Bid Cobra

MANHOLE (SAN SEWER) (4' DIA) (FGL)(DR)

Engineer's Estimate

Average: $5,500.00
Maximum: $5,500.00
Minimum: $5,500.00

Bid Information

Average Bid: $9,358.25