CLEAN / SWEEP-OUTSIDE MAIN LANE-AREA(1)

Engineer's Estimate
  • Average 291.85923076923075
  • Maximum 580.0
  • Minimum 130.0
Bid
  • Average Bid: 320.34592592592594