CLEAN /SWEEP-OUTSIDE MAIN LANE-AREA(14)

Engineer's Estimate
  • Average 1234.2057142857143
  • Maximum 5779.0
  • Minimum 110.0
Bid
  • Average Bid: 1134.3362