SET (TY I)(S= 6 FT)(HW= 6 FT)(6:1) (P)
Engineer's Estimate
Average:
$9,500.00
Maximum:
$9,500.00
Minimum:
$9,500.00
Bid Information
Average Bid:
$11,238.03
