASTROP |
AUSTIN |
$1,020,079 |
SH 71 |
STP 2023(734)HES |
05/04/2023 |
11/15/2023 |
INTERS IMPRV |
DAN WILLIAMS COMPANY($1,108,816) |
|
1186-02-025 |
BASTROP |
AUSTIN |
$2,292,119 |
FM 969 |
STP 2022(818)HES |
08/04/2022 |
11/15/2023 |
WIDEN ROAD - ADD SHOULDERS |
DAN WILLIAMS COMPANY($2,496,797) |
|
6347-07-001 |
BASTROP |
AUSTIN |
$241,332 |
FM2104 |
BPM - 634707001 |
12/10/2019 |
11/15/2023 |
BRIDGE PREVENT MAINT |
DAN WILLIAMS COMPANY($277,914) |
|
6329-34-001 |
BANDERA |
SAN ANTONIO |
$1,447,056 |
SH0016 |
RMC - 632934001 |
04/03/2018 |
11/15/2023 |
GUARDRAIL REPAIR |
DAN WILLIAMS COMPANY($1,235,997) |