CLEAN/SWEEP-OUTSIDE MAIN LANE-AREA(40)

Engineer's Estimate
  • Average 501.6666666666667
  • Maximum 800.0
  • Minimum 350.0
Bid
  • Average Bid: 607.4055555555556