CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(5)

Engineer's Estimate
  • Average 1048.1826923076924
  • Maximum 3122.0
  • Minimum 37.0
Bid
  • Average Bid: 1045.3855974842768